DPWH Baguio City DEO
DPWH implementing office eef461fa631a0a296db8
Overview
DPWH contracts
920
Total listed value
₱11.72B
Distinct contractors
177
More info
Level
DPWH office
Records span
Feb 2, 2016 – Jul 6, 2026
Largest contractors
A.P.B. CONSTRUCTION₱380.4M
The largest contractor holds 41.7% of this office's listed value.
Latest 25 from a total of 920 records
| Contract ID | Start | Description | Status | Contractor | Amount |
|---|---|---|---|---|---|
| 19PD0012 | 7 yrs 4 mo ago | CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ON SPECIFIC LOCATIONS-ALONG ASIN ROAD (S04723LZ)-K0308+930-K0309+070Roads | Completed | AG CONSTRUCTION | ₱5.9M |
| 19PD0021 | 7 yrs 4 mo ago | OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF LAYBYS-ON SPECIFIC LOCATIONS ALONG QUIRINO H-WAY (BAGUIO-BAUANG) (S00420LZ) KO299+570 TO KO303+790Roads | Completed | 4RMCONSTRUCTION & SUPPLIES | ₱8.8M |
| 19PD0041 | 7 yrs 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONST. OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY HOLY GHOST PROPER, BAGUIO CITY, BENGUETBuildings and Facilities | Completed | BLC CONSTRUCTION AND AGGREGATES | ₱1.9M |
| 19PD0042 | 7 yrs 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BGRY. SOUTH SANITARY, BAGUIO CITY, BENGUETBuildings and Facilities | Completed | SHARAMALLE CONSTRUCTION AND GENERAL ENGINEERING | ₱976.0K |
| 19PD0047 | 7 yrs 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DOMINICAN-MIRADOR, BAGUIO CITYBuildings and Facilities | Completed | RC PULMANO CONSTRUCTION & SUPPLY | ₱1.9M |
| 19PD0050 | 7 yrs 4 mo ago | REHABILITATION/MAJOR REPAIR OF OTHER BUILDING-REPAIR/REHABILITATION OF THE SENATE BUILDING ANNEX III (SENATE PRESIDENT'S COTTAGE) LUALHATI DRIVE, BAGUIO CITYBuildings and Facilities | Completed | GREAT ZONE ENTERPRISE | ₱3.3M |
| 19PD0051 | 7 yrs 4 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF CANAL AT IMMERSION ALLEY PUROK 3, BRGY. CITY CAMP CENTRAL, BAGUIO CITY, BENGUETFlood Control and Drainage | Completed | TUQUER BUILDERS | ₱1.9M |
| 19PD0052 | 7 yrs 4 mo ago | CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE- CONSTRUCTION OF DRAINAGE CANAL AND PROTECTIVE WALL, BRGY. ALFONSO TABORA, BAGUIO CITY, BENGUETFlood Control and Drainage | Completed | W.E.G. CONSTRUCTION | ₱938.7K |
| 19PD0055 | 7 yrs 4 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF DRAINAGE, BRGY. UPPER MAGSAYSAY, BAGUIO CITY, BENGUETFlood Control and Drainage | Completed | ATOLBA CONSTRUCTION | ₱2.0M |
| 19PD0056 | 7 yrs 4 mo ago | CONTRUCTION OF DRAINAGE STRUCTURE-CONSTRUCTION OF SEWERLINE (MALVAR AND SGT. FLORES) BRGY. AURORA HILL PROPER, BAGUIO CITY, BENGUETFlood Control and Drainage | Completed | W.E.G. CONSTRUCTION | ₱1.9M |
| 19PD0058 | 7 yrs 4 mo ago | REHAB/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE-REH OF SEWERLINE AT PUROK 2 AND 6 BRGY. BROOKSIDE, BAGUIO CITY, BENGUETFlood Control and Drainage | Completed | HILLSTONE BUILDERS | ₱967.7K |
| 19PD0064 | 7 yrs 4 mo ago | CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF ROAD (NAGUILIAN ROAD TO PUROK 7), SAN LUIS EXTENSION, BRGY. SAN LUIS, BAGUIO CITY, BENGUETRoads | Completed | H.D. DE CASTRO CONSTRUCTION | ₱2.0M |
| 19PD0082 | 7 yrs 4 mo ago | REHABILITATION OF PAVED ROAD, REHABILITATION OF MULBERRY ROAD, ASIN, BAGUIO, BENGUETRoads | Completed | BENTRIX BUILDERS | ₱2.3M |
| 19PD0083 | 7 yrs 4 mo ago | CONSTRUCTION OF CONCRETE ROAD AND CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-MARCOS HIGHWAY TO WESTERNLINK CIRCUMFERENTIAL ROAD BYPASS, BAGUIO CITYGAA 2019 OO-1 | Completed | GREAT ZONE ENTERPRISE (33485) / JOMARCANN GENERAL CONSTRUCTION | ₱44.1M |
| 19PD0039 | 7 yrs 4 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), STO ROSARIO, BAGUIO CITY, BENGUETBuildings and Facilities | Completed | BOYDROCK CONSTRUCTION | ₱989.8K |
| 19PD0059 | 7 yrs 4 mo ago | REH/MAJ REPAIR OF FLOOD CONTROL STRUCT-REH OF SEWERLINE FRONTING DOMINGUEZ RESIDENCE GOING UP TO RIVERA'S RESIDENCE, BRGY. HONEYMOON-HOLYGHOST, BAGUIO CITY, BENGUETFlood Control and Drainage | Completed | BOYDROCK CONSTRUCTION | ₱2.0M |
| 19PD0024 | 7 yrs 5 mo ago | OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF LAYBYS-ALONG PACDAL ROAD (S00461LZ) KO253+640 TO KO253+700Roads | Completed | FAMILY CIRCLE CONSTRUCTION | ₱6.1M |
| 19PD0036 | 7 yrs 5 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL) PHASE 2, BRGY. MRR-QUEEN OF PEACE, BAGUIO CITY, BENGUETBuildings and Facilities | Completed | SEGAL CONSTRUCTION | ₱945.0K |
| 19PD0040 | 7 yrs 5 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (COMPLETION) OF THE MULTI-PURPOSE BUILDING, BRGY. IMELDA R. MARCOS, BAGUIO CITY, BENGUETBuildings and Facilities | Completed | JYP CONSTRUCTION | ₱998.1K |
| 19PD0069 | 7 yrs 5 mo ago | CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF ROAD AT KALAPATI ST. (PANGWI TO JUNCTION PINGET AND LOWER QUIRINO HILL BARANGAY RESIDENCE), BRGY. DIZON-MANZANILLO, BAGUIO CITY, BENGUETRoads | Completed | SEGAL CONSTRUCTION | ₱1.9M |
| 19PD0010 | 7 yrs 5 mo ago | CONT. PACKAGE 1: CONST. OF ROAD SLOPE PROT. STRUCT. ON SPECIFIC LOCATIONS ALONG A) KENNON RD (S00407LZ) KO 241+145-K0247+890 B) QUIRINO H-WAY (BAGUIO-BAUANG) (S00420LZ) K0303+462-KO303+512 C) QUEZON HILL RD#1 (S04690LZ) KO308+345-K0308+428Roads | Completed | GOLDRICH CONSTRUCTION AND TRADING | ₱70.3M |
| 19PD0016 | 7 yrs 5 mo ago | CONSTRUCTION OF CONCRETE ROAD AND CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE MAJOR MANE TO KENNON ROAD BY-PASS ROAD, BAGUIO CITYRoads | Completed | GOLDRICH CONSTRUCTION AND TRADING | ₱61.5M |
| 19PD0032 | 7 yrs 5 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/REHABILITATION OF FLOOD CONTROL MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG CITY CAMP LAGOON DRAIN TUNNEL, BAGUIO CITYFlood Control and Drainage | Completed | KANE CONSTRUCTION, INC. | ₱19.6M |
| 19PD0075 | 7 yrs 5 mo ago | REHABILITATION OF PAVED ROAD-REHABILITATION OF ROAD (FROM PUROK 2 TO PUROK 6) BRGY. UPPER DAGSIAN, BAGUIO CITY, BENGUETRoads | Completed | JFALMAZAN CONSTRUCTION AND SUPPLY | ₱990.8K |
| 19PD0004 | 7 yrs 5 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BUED RIVER (MAIN), BAGUIO CITYFlood Control and Drainage | Completed | BLC CONSTRUCTION AND AGGREGATES | ₱22.9M |