GOLDRICH CONSTRUCTION AND TRADING
Contractor 75d7005ed1efae90ec8a
Overview
PhilGEPS awards
₱8.05B · 206 awards
DPWH contracts
₱7.32B · 139 contracts
Rank by recorded value
#206 of 23,487
More info
First record
Mar 23, 2010 (16 yrs 7 mo ago)
Latest record
Jul 20, 2026 (3 mos ago)
DPWH contractor code
16489
Where they work
Latest 25 from a total of 139 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 22PD0062 | 4 yrs 6 mo ago | CONTRACT PACKAGE 7: SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER RA 11239: A. KISAD RD. K0249+(-759)-K0249+377 B. LEONARD WOOD RD. (S00411LZ)-K0250+(-711)-K0250+575, K0250+627-K0251+416 C.LEONARD WOOD RD. (S00412LZ) - K0252+(-525)-K0252+(-1Roads | Completed | Baguio City DEO | ₱66.5M |
| 21PD0031 | 4 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG LAKE DRIVE 1 TO JUAN LUNA DRIVE, STA. 0+000-STA. 0+335 (LS), BAGUIO CITYFlood Control and Drainage | Completed | Baguio City DEO | ₱51.7M |
| 22PD0022 | 4 yrs 7 mo ago | CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM-CONSTRUCTION OF PMA RAINWATER HARVESTING FACILITIES, PHILIPPINE MILITARY ACADEMY, FORT DEL PILAR, BAGUIO CITYWater Provision and Storage | Completed | Baguio City DEO | ₱72.4M |
| 22PD0018 | 4 yrs 7 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITY/DRAINAGE SYSTEM ALONG BUED RIVER (TRIBUTARIES) A: STA. 0+190-STA. 0+640Flood Control and Drainage | Completed | Baguio City DEO | ₱49.0M |
| 22PD0015 | 4 yrs 7 mo ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROAD-MAJOR MANE TO KENNON ROAD BYPASS ROAD, BAGUIO CITYRoads | Completed | Baguio City DEO | ₱44.1M |
| 22AH0017 | 4 yrs 7 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION ALONG AGNO RIVER BASIN,STA.0+000-STA.0+505.12,BRGY.SAN JOSE,AGUFlood Control and Drainage | Completed | Pangasinan 2nd DEO | ₱44.1M |
| 22PD0019 | 4 yrs 7 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION FACILITY/DRAINAGE SYSTEM ALONG BUED RIVER (TRIBUTARIES), STA. 0+030-STA.0+53Flood Control and Drainage | Completed | Baguio City DEO | ₱49.0M |
| 22PD0017 | 4 yrs 8 mo ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-QUIRINO H-WAY (BAGUIO-BAUANG ROAD) TO QUEZON HILL ROAD 1 BY-PASS ROAD, BAGUIO CITYRoads | Completed | Baguio City DEO | ₱39.2M |
| 22PD0024 | 4 yrs 8 mo ago | CONTRACT PACKAGE 5: CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) A. CONST. OF CONCRETE ROAD FROM TMC TO TOWER 66 AREA, PMA B. CONST. OF PMA ROADRoads | Completed | Baguio City DEO | ₱49.0M |
| 22PD0001 | 4 yrs 9 mo ago | CONTRACT PACKAGE 3: PREVENTIVE MAINTENANCE; A. PRIMARY ROADS-HARRISON RD. NO. 1 (S04713LZ) CHAINAGE 0-CHAINAGE 22, CHAINAGE 212-CHAINAGE 414, CHAINAGE 22-CHAINAGE 212, CHAINAGE 414-CHAINAGE 807 (S04714LZ) CHAINAGE0-CHAINAGE 414 B. SECONDARY ROADS-LOAKAN RRoads | Completed | Baguio City DEO | ₱89.3M |
| 22PD0002 | 4 yrs 9 mo ago | CONTRACT PACKAGE 2: PREVENTIVE MAINTENANCE-TERTIARY ROADS: A. ABANAO EXT. -(S00429LZ) CHAINAGE 0-CHAINAGE 29, CHAINAGE156-CHAINAGE275, (S0505LZ) CHAINAGE 111-CHAINAGE 232 B.CHUNTUG #1-(S00427LZ) CHAINAGE 0-CHIANAGE218 C. GOVT CTR.CUT OFF RD K0249+(-011)-Roads | Completed | Baguio City DEO | ₱72.6M |
| 22PD0004 | 4 yrs 9 mo ago | CONTRACT PACKAGE 1: REHAB/RECONST OF ROADS W/ SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS: A. ASIN RD. K0308+917-K0308+940; K0309+465-K0309+525 B. PMA CUT-OFF RD. 1 K0252+(-556)-K0252+(-492)Roads | Completed | Baguio City DEO | ₱43.4M |
| 22PD0020 | 4 yrs 9 mo ago | CONSTRUCTION OF FLOOD MITIGATION FACILITY/DRAINAGE SYSTEM ALONG KISAD ROAD TO LAKE DRIVE 1 TO ABAD SANTOS DRIVE, STA. 0+000-STA. 0+463, BAGUIO CIYFlood Control and Drainage | Completed | Baguio City DEO | ₱49.0M |
| 21P00075 | 4 yrs 10 mo ago | LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-NATIONAL ROADS AND BRIDGES-NATIONAL ROADS-ASPHALT OVERLAY ALONG MARCOS HIGHWAY (S00395LZ),KO270+500 - KO273+218, KO277+402 - KO279+149 TUBA, BERoads | Completed | Cordillera Administrative Region | ₱96.5M |
| 21P00076 | 4 yrs 10 mo ago | LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - ASPHALT OVERLAY ALONG PICO - LAMTANG ROAD (S00401LZ)KO255+(-555) - KO260+750LA TRIRoads | Completed | Cordillera Administrative Region | ₱96.5M |
| 21PC0074 | 5 yrs 1 mo ago | NATIONAL BUILDING PROGRAM - MULTI-PURPOSE/FACILITIES - STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS & CONSTRUCTION OF EVACUATION CENTER/QUARANTINE FACILITIES-CAR RELEASE FUNDS FOR THE CONSTRUCTION OF EVACUATION CENTER, POBLACION, CALANASAN, APAYAOBuildings and Facilities | Completed | Apayao 2nd DEO | ₱35.7M |
| 21PD0003 | 5 yrs 4 mo ago | CONTRACT PACKAGE 3: A) REH/RECONST OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIED-PRIMARY ROADS GOV. PACK RD. - (S00408LZ) CHAINAGE 0-CHAINAGE 36, (S00521LZ) CHAINAGE 0-CHAINAGE 100, (S04724LZ) CHAINAGE 0-CHAINAGE 200 B) ROAD WIDENING-PRIMARY ROADS-GORoads | Completed | Baguio City DEO | ₱54.8M |
| 21PD0009 | 5 yrs 4 mo ago | ROAD WIDENING-SECONDARY ROADS-MARCOS HI-WAY K0280+445-K0281+695Roads | Completed | Baguio City DEO | ₱69.0M |
| 20PC0068 | 5 yrs 5 mo ago | LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 1, LUNA, APAYAOBuildings and Facilities | Completed | Apayao 2nd DEO | ₱15.9M |
| 20PC0069 | 5 yrs 5 mo ago | LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, APAYAO SPORTS COMPLEX, LUNA, APAYAOBuildings and Facilities | Completed | Apayao 2nd DEO | ₱20.5M |
| 21PD0074 | 5 yrs 6 mo ago | CONSTRUCTION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS): CONSTRUCTION OF PMA ACCESS ROAD FROM GLOBE TOWER TO SAO AREA, PHILIPPINE MILITARY ACADEMY, FORTRoads | Completed | Baguio City DEO | ₱72.4M |
| 21PC0058 | 5 yrs 7 mo ago | ORG. OUTC. 1: ENS. SAFE AND RELI. NAT'L. RD. SYST. ASSET PRES.PROG.-REHAB./RECONST. OF ROADS W/ SLIPS, SLOPES COL., AND LANDS.-TER. RDS CLAV.-CAL.-KAB. RD K0623+023-K0623+078,K0628+504-K0629+106,K0630+190-K0630+315,K0638+321-K0638+367,K0663+301-K0663+352Roads | Completed | Apayao 2nd DEO | ₱47.1M |
| 21PD0012 | 5 yrs 7 mo ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-MAJOR MANE TO KENNON ROAD BYPASS ROAD, BAGUIO CITYRoads | Completed | Baguio City DEO | ₱39.2M |
| 21PD0014 | 5 yrs 7 mo ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-QUIRINO H-WAY (BAGUIO-BAUANG ROAD) TO QUEZON HILL ROAD 1 BY-PASS ROADRoads | Completed | Baguio City DEO | ₱44.1M |
| 21PC0028 | 5 yrs 8 mo ago | CONS./IMPR. OF ACCESS ROADS LEADING TO DECLARED TOURISM DEST.-SAN ISIDRO SUR-POBLACION-LAPPA-MARAG-CADACLAN-SALAGUNTING TOURISM ROAD LEADING TO MANACOTA UNDERGROUND RIVER AND OTHER TOURISM AREAS, BRGY. CADACLAN, CALANASAN, (BAYAG), APAYAO, PACKAGE IIRoads | Completed | Apayao 2nd DEO | ₱96.5M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.