G.F. FABIAN CONSTRUCTION
Contractor 2818273f55a31e700f4e
Overview
PhilGEPS awards
₱7.40B · 143 awards
DPWH contracts
₱5.23B · 118 contracts
Rank by recorded value
#259 of 23,487
More info
First record
Oct 15, 2015 (11 yrs 1 mo ago)
Latest record
Aug 11, 2026 (3 mos ago)
DPWH contractor code
38962
Where they work
Latest 25 from a total of 118 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 23OE0199 | 3 yrs 8 mo ago | CONSTRUCTION OF RETENTION BASIN AT ESTERO DELA REINA (PHASE XV), TONDO, MANILAFlood Control and Drainage | Completed | North Manila DEO | ₱94.8M |
| 23DF0070 | 3 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHAB./ RECONST. OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS DOCK JCT-AIRFIELD VIA SN JOSE PT RD - K0001 + (-191)-K0001+(-015)Roads | Completed | Cavite 1st DEO | ₱37.2M |
| 23OE0083 | 3 yrs 8 mo ago | CONSTRUCTION OF BOX CULVERT ALONG ANONAS ST., MANILA CITYFlood Control and Drainage | Completed | North Manila DEO | ₱44.1M |
| 23DN0046 | 3 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, HALANG CREEK TO MUNTINDILAW RIVER, ALONG MARIKINA DIVERSION ROAD TO MARIKINA-INFANTA ROAD (PHASE 4), ANTIPOLO CITY (FIRST DISTRICT)GAA 2023 OO-2 | Completed | Rizal 1st DEO | ₱96.5M |
| 23OE0051 | 3 yrs 9 mo ago | CONSTRUCTION OF RETARDING BASIN AT ESTERO DE MAYPAJO, (PHASE II), TONDO, MANILAFlood Control and Drainage | Completed | North Manila DEO | ₱34.3M |
| 23OE0148 | 3 yrs 9 mo ago | CONSTRUCTION (COMPLETION) OF DPWH NORTH MANILA DISTRICT ENGINEERING OFFICE (PERMANENT OFFICE), MANILA CITY, PHASE IIBuildings and Facilities | Completed | North Manila DEO | ₱49.0M |
| 23OE0026 | 3 yrs 9 mo ago | REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - NAGTAHAN FLY-OVER (B03338LZ) ALONG NAGTAHAN BRIDGE / FLY-OVERBridges | Completed | North Manila DEO | ₱48.8M |
| 23OE0029 | 3 yrs 9 mo ago | REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - MABINI BR. (NAGTAHAN BR.) (B01733LZ) ALONG NAGTAHAN BRIDGE / FLY - OVERBridges | Completed | North Manila DEO | ₱49.0M |
| 22DF0382 | 3 yrs 10 mo ago | REHAB. OF DISASTER - RELATED INFRASTRUCTURE AND OTHER FACILITIES, RELEASE OF FUNDS FOR THE CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF REVETMENT ALONG ILANG-ILANG RIVER BRGY. SAN ANTONIO, NOVELETAFlood Control and Drainage | Completed | Cavite 1st DEO | ₱28.9M |
| 22DF0383 | 3 yrs 10 mo ago | REHABILITATION OF DISASTER - RELATED INFRASTRUCTURE AND OTHER FACILITIES, RELEASE OF FUNDS FOR THE CONSTRUCTION OF REVETMENT ALONG ILANG-ILANG RIVER, BRGY. BACAO II, GENERAL TRIAS CITY, CAVITE WHICH WAS AFFECTED BY TYPHOON 'PAENG',Flood Control and Drainage | Completed | Cavite 1st DEO | ₱39.6M |
| 22D00091 | 4 yrs ago | CONSTRUCTION OF MALAGASANG FLYOVER AT MALAGASANG SEGMENT 1, IMUS CITYBridges | Completed | Region IV-A | ₱119.2M |
| 22OH0152 | 4 yrs 3 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPV'T. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS)-CONST. OF TYPHOON SHELTER HANGAR FOR FIXED WING AIRCRAFT, COLONEL JESUBuildings and Facilities | Completed | South Manila DEO | ₱14.3M |
| 21OG0149 | 4 yrs 3 mo ago | PROPOSED CONSTRUCTION OF THE UNIVERSITY OF THE PHILIPPINES DILIMAN SWIMMING POOL AND STADIUM, QUEZON CITYBuildings and Facilities | On-Going | Quezon City 2nd DEO | ₱84.5M |
| 22OG0140 | 4 yrs 3 mo ago | COMPLETION OF PROPOSED CONSTRUCTION OF THE UNIVERSITY OF THE PHILIPPINES DILIMAN SWIMMING POOL AND STADIUM, QUEZON CITYBuildings and Facilities | On-Going | Quezon City 2nd DEO | ₱62.8M |
| 22OH0146 | 4 yrs 3 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF WALKWAY BRIDGE/HANGING BRIDGE OVER PASIG RIVER AT STA.ANA MARKBridges | Completed | South Manila DEO | ₱49.5M |
| 22D00090 | 4 yrs 4 mo ago | CONSTRUCTION OF FLYOVER ALONG OPEN CANAL ROAD, INTERSECTION OF MALAGASANG ROAD, IMUS, CAVITEBridges | Completed | Region IV-A | ₱49.4M |
| 22DN0127 | 4 yrs 4 mo ago | REHABILITATION OF DRAINAGE AT GENERAL RICARTE ST., BARANGAY SAN JUAN CAINTA, RIZAL (FIRST DISTRICT)Flood Control and Drainage | On-Going | Rizal 1st DEO | ₱9.8M |
| 22DN0124 | 4 yrs 5 mo ago | DRAINAGE REHABILITATION, GENERAL RICARTE ST., BRGY. SAN JUAN CAINTA, RIZAL (FIRST DISTRICT)Flood Control and Drainage | Completed | Rizal 1st DEO | ₱9.0M |
| 22OE0124 | 4 yrs 7 mo ago | CONSTRUCTION (COMPLETION) OF DPWH NORTH MANILA DISTRICT ENGINEERING OFFICE (PERMANENT OFFICE), MANILA CITY, PHASE IIBuildings and Facilities | Completed | North Manila DEO | ₱49.0M |
| 22DN0073 | 4 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT ANGONO RIVER, BRGY. SAN VICENTE, ANGONO, RIZAL (FIRST DISTRICT)Flood Control and Drainage | Completed | Rizal 1st DEO | ₱27.3M |
| 22OG0093 | 4 yrs 7 mo ago | CONSTRUCTION OF PERIMETER WALL, CAMP GENERAL EMILIO AGUINALDO, QUEZON CITYBuildings and Facilities | Completed | Quezon City 2nd DEO | ₱77.2M |
| 22OE0109 | 4 yrs 8 mo ago | BANK IMPROVEMENT (STEEL SHEET PILE) ALONG ESTERO DE VITAS, BARANGAY 151, TONDO, MANILA CITYFlood Control and Drainage | Completed | North Manila DEO | ₱24.5M |
| 21OE0153 | 5 yrs 2 mo ago | ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - EDSA REHABILITATION / IMPROVEMENT INCLUDING OTHER MAJOR ROADS IN METRO MANILA - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE, NAGTAHAN FBridges | Completed | North Manila DEO | ₱48.2M |
| 21OH0146 | 5 yrs 2 mo ago | LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL BRIDGE-CONST. OF WALKWAY BRIDGE/HANGING BRIDGE OVER PASIG RIVER AT STA. ANA MARKET TO BRGY. 900, PUNTA, STA. ANA, MANILABridges | Completed | South Manila DEO | ₱49.0M |
| 21OH0083 | 5 yrs 3 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEM/WATER SUPPLY SYSTEM-CONSTRUCTION OF WATERLINE DISTRIBUTION SYSTEM,COLONEL JESUS VILLAMOR AIRBASE (CJVAB), PASAY CITYFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Water Supply (Level 2 & 3): Construction (Piped Water with Communal/Private Water Point) | Completed | South Manila DEO | ₱31.8M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.