L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CONSTRUCTION)
Contractor 8389a5e308df89c726ca
Overview
PhilGEPS awards
₱497.0M · 32 awards
DPWH contracts
₱3.71B · 167 contracts
Rank by recorded value
#781 of 23,487
More info
First record
Jan 13, 2016 (10 yrs 10 mo ago)
Latest record
Apr 24, 2025 (1 yr 6 mo ago)
DPWH contractor code
5719
Where they work
Latest 25 from a total of 167 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 18CK0007 | 8 yrs 9 mo ago | BRIDGE-RETROFFITING/STRENGTHENING OF PERMANENT BRIDGES: SANTIAGO BRIDGE ALONG CONCEPCION-CAPAS RD,Bridges | Completed | Tarlac 2nd DEO | ₱35.1M |
| 18CK0008 | 8 yrs 9 mo ago | BRIDGE-RETROFITTING/STRENGTHENING OF PER. BRIDGES: RIO CHICO BRIDGE ALONG TARLAC-STA. ROSA RD. LAPAZBridges | Completed | Tarlac 2nd DEO | ₱42.4M |
| 18CK0009 | 8 yrs 9 mo ago | BRIDGE-RETROFITTING/STRENGTHENING OF PERM. BRIDGES: PALUBLUB BRIDGE ALONG CAPAS-SAN JOSE-MAYANTOC-MABridges | Completed | Tarlac 2nd DEO | ₱50.4M |
| 18CK0045 | 8 yrs 9 mo ago | REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (RIGHT BANK), LAPAZ, TARLACFlood Control and Drainage | Completed | Tarlac 2nd DEO | ₱23.9M |
| 18CK0058 | 8 yrs 9 mo ago | ASSET PRESERVATION OF NATIONAL ROAD, PREVENTIVE MAINTENANCE ALONG CONCEPCION-CAPAS ROAD, CONCEPCION & CAPAS, TARLACRoads | Completed | Tarlac 2nd DEO | ₱11.3M |
| 17CE0300 | 8 yrs 9 mo ago | CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE AND BOX CULVERT, BRGY. CONCEPCION, STO. DOMINGO, NUEVA ECIJAFlood Control and Drainage | Completed | Nueva Ecija 1st DEO | ₱19.1M |
| 17OI0142 | 8 yrs 9 mo ago | CONST. OF FOUR (4) STOREY, TWENTY (20) CLASSROOMS S/B, MUNTINLUPA H/S (BLDG-2), MUNTINLUPA CITYBuildings and Facilities | Completed | Las Piñas-Muntinlupa DEO | ₱42.9M |
| 17CJ0180 | 8 yrs 10 mo ago | COMPLETION OF SCHOOL BUILDING, 4 STOREY 16 CLASSROOM, VICTORIA NHS, VICTORIA, TARLACBuildings and Facilities | Completed | Tarlac DEO | ₱13.8M |
| 17OI0052 | 8 yrs 10 mo ago | CONST. OF FOUR (4) STOREY EIGHT (8) CLASSROOMS S/B AT ZAPOTE E/S, LAS PINAS CITYBuildings and Facilities | Completed | Las Piñas-Muntinlupa DEO | ₱20.4M |
| 17OI0124 | 8 yrs 10 mo ago | CONST. OF FOUR (4) STOREY, TWELVE (12) CLASSROOMS S/B AT LAS PINAS CENTRAL E/S, LAS PINAS CITYBuildings and Facilities | Completed | Las Piñas-Muntinlupa DEO | ₱31.6M |
| 17OI0126 | 8 yrs 10 mo ago | CONST. OF FOUR (4) STOREY, TWENTY (20) CLASSROOM S/B AT LAS PINAS EAST NATIONAL H/S, LAS PINAS CITYBuildings and Facilities | Completed | Las Piñas-Muntinlupa DEO | ₱41.6M |
| 17OF0122 | 9 yrs 1 mo ago | ROAD IMPROVEMENT OF FAIRLANE STREET, QUEZON CITYFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - PCCP | Completed | Quezon City 1st DEO | ₱18.3M |
| 17OI0072 | 9 yrs 3 mo ago | CONST. OF SLOPE PROTECTION & OTHER IMPROVEMENT OF SAN JOSE CREEK (SLEX GOING UPSTREAM), MUNTINLUPA CFlood Control and Drainage | Completed | Las Piñas-Muntinlupa DEO | ₱27.0M |
| 17CN0104 | 9 yrs 3 mo ago | REHABILITATION OF VARIOUS INFRASTRUCTURES FOR ASCOT ZABALI CAMPUS, BRGY. ZABALI, BALER, AURORABuildings and Facilities | Completed | Aurora DEO | ₱27.0M |
| 17OG0045 | 9 yrs 4 mo ago | ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/ MAJOR REPAIR OF DRAINAGE STRUCTURE ALONG ROAD - CAMP AGINALDO RD. NETWORK - (S05542LZ) CHAINAGE 0 - CHAINAGE 642, (S05544LZ) CHAINAGE 0 - CHAINAGE 206, QUEZON CITYRoads | Completed | Quezon City 2nd DEO | ₱17.8M |
| 17OG0052 | 9 yrs 4 mo ago | ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-CAMP AGUINALDO RD NETWORK-(S05538LZ) CHAINAGE 0-CHAINAGE 410, (S05539LZ) CHAINAGE 0- CHAINAGE2000, (SO5547LZ) CHAINAGE 0-CHAINAGE 1028,(S05549LZ) CHAINAGE0-CHAINAGE 568..Roads | Completed | Quezon City 2nd DEO | ₱23.2M |
| 16CE0223 | 9 yrs 4 mo ago | IMPROVEMENT/REHABILITATION OF REVETMENT, DIGDIG RIVER, PIUT, CARRANGLAN, NUEVA ECIJAFlood Control and Drainage | Completed | Nueva Ecija 1st DEO | ₱11.0M |
| 16CE0233 | 9 yrs 4 mo ago | CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-SECONDARY, PALESTINA BR. (B03400LZ) ALONG SAN JOSE CITY - RIZAL RD. VIA PINILI-PORAIS-VILLA JOSON-STA. MONICA-PORTAL RD.Bridges | Completed | Nueva Ecija 1st DEO | ₱2.8M |
| 17OI0045 | 9 yrs 5 mo ago | RAISING OF ALABANG-MUNTINLUPA ROAD INCLUDING DRAINAGE, BRGY. PUTATAN, MUNTINLUPA CITYFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Las Piñas-Muntinlupa DEO | ₱36.6M |
| 17OG0027 | 9 yrs 7 mo ago | REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED..Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Rehabilitation - Asphalt | Completed | Quezon City 2nd DEO | ₱38.8M |
| 16CK0216 | 9 yrs 7 mo ago | REPAIR/REHABILITATION OF BREACHED EARTH DIKE ALONG LUCUNG RIVER (MAGAO SECTION), CONCEPCION, TARLACFlood Control and Drainage | Completed | Tarlac 2nd DEO | ₱17.9M |
| 16CK0217 | 9 yrs 7 mo ago | EMERGENCY RESTORATION OF ERODED EMBANKMENT OF EXISTING DIKE ALONG MAET CREEK, R/B (SAN ISIDRO SECT),Flood Control and Drainage | Completed | Tarlac 2nd DEO | ₱13.6M |
| 16CK0213 | 9 yrs 7 mo ago | CONSTRUCTION OF BANTOG SMALL IMPOUNDING PROJECT (SWIP), LAPAZ, TARLACWater Provision and Storage | Completed | Tarlac 2nd DEO | ₱18.3M |
| 17CK0017 | 9 yrs 7 mo ago | CONSTRUCTION OF MACALONG SMALL IMPOUNDING PROJECT (SWIP), LAPAZ, TARLACWater Provision and Storage | Completed | Tarlac 2nd DEO | ₱18.2M |
| 17OI0012 | 9 yrs 7 mo ago | CONST. OF SLOPE PROTECTION STRUCTURES AND OTHER IMPVT ALONG TUNGTONG CREEK (FROM EVACOM TO BF MARTINFlood Control and Drainage | Terminated | Las Piñas-Muntinlupa DEO | ₱0 |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.