PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE.
Contractor 5875da4ca3b5dfaed438
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱6.82B · 152 contracts
Rank by recorded value
#508 of 23,487
More info
First record
Jan 25, 2016 (10 yrs 9 mo ago)
Latest record
Feb 13, 2026 (9 mos ago)
DPWH contractor code
15599
Where they work
Bukidnon₱2.72B
Zamboanga del Sur₱1.83B
Misamis Oriental₱1.67B
Surigao del Norte₱275.2M
Davao del Sur₱139.3M
Latest 25 from a total of 152 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 22K00370 | 4 yrs 3 mo ago | ROAD WIDENING-TERTIARY ROADS, JCT. SH AGLAYAN-ZAMBOANGUITA RD.K1520 + 988.549-K1521 + 284.490, K1521 + 325.000-K1522 + 504.000, K1522 + 890.00, K1522 +943.750, K1522+977.000 - K1523 +847.402, K1542 + 500-K1544 + 500Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Region X | ₱116.0M |
| 22K00371 | 4 yrs 3 mo ago | OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS, SAYRE HIGHWAY K1480 + 940.000 - K1482 + 048.776, K1482 + 911.490 - K1483 +661.420, K1512 + 000 - K1515 + 000Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Region X | ₱142.6M |
| 22NG0091 | 4 yrs 4 mo ago | CONSTRUCTION OF ROAD, BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTE / BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTEFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Surigao del Norte 2nd DEO | ₱77.2M |
| 22KA0088 | 4 yrs 4 mo ago | OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK)-K1528+000 - K1536+507, LANTAPAN, BUKIDNON, BANTUANON-BACLAYON, LANTAPAN, BUKIDNON 2ND LDRoads: Construction - PCCP, Roads: Maintenance | Completed | Bukidnon 1st DEO | ₱96.5M |
| 22NG0031 | 4 yrs 5 mo ago | CONSTRUCTION OF ROAD, SITIO PUYAWON - SITIO BUYA, BARANGAY CAMAM-ONAN, GIGAQUIT, SURIGAO DEL NORTE/BARANGAY CAMAM-ONAN, GIGAQUIT, SURIGAO DEL NORTERoads | Completed | Surigao del Norte 2nd DEO | ₱77.2M |
| 22NG0081 | 4 yrs 5 mo ago | CONSTRUCTION OF ROAD IN BARANGAY FERLDA - SITIO PUYAWON, BRGY. CAMAM-ONAN, GIGAQUIT, SURIGAO DEL NORTE/BRGY. CAMAM-ONAN, GIGAQUIT, SURIGAO DEL NORTERoads | Completed | Surigao del Norte 2nd DEO | ₱77.2M |
| 22K00028 | 4 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER, KALILANGAN, BUKIDNON, PACKAGE 4 (STA.1+380.00-STA.1+830.00)Flood Control and Drainage | Completed | Region X | ₱77.2M |
| 22K00030 | 4 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER, PACKAGE 6, KALILANGAN, BUKIDNON (STA.2+355.956-STA.2+660.0)Flood Control and Drainage | Completed | Region X | ₱67.6M |
| 22JG0044 | 4 yrs 7 mo ago | ROAD WIDENING ALONG JCT. DUMALINAO - MARGOSATUBIG RD - K1686+130 - K1686+1738, GUIPOS, ZAMBOANGA DEL SURRoads | Completed | Zamboanga del Sur 2nd DEO | ₱30.4M |
| 22JG0043 | 4 yrs 7 mo ago | ROAD WIDENING ALONG PAGADIAN CITY - ZAMBOANGA CITY RD - K1716+350 - K1718+000, DIPLO, KUMALARANG, ZAMBOANGA DEL SURRoads | Completed | Zamboanga del Sur 2nd DEO | ₱44.6M |
| 22JG0048 | 4 yrs 7 mo ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG NRJ BOGAYO-KITAAN DAGAT-SUMINALOM RD, KUMALARANG, ZAMBOANGA DEL SURRoads | On-Going | Zamboanga del Sur 2nd DEO | ₱30.4M |
| 22J00126 | 4 yrs 7 mo ago | PREVENTIVE MAINTENANCE - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROADRoads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Rehabilitation - PCCP | On-Going | Region IX | ₱98.6M |
| 22KC0029 | 4 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALILANGAN LAMPANUSAN ROAD (UPSTREAM & DOWNSTREAM) OF MALATIPAY BRIDGE WITH SLOPE PROTECTION STA. 0+000.00-STA. 0+400.00, KALILANGAN, BUKIDNONFlood Control and Drainage | Completed | Bukidnon 3rd DEO | ₱49.0M |
| 22KL0038 | 4 yrs 8 mo ago | ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE. AND LANDSLIDE - SECONDARY ROAD GINGOOG CITY - CLAVERIA - VILLANUEVA RD - K1347 + 589.5 - K1347+700.00Roads | Completed | Misamis Oriental 2nd DEO | ₱49.0M |
| 22JG0014 | 4 yrs 8 mo ago | PAVING OF UNPAVED ROADS - TERTIARY ROADS ALONG ZAMBOANGA DEL SUR COASTAL RD - (S01186MN), V. SAGUN, ZAMBOANGA DEL SURRoads | Completed | Zamboanga del Sur 2nd DEO | ₱58.6M |
| 22KC0027 | 4 yrs 8 mo ago | CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING BARANGAY GANDINGAN, PANGANTUCAN, BUKIDNONBuildings and Facilities | Completed | Bukidnon 3rd DEO | ₱2.5M |
| 22KC0032 | 4 yrs 8 mo ago | CONSTRUCTION OF PONGOL BARANGAY ROAD, BARANGAY PONGOL, LIBONA, BUKIDNONRoads | Completed | Bukidnon 3rd DEO | ₱5.0M |
| 22KL0042 | 4 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LUGAIT RIVER (PACKAGE 1) LUGAIT, MISAMIS ORIENTALFlood Control and Drainage | Completed | Misamis Oriental 2nd DEO | ₱67.5M |
| 22JG0013 | 4 yrs 8 mo ago | ROAD WIDENING - PRIMARY ROADS ALONG PAGADIAN CITY - ZAMBOANGA CITY RD - K1708+660 - K1710+000, KUMALARANG, ZAMBOANGA DEL SURRoads | Completed | Zamboanga del Sur 2nd DEO | ₱31.0M |
| 22KB0072 | 4 yrs 8 mo ago | CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF RAWARI BRIDGE (B01384MN) ALONG BUKIDNON-DAVAO CITY ROAD, RAWARI BRIDGE, SITIO RAWARI, KITAOTAO, BUKIDNONFlood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Bukidnon 2nd DEO | ₱67.5M |
| 22KB0073 | 4 yrs 8 mo ago | CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF SAN MIGUEL BRIDGE (B01432MN) ALONG MARAMAG-MARADUGAO ROAD, SAN MIGUEL BRIDGE, SAN MIGUEL, MARAMAG, BUKIDNONFlood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Bukidnon 2nd DEO | ₱67.5M |
| 22J00039 | 4 yrs 8 mo ago | NETWORK DEVELOPMENT PROGRAM ROAD WIDENING - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROADRoads | Completed | Region IX | ₱69.9M |
| 21KA0117 | 4 yrs 8 mo ago | CONCRETING OF SITIO MABUHAY ROAD, BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNONBRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LDRoads | Completed | Bukidnon 1st DEO | ₱49.0M |
| 22KB0083 | 4 yrs 8 mo ago | CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MANUTO BRIDGE (B01380MN) ALONG BUKIDNON-DAVAO CITY ROAD, MANUTO BRIDGE, BRGY SALAWAGAN, QUEZON, BUKIDNONFlood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Bukidnon 2nd DEO | ₱67.5M |
| 22KB0086 | 4 yrs 8 mo ago | CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF APOLANG BRIDGE (B01389MN) ALONG KIBAWE-KADINGILAN-KALILANGAN ROAD, APOLANG BRIDGE, BRGY WEST KIBAWE, KIBAWE, BUKIDNONFlood Control: Construction - Bank Protection Structure, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Bukidnon 2nd DEO | ₱57.9M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.