GOLDRICH CONSTRUCTION AND TRADING
Contractor 75d7005ed1efae90ec8a
Overview
PhilGEPS awards
₱8.05B · 206 awards
DPWH contracts
₱7.32B · 139 contracts
Rank by recorded value
#206 of 23,487
More info
First record
Mar 23, 2010 (16 yrs 7 mo ago)
Latest record
Jul 20, 2026 (3 mos ago)
DPWH contractor code
16489
Where they work
Latest 25 from a total of 139 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 20PC0034 | 6 yrs ago | IMPROVEMENT OF POBLACION-LANGNAO ROAD, CALANASAN, APAYAORoads | Completed | Apayao 2nd DEO | ₱9.6M |
| 20P00019 | 6 yrs ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUELRoads | Completed | Cordillera Administrative Region | ₱133.0M |
| 20PD0014 | 6 yrs ago | CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MAJOR MANE AND KENNON ROAD BYPASS ROAD, BAGUIO CITYRoads | Completed | Baguio City DEO | ₱19.6M |
| 20AH0034 | 6 yrs 1 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. MAGTAKING BUGALLON, PANGASINANFlood Control and Drainage | Completed | Pangasinan 2nd DEO | ₱32.6M |
| 20AH0035 | 6 yrs 1 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION AT BRGY. PORTIC, BUGALLON, PANGASINANFlood Control and Drainage | Completed | Pangasinan 2nd DEO | ₱23.3M |
| 20PC0061 | 6 yrs 2 mo ago | CONSTRUCTION OF EVACUATION CENTER,SAN CARLOS, STA MARCELA,APAYAOBuildings and Facilities | Completed | Apayao 2nd DEO | ₱34.3M |
| 20PD0121 | 6 yrs 4 mo ago | CONTRACT PACKAGE 5: PREVENTIVE MAINTENANCE: A) LOAKAN RD. K0246+000-K0246+308 B) MANUEL ROXAS RD. 252+(-131)-K0252+499 C) LEONARD WOOD RD. - K0250+(-767)-K0250+(-717)Roads | Completed | Baguio City DEO | ₱16.1M |
| 20PD0119 | 6 yrs 4 mo ago | CONTRACT PACKAGE 4: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: A. KENNON RD. K0241+790-K0241+825, K0242+430-K0242+480, K0242+600-K0242+720, K0244+015-K0244+050, K0244+350 B. MAJOR MANE RD. K0247+865-K0247+895Roads | Completed | Baguio City DEO | ₱78.7M |
| 20PE0001 | 6 yrs 5 mo ago | CLUSTERED PREVENTIVE MAINTENANCE OF ROAD ALONG BAGUIO-BONTOC ROAD AND MARCOS HIGHWAY, K0253+400 - K0255+061 LA TRINIDAD AND K0273+951 - K0276+885 TUBA, BENGUETRoads | Completed | Benguet 1st DEO | ₱89.4M |
| 20PD0109 | 6 yrs 5 mo ago | REHABILITATION OF DAMAGED REVETMENT WALL ALONG BUED RIVER NEAR LION'S HEAD, CAMP 7, BAGUIO CITY, STA. 0+000-STA. 0+291 (CATEGORIZED AS PRIORITY I), WHICH WAS DAMAGED BY TYPHOON 'OMPONG'GAA 2019 CSSP | Completed | Baguio City DEO | ₱38.1M |
| 20A00042 | 6 yrs 8 mo ago | CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - LINGAYEN BAYWALK TO BINMALEY, PANGASINANRoads | Completed | Region I | ₱53.8M |
| 20CL0005 | 6 yrs 8 mo ago | CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL PROJECT AT BAYTO RIVER (UPSTREAM), STA. CRUZ, ZAMBALESFlood Control and Drainage | Completed | Zambales 1st DEO | ₱32.2M |
| 20AH0038 | 6 yrs 9 mo ago | REHAB.OF RIVERBANK PROTECTION AT BRGY. POLONG(UPSTREAM)BUGALLON, PANGASINANFlood Control and Drainage | Completed | Pangasinan 2nd DEO | ₱23.6M |
| 20AH0041 | 6 yrs 9 mo ago | AGNO RIVER BASIN F/C PROJ.-CONST'N.OF RIVERBANK PROTECTION ALONG BRGY.BANAGA,BUGALLON,PANGASINANFlood Control and Drainage | Completed | Pangasinan 2nd DEO | ₱36.3M |
| 20AH0042 | 6 yrs 9 mo ago | AGNO RIVER BASIN F/C PROJ-.CONST'N.OF RIVERBANK PROTECTION ALONG BRGY. SALASA, BUGALLON,PANGASINANFlood Control and Drainage | Completed | Pangasinan 2nd DEO | ₱28.4M |
| 20AH0044 | 6 yrs 9 mo ago | AGNO RIVER BASIN FLOOD CONTROL PROJ.-CONST'N. OF RIVERBANK PROTECTION ALONG PANACOL, AGUILAR, PANGASFlood Control and Drainage | Completed | Pangasinan 2nd DEO | ₱23.3M |
| 20PD0018 | 6 yrs 9 mo ago | CONTRACT PACKAGE 2: A) CONST/REH OF FLOOD MIT. FACILITIES W/IN MAJ. RIVER BASINS AND PRINCIPAL RIVERS-CONST. OF FLOOD MIT. FACILITIES ALONG BALILI RIVER(MAIN), BAGUIO CITY B) CONST./MAINT OF FLOOD MITIGATION STRUCT. AND DRAINAGE SYSTEM-BALILI RIVER (TRIB)Flood Control and Drainage | Completed | Baguio City DEO | ₱42.2M |
| 19P00015 | 7 yrs 1 mo ago | LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATIONIMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - WATER MANAGEMENT FACILITIES - WATER SUPPLY - CONSTRUCTION OF RAIN HARVESTING FACILITY - BUSOL WATERSHED, AMBIONG, BAGUIO CITYWater Provision and Storage | Completed | Cordillera Administrative Region | ₱28.9M |
| 19P00031 | 7 yrs 1 mo ago | CONSTRUCTION OF EVACUATION CENTER, CUBET, MALAMA, CONNER, APAYAOBuildings and Facilities | Completed | Cordillera Administrative Region | ₱34.7M |
| 19PE0026 | 7 yrs 2 mo ago | CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF GRAVEL ROAD - SPECIFIC LOCATIONS ALONG BAGUIO-LA TRINIDADITOGON-SABLAN-TUBA & TUBLAY (BLISTT), KAMOG JCT.-CALOT-PAPPA-BAGONG-BALLUAY-TUEL JCT. (SECTION 2 OF BLISTT OUTER RING CIRCUMFERENTIAL RRoads | Completed | Benguet 1st DEO | ₱95.1M |
| 19PD0121 | 7 yrs 3 mo ago | PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG F. CALDERON ST. (S00428LZ) CHAINAGE 0 TO CHAINAGE 92Roads | Completed | Baguio City DEO | ₱1.1M |
| 19A00048 | 7 yrs 3 mo ago | CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION-PUGUIL-TUBADAY ROAD CONNECTING BALAOAN-SANTOL ROAD IN SUPPORT TO SOFT BROOM INDUSTRY AND OTHER HIGH VALUE AGRICULTURAL PRODUCTS, SANTOL, LA UNIONRoads | Completed | Region I | ₱14.5M |
| 19PD0002 | 7 yrs 4 mo ago | RECONSTRUCTION OF CONCRETE PAVEMENT AND PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING-ON SPECIFIC LOCATIONS ALONG MARCOS HIGHWAY (S00432LZ) KO 280+(-814) TO KO 281+701Roads | Completed | Baguio City DEO | ₱7.4M |
| 19PD0001 | 7 yrs 4 mo ago | CONT. PACKAGE 2: PREV. MAINT. OF RD.: ASPH OVERLAY ALONG A) QUEZON HILL RD #1 B) MILITARY CUT-OFF RD (S00440LZ) C) PMA RD (S00467LZ) D) RIMANDO-AMBIONG RD. (S00519LZ) E) ENGR'S HILL F) MAGSAYSAY G) LOAKAN RDRoads | Completed | Baguio City DEO | ₱35.1M |
| 19PD0008 | 7 yrs 4 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES/DRAINAGE SYSTEM ALONG BALILI RIVER (TRIBUTARIES), BAGUIO CITYFlood Control and Drainage | Completed | Baguio City DEO | ₱44.1M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.