NORTHERN BUILDERS
Contractor 7903635cda05ff9f3d74
Overview
PhilGEPS awards
₱47.65B · 631 awards
DPWH contracts
₱30.18B · 373 contracts
Rank by recorded value
#16 of 23,487
More info
First record
Sep 3, 2008 (18 yrs 2 mo ago)
Latest record
Oct 3, 2025 (1 yr 1 mo ago)
DPWH contractor code
8789
Where they work
Latest 25 from a total of 373 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 17CH0040 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS FLOOD CONTROL PROJECT IFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱35.1M |
| 17OH0013 | 9 yrs 8 mo ago | PROPOSED REPAIR/RESTORATION OF SEAWALL AT THE BACK OF CCP COMPLEX AND DIOKNO BLVD. (PHASE V), STA 0+Flood Control and Drainage | Completed | South Manila DEO | ₱48.4M |
| 17OH0014 | 9 yrs 8 mo ago | PROPOSED REPAIR/RESTORATION OF SEAWALL AT THE BACK OF CCP COMPLEX AND DIOKNO BLVD. (PHASE VI),STA. 0Flood Control and Drainage | Completed | South Manila DEO | ₱19.3M |
| 17OH0015 | 9 yrs 8 mo ago | PROPOSED REPAIR/RESTORATION OF SEAWALL AT THE BACK OF CCP COMPLEX AND DIOKNO BLVD. (PHASE IV), STA 0Flood Control and Drainage | Completed | South Manila DEO | ₱48.3M |
| 16AD0179 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUDOC EAST, TAGUDIN, ILOCOS SURFlood Control and Drainage | Completed | Ilocos Sur 2nd DEO | ₱4.6M |
| 16CK0180 | 9 yrs 8 mo ago | ASSETS PRESERV OF NATL RD, REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL RD INCL. DRAINAGE BASED ONRoads | Completed | Tarlac 2nd DEO | ₱14.6M |
| 17OB0005 | 9 yrs 8 mo ago | COMPLETION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL LEADING TO TAGUIG PUMPING STATION, TAGUIG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱10.5M |
| 17CJ0006 | 9 yrs 9 mo ago | CONST/MAINT OF FMSDS; CONST OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, STA CRUZ SECTION (PHASEFlood Control and Drainage | Completed | Tarlac DEO | ₱42.5M |
| 17CJ0007 | 9 yrs 9 mo ago | CONST/MAINT OF FMSDS; CONST OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, STA CRUZ SECTION (PHASEFlood Control and Drainage | Completed | Tarlac DEO | ₱32.4M |
| 17CJ0023 | 9 yrs 9 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER CONTROL, LIBUEG SECTION, CAMILING, TARLAC 1ST LDFlood Control and Drainage | Completed | Tarlac DEO | ₱28.5M |
| 17CJ0027 | 9 yrs 9 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF SLOPE PROTECTION ALONG CAMILING RIVER CONTROL, SURGUI 2ND SECTION, CAMILING, TARLAC 1ST LDFlood Control and Drainage | Completed | Tarlac DEO | ₱37.8M |
| 17CJ0030 | 9 yrs 9 mo ago | NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; VICTORIA - PURA RD, KO152+481 - KO153+611Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP | Completed | Tarlac DEO | ₱20.5M |
| 16CJ0154 | 9 yrs 9 mo ago | NETWORK DEVELOPMENT- CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCL. ROW; CAPAS-BOTOLAN RD (TARLAC SECTION), TARLAC 2ND LDRoads | Completed | Region III | ₱93.6M |
| 16CJ0155 | 9 yrs 9 mo ago | REPAIR/REHABILITATION OF LTO IMPOUNDING AREA AT BRGY. SAN ISIDRO, TARLAC CITYBuildings and Facilities | Completed | Tarlac DEO | ₱14.9M |
| 17BJ0003 | 9 yrs 9 mo ago | NETWORK DEVELOPMENT-IMPROVEMENT/ WIDENING OF NATIONAL ROADS-SECONDARY, NUEVA VIZCAYA-BENGUET ROAD, K0236+358-K0236+829, K0236+898-K0238+000, ARITAO, NUEVA VIZCAYARoads | Completed | Nueva Vizcaya 2nd DEO | ₱46.1M |
| 16CM0054 | 9 yrs 10 mo ago | FLOOD CONTROL WORKS IN STA. RITA, KALAKLAN RIVER OLONGAPO CITYFlood Control and Drainage | Completed | Region III | ₱139.8M |
| 16CJ0151 | 9 yrs 10 mo ago | CONSTRUCTION OF 3 UNITS, 4 STOREY, 12 CLASSROOM SB, TARLAC NATIONAL HIGH SCHOOL, TARLAC CITYBuildings and Facilities | Completed | Tarlac DEO | ₱65.2M |
| 16P00068 | 10 yrs ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REPAIR OF FOLLOWING SWIP IN APAYAO - ABULOG RIVER BASIN (BARO-A LUBONG, FLORA; ZUMIGE, LUNA; BACUT, STA MARCELA), FLORA, LUNA, STA. MARCELA, APAYAOFlood Control and Drainage | Completed | Cordillera Administrative Region | ₱78.0M |
| 16PD0035 | 10 yrs ago | CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF-BATCH 9) CONSTRUCTION OF 4 STOREY 24 CLASSROOMS GUISAD VALLEY NHSBuildings and Facilities | Completed | Baguio City DEO | ₱35.6M |
| 16C00053 | 10 yrs 1 mo ago | CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS, LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS, CONST. OF A NEW CLARK-BAMBAN-CAPAS ACCESS ROAD LEADING TO CLARK CITY, TARLAC, TARLAC 3RD L.D. PROV. OF TARLACRoads | Completed | Region III | ₱144.1M |
| 16C00034 | 10 yrs 1 mo ago | FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJAFlood Control and Drainage | Completed | Flood Control Management Cluster | ₱284.2M |
| 16CG0115 | 10 yrs 2 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-ARAYAT-APALIT SETBACK LEVEE (ASPHALT), PAMPANGAFlood Control and Drainage | Completed | Region III | ₱95.1M |
| 16OB0230 | 10 yrs 2 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL BRGY. WAWA, BRGY. SAN MIGUEL AND BRGY. HAGUNOY TAGUIG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱42.8M |
| 16OB0231 | 10 yrs 2 mo ago | CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL BRGY. CALZADA AND BRGY. STA. ANA, TAGUIG CITYFlood Control and Drainage | Completed | Metro Manila 1st DEO | ₱42.8M |
| 16AD0091 | 10 yrs 2 mo ago | PACKAGE I:1.CONCRETING OF DEL PILAR FMR, BRGY. DEL PILAR, TAGUDIN, ILOCOS SUR2.CONCRETING OF JARDIN FMR,BRGY. JARDIN, TAGUDIN, ILOCOS SUR3.CONCRETING OF PULA FMR, BRGY. PULA, TAGUDIN, ILOCOS SUR4.CONCRETING OF LAS-UD FMRRoads | Completed | Ilocos Sur 2nd DEO | ₱7.6M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.