DREIRICH BUILDERS (39521) / RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)
Contractor 094441c4d6d59254a126
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱2.12B · 24 contracts
Rank by recorded value
#1,402 of 23,487
More info
First record
Mar 7, 2018 (8 yrs 8 mo ago)
Latest record
Mar 25, 2022 (4 yrs 7 mo ago)
DPWH contractor code
10433
Where they work
Latest 24 from a total of 24 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 22L00080 | 4 yrs 7 mo ago | CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL PROJECT, BRGY. RUPARAN (SECTION 2), DIGOS CITY, DAVAO DEL SURGAA 2022 CSSP | Completed | Region XI | ₱178.5M |
| 21LB0128 | 5 yrs 3 mo ago | CONSTRUCTION OF ROAD AT CEBOLE, SITIO GALACIA, BRGY. COLOSAS, PAQUIBATO DISTRICT, DAVAO CITYRoads | Completed | Davao City DEO | ₱76.7M |
| 21L00081 | 5 yrs 3 mo ago | ROAD WIDENING ALONG BABAK - SAMAL - KAPUTIAN ROAD (S00095MN) K1503 + 750 - K1504 + 524, DAVAO DEL NORTERoads | Completed | Region XI | ₱24.8M |
| 21L00082 | 5 yrs 3 mo ago | ROAD WIDENING ALONG BABAK - SAMAL - KAPUTIAN ROAD (S00095MN) K1504 + 524 - K1505 +287, DAVAO DEL NORTERoads | Completed | Region XI | ₱25.0M |
| 21LB0116 | 5 yrs 4 mo ago | CONSTRUCTION OF FLOOD MITIGATION FACILITY - STA. MARINA SECTION, BRGY. TIGATTO, DAVAO CITYGAA 2021 OO-2 | On-Going | Davao City DEO | ₱96.5M |
| 21L00087 | 5 yrs 6 mo ago | CONSTRUCTION OF CONCRETE ROAD - ISLAND GARDEN CITY OF SAMAL (IGACOS) CIRCUMFERENTIAL ROAD, DAVAO DEL NORTERoads | On-Going | Region XI | ₱95.3M |
| 20L00044 | 5 yrs 10 mo ago | CONSTRUCTION OF CONCRETE ROAD-FATIMA-MALABOG ROAD (MALABOG-GUMITAN), PACKAGE D, DAVAO CITYRoads | On-Going | Region XI | ₱144.3M |
| 20L00056 | 6 yrs 7 mo ago | CONSTRUCTION OF CONCRETE ROAD-SITIO BARACAYO-SITIO SAN AGUSTIN ROAD CONNECTING TO BANANA PROCESSING AREA AND VEGIE NOODLE PROCESSING FACILITY IN SUPPORT TO BANANA AND VEGETABLE INDUSTRIES, TORIL DISTRICT, DAVAO CITYRoads | On-Going | Region XI | ₱98.5M |
| 20LB0076 | 6 yrs 8 mo ago | CONSTRUCTION OF DRAINAGE ALONG JCT. PORRAS-N. TORREST ST. - DEL PILAR ST. - JCT. DACUDAO AVE., DAVAO CITYFlood Control and Drainage | Completed | Davao City DEO | ₱34.6M |
| 20LH0043 | 6 yrs 8 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE AT SUAWAN BRIDGE (B00212MN) ALONG DAVAO-BUKIDNON RD, DAVAO CITYBridges | Completed | Davao City 2nd DEO | ₱28.5M |
| 20LH0052 | 6 yrs 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ALONG LIPADAS RIVER, LIZADA-SIRAWAN, LIZADA, DAVAO CITYFlood Control and Drainage | Completed | Davao City 2nd DEO | ₱47.5M |
| 20LD0060 | 6 yrs 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ALONG PILAN RIVER, STA. CRUZ, DAVAO DEL SURFlood Control and Drainage | Completed | Davao del Sur DEO | ₱49.0M |
| 19LH0014 | 7 yrs 4 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ALONG LIPADAS RIVER, CROSSING BAYABAS, TORIL DISTRICT, 3RD CONGRESSIONAL DISTRICT, DAVAO CITYFlood Control and Drainage | Completed | Davao City 2nd DEO | ₱48.8M |
| 19LH0010 | 7 yrs 4 mo ago | RIVER TRAINING WORKS AT SUAWAN RIVER (DOWNSTREAM SECTION), SUAWAN, MARILOG DISTRICT, DAVAO CITYFlood Control and Drainage | Completed | Davao City 2nd DEO | ₱49.0M |
| 18L00077 | 8 yrs 3 mo ago | CONCRETING OF MONKAYO-COMPOSTELA ROAD, PACKAGE B, INCLUDING ROW, COMPOSTELA VALLEYRoads | Completed | Region XI | ₱223.2M |
| 18L00060 | 8 yrs 4 mo ago | WIDENING (4 INTO 6 LANES) OF DAANG MAHARLIKA INCL ROW, (BRGY. BUHANGIN & BRGY. SASA SECT.),DAVAO CITRoads | Completed | Region XI | ₱80.1M |
| 18LB0040 | 8 yrs 5 mo ago | CONST. OF CONC. REVETMENT OF STEEL SHEET PILES ALONG DAVAO RIVER,BOLTON BRIDGE DOWNSTREAM SECTION, RFlood Control and Drainage | Completed | Davao City DEO | ₱96.4M |
| 18LC0025 | 8 yrs 6 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG TAGUM-LIBUGANON RIVER, DOWNSTREAM/UPSTREAM OF MIRANDA BRIDGE II, TAGUM CITY, DAVAO DEL NORTEFlood Control and Drainage | Completed | Davao del Norte DEO | ₱91.2M |
| 18L00001 | 8 yrs 7 mo ago | REHAB./RECONST. OF DAMAGED PAVED RD ALONG DVO.-COT. RD.,(DAVAO CITY-JCT. DIGOS SECT.),ZONE III-TAGABRoads | Completed | Region XI | ₱180.4M |
| 18LC0023 | 8 yrs 7 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG HIJO RIVER (DOWNSTREAM OF HIJO BRIDGE) INCL. ROW, TAGUM CITY, DAVAO DEL NORTEFlood Control and Drainage | Completed | Davao del Norte DEO | ₱91.7M |
| 18LC0024 | 8 yrs 7 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ON STEEL SHEET PILES ALONG HIJO RIVER (UPSTRAM OF HIJO BRIDGE) INCL. ROW, TAGUM CITY, DAVAO DEL NORTEFlood Control and Drainage | Completed | Davao del Norte DEO | ₱90.9M |
| 18L00018 | 8 yrs 8 mo ago | WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCLUDING SLOPE PROTECTION & ROW (BRGY. MARILOG SECT.Roads | Completed | Region XI | ₱148.0M |
| 18LD0028 | 8 yrs 8 mo ago | CONSTRUCTION OF CONCRETE REVETMENT ALONG CORONON RIVER, STA. CRUZ, DAVAO DEL SURFlood Control and Drainage | Completed | Davao del Sur DEO | ₱47.5M |
| 18LH0004 | 8 yrs 8 mo ago | ROAD CONCRETING, CALINAN-MAGTUOD, BRGY. NEW VALENCIA PORTION TO SITIO LUMAN, NEW VALENCIA TO BRGY. TALANDANG, TUGBOK-CALINAN DISTRICTS, DAVAO CITYRoads | Completed | Davao City 2nd DEO | ₱70.2M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.