VICENTE T. LAO CONSTRUCTION
Contractor 3a137d8f74c4b44c5d2d
Overview
PhilGEPS awards
₱56.84B · 630 awards
DPWH contracts
₱34.86B · 409 contracts
Rank by recorded value
#11 of 23,487
More info
First record
Aug 6, 2007 (19 yrs 3 mo ago)
Latest record
Dec 17, 2025 (11 mos ago)
DPWH contractor code
7040
Where they work
Davao del Sur₱14.76B
South Cotabato₱14.25B
Misamis Oriental₱7.94B
Sarangani₱4.52B
Surigao del Norte₱2.98B
Latest 25 from a total of 409 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 17MG0090 | 9 yrs 4 mo ago | MFO 1 - NATIONAL ROAD NETWORK SERVICES: ASSET PRESERVATION OF NATIONAL-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY COTABATO-MARBEL RD-K1729+709-K1731+000 MODIFIED TO: MFO 1 - NATIONAL ROAD NETWORK SERVICES: ASSET PRESERVRoads | Completed | South Cotabato 2nd DEO | ₱67.4M |
| 17J00028 | 9 yrs 5 mo ago | REPLACEMENT OF BARRA BRIDGE NO.2 PHASE II ALONG BARRA-MINAOG ROAD LEADING TO DIPOLOG CITY AIRPORT, DIPOLOG CITY, ZAMBOANGA DEL NORTEBridges | Completed | Region IX | ₱70.7M |
| 17M00035 | 9 yrs 5 mo ago | ROAD WIDENING OF COTABATO-MARBEL ROAD, K1758+900 K1762+269 (CHAINAGE 47948 -CHAINAGE 51668), STO. NIÑO, SOUTH COTABATORoads | Completed | Region XII | ₱89.6M |
| 17M00034 | 9 yrs 5 mo ago | ROAD WIDENING OF COTABATO-MARBEL ROAD, K1753+380 K1761+900 (CHAINAGE 42728 - CHAINAGE 51293), STO NIÑO, SOUTH COTABATORoads | Completed | Region XII | ₱144.8M |
| 17M00071 | 9 yrs 5 mo ago | ROAD OPENING OF SURALLAH-T'BOLI-SAN JOSE ROAD (GEN. SANTOS CITY) PACKAGE 4, BRGY. T'BOLI-BRGY. MAAN SECTION, T'BOLI, SOUTH COTABATORoads | Completed | Region XII | ₱144.7M |
| 17N00014 | 9 yrs 5 mo ago | REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, SLOPE COLLAPSE, AND LANDSLIDE, DINAGAT - LORETO ROAD, K0020+000 - K0020+440, K0031+000 - K0031+290, DINAGAT ISLANDSRoads | Completed | Region XIII | ₱148.8M |
| 17L00155 | 9 yrs 5 mo ago | CONC. OF KAPATAGAN-TIBOLO RD LEADING TO CULTURAL/TRIBAL COMMUNITIES & SCHOOL OF LIVING TRADITION,TIBRoads | Completed | Region XI | ₱88.0M |
| 17H00003 | 9 yrs 6 mo ago | MF0 1- NATIONAL ROAD NETWORK SERVICES-ASSET PRESERVATION OF NATIONAL ROADS-RREHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDERoads | Completed | Region VII | ₱87.8M |
| 17M00024 | 9 yrs 6 mo ago | ROAD UPGRADING (UNPAVED TO PAVED) ALONG MIDSAYAP-MARBEL ROAD, K1773+720-K1774+405 (CHAINAGE 4660 - CHAINAGE 5347), K1796+579 - K1779+802 (CHAINAGE 10492-CHAINAGE 10715); K1780+520-K1781+081 ( CHAINAGE 11430 TO CHAINAGE 12059), K1781+094- K1781+238 ( CHAINRoads | Completed | South Cotabato 2nd DEO | ₱96.3M |
| 17J00046 | 9 yrs 6 mo ago | ROAD UPGRADING (UNPAVED TO PAVED) OF RIZAL - DAKAK - DAPITAN COASTAL LOOP ROAD, ZAMBOANGA DEL NORTE (3RD DEO), K1844+200.00 - K1844+828.00, K1844+903.00 - K1845+419.00, K1845+518.00 - K1845+107.00, K1846+390.00 - K1846+570.00, K1846+630.00 - K1846+812.00,Roads | Completed | Region IX | ₱106.6M |
| 17M00049 | 9 yrs 6 mo ago | ROAD WIDENING OF DIGOS-MAKAR ROAD, K1618+156.15 - K1618+400 (CHAINAGE 26557.15 - CHAINAGE 26801), K1618+903 - K1619+809.67 (CHAINAGE 27304 - CHAINAGE 28214.67), K1619+896.42 - K1623+290 (CHAINAGE 28301.42 - CHAINAGE 31697), K1623+420 - K1623+490.15 (CHAINRoads | Completed | Region XII | ₱160.1M |
| 17MB0002 | 9 yrs 7 mo ago | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT -4 (HDM-4) PRIMARY ROAD, DIGOS-MAKAR, K1645+000-K1646+589, GENERAL SANTOS CITYFlood Control/Hydraulics/Water Supply, Roads: Construction - PCCP, Traffic Engineering-Signalization | Completed | South Cotabato 1st DEO | ₱33.9M |
| 17MB0021 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES AT MAKAR BRIDGE - I ALONG MAKAR RIVER, STA. 0+000-STA. 0+518, GENERAL SANTOS CITY, SOUTH COTABATO 1ST LDFlood Control and Drainage | Completed | South Cotabato 1st DEO | ₱42.0M |
| 17H00004 | 9 yrs 7 mo ago | MFO 3- MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, P00130505VS MARIA-BASAC-LARENA ROAD LEADING TO LARENA RORO PORT, LARENA, SIQUIJOR LONE DISTRICTRoads | Completed | Region VII | ₱110.5M |
| 17M00022 | 9 yrs 7 mo ago | ROAD UPGRADING (UNPAVED TO PAVED) ALONG MAGPET-NOWA-DOROLOMAN-GREENFIELD ROAD, K1639+720 TO K1639+1046, (CHAINAGE 11336 TO CHAINAGE 11662), K0141+(-138) CHAINAGE 636-CHAINAGE 816), K1655+658 - K1658+084 ( CHAINAGE 14053- CHAINAGE 16479), K1665+123 - K1669Roads | Completed | Region XII | ₱138.5M |
| 17M00068 | 9 yrs 7 mo ago | ROAD OPENING OF SURALLAH-TBOLI-SAN JOSE (GEN. SANTOS CITY PACKAGE 1 STA. 3+620 - STA 5-240 BRGY. MAAN SECTION, SOUTH COATABATO.Roads | Completed | Region XII | ₱144.8M |
| 17M00069 | 9 yrs 7 mo ago | ROAD OPENING OF SURALLAH-TBOLI-SAN JOSE ROAD (GEN. SANTOS CITY PACKAGE 2, STA 5+240 - STA. 6+700, BRGY. TBOLI-BRGY. MAAN SECTION, SOUTH COTABATORoads | Completed | Region XII | ₱138.4M |
| 17M00070 | 9 yrs 7 mo ago | ROAD OPENING OF SURALLAH-T'BOLI-SAN JOSE ROAD (GEN. SANTOS CITY PACKAGE 3, STA 6+700-STA.7+600, BRGY. TBOLI-BRGY. MAAN SECTION, SOUTH COTABATO.Roads | Completed | Region XII | ₱144.7M |
| 17L00017 | 9 yrs 7 mo ago | WIDENING 2-4 INTO 6 LANES OF DAVAO-COT. RD (DAVAO CITY-JCT. DIGOS SECT.) INCL. REHAB./RECONST. OF DARoads | Completed | Region XI | ₱105.5M |
| 17H00011 | 9 yrs 7 mo ago | MF0 1-NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106539VS, SECONDARY ROADS, S0000ISJ , SIQUIJOR CIRCUMFERENTIAL ROAD.Roads | Completed | Region VII | ₱117.3M |
| 17L00045 | 9 yrs 7 mo ago | WIDENING (2 INTO 4 LANES) OF SURIGAO-DAVAO COASTAL RD BRGY. TAGNANAN-BRGY.CADUNAN, COMPOSTELA VALLEYRoads | Completed | Region XI | ₱126.7M |
| 17ME0011 | 9 yrs 8 mo ago | WIDENING OF BIANGAN BRIDGE ALONG DMR, MALUNGON, SARANGANI PROVINCEBridges | Completed | Sarangani DEO | ₱44.7M |
| 17MC0042 | 9 yrs 8 mo ago | CONSTRUCTION OF MALASILA RIVER PROTECTION DIKE, BULAKANON, MAKILALA SECTION, (STA. 2+900-STA. 3+827, STA. 3+276-STA. 3+392, MAKILALA, NORTH COTABATO - CONSTRUCTION OF DIKEFlood Control and Drainage | Completed | Cotabato 2nd DEO | ₱46.5M |
| 17MC0071 | 9 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL DIKE APPROACH OF KABACAN BRIDGE, (STA. 0+522-STA. 0+933.4), BRGY. POBLACION, PRESIDENT ROXAS SIDE, PRESIDENT ROXAS, NORTH COTABATO - CONSTRUCTION OF DIKEFlood Control and Drainage | Completed | Cotabato 2nd DEO | ₱49.0M |
| 17MC0078 | 9 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL DIKE ALONG BANTAC RIVER, BARANGAY BANTAC, (STA. 0+425 -STA. 1+628) MAGPET, NORTH COTABATO - CONSTRUCTION OF DIKEFlood Control and Drainage | Completed | Cotabato 2nd DEO | ₱45.6M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.