GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON
Contractor 99302137c65fe11d2c2e
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱27.84B · 298 contracts
Rank by recorded value
#91 of 23,487
More info
First record
Feb 10, 2016 (10 yrs 9 mo ago)
Latest record
Aug 10, 2026 (3 mos ago)
DPWH contractor code
5044
Where they work
Sultan Kudarat₱6.32B
Davao del Sur₱5.44B
South Cotabato₱5.03B
Cotabato₱2.91B
Maguindanao del Norte₱1.48B
Latest 25 from a total of 298 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 23MD0043 | 3 yrs 7 mo ago | CONSTRUCTION OF RIO GRANDE DE MINDANAO FLOOD CONTROL PROJECT (MACASENDEG SECTION), MACASENDEG, MIDSAYAP, COTABATOFlood Control and Drainage | Completed | Cotabato 1st DEO | ₱57.3M |
| 23M00079 | 3 yrs 8 mo ago | CONSTRUCTION OF MISSING LINKS/NEW ROADS - COLUMBIO-LUTAYAN-KORONADAL ROAD, PACKAGE C, STA. 1+937.000 - STA. 4+057.000, STA. 4+097.000 - STA. 8+438.700, COLUMBIO, SULTAN KUDARATRoads | Completed | Region XII | ₱144.7M |
| 22MG0079 | 3 yrs 10 mo ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING, PROFESSIONAL REGULATION COMMISSION (PRC) REGION XII-KORONADAL CITY, SOUTH COTABATOBuildings and Facilities | Completed | South Cotabato 2nd DEO | ₱96.5M |
| 21M00050 | 3 yrs 10 mo ago | CONSTRUCTION OF SILWAY 8-UPPER LABAY ROAD (PACKAGE A), STA. 16+900 STA. 20+080, GENERAL SANTOS CITY, SOUTH COTABATORoads | Completed | Region XII | ₱143.3M |
| 22M00107 | 3 yrs 10 mo ago | IMPROVEMENT AT BARANGAY POBLACION, STA. 0+000-STA. 2+862, NURO, UPI, NORTH UPI, MAGUINDANAOFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - Asphalt, Traffic Engineering and Management System (including Road Safety Devices) | Completed | Region XII | ₱102.8M |
| 17M00109 | 4 yrs 1 mo ago | DEVELOPMENT OF COTABATO AIRPORT, DATU ODIN SINSUAT, AWANG, MAGUINDANAORoads | Completed | Region XII | ₱338.9M |
| 22M00090 | 4 yrs 1 mo ago | REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - DAVAO-COTABATO RD (JCT. DIGOS-COTABATO SECT), K1690+000 - K1696+301, MIDSAYAP, NORTH COTABATOFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - Asphalt, Traffic Engineering and Management System (including Road Safety Devices) | Completed | Region XII | ₱102.3M |
| 22M00068 | 4 yrs 3 mo ago | CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SURALLAH-LAKE SEBU-MAITUM ROAD - K1765 + 560.00 - K1765 + 605.60; K1793+251.00-K1793+307.41; K1793+391.000-K1793+499.65, LAKERoads | Completed | Region XII | ₱106.1M |
| 22L00158 | 4 yrs 4 mo ago | ROAD WIDENING ALONG TIBANBAN - LAVIGAN RD (S01397MN) - K1782+600 - K1784+506, DAVAO ORIENTALRoads | On-Going | Region XI | ₱182.3M |
| 22L00126 | 4 yrs 4 mo ago | REHABILITATION OF ROAD ALONG JCT. DAVAO CITY DIV. RD - CATALUNAN GRANDE RD - JCT. MINTAL ROAD, BRGY. CATALUNAN GRANDE, DAVAO CITYRoads | On-Going | Region XI | ₱360.8M |
| 22M00101 | 4 yrs 4 mo ago | PAVING OF UNPAVED ROADS SURALLAH-LAKE SEBU-MAITUM ROAD K1779+910.80-K1781+589.80, K1781+969.80-K1782+384.80, LAKE SEBU, SOUTH COTABATORoads | Completed | Region XII | ₱114.0M |
| 22M00061 | 4 yrs 6 mo ago | CONSTRUCTION OF CONCRETE ROAD - POBLACION - SAN ISIDRO-LIBERTY-PULABATO-PALO ROAD CONNECTING TO HVCC PLANTATION AREAS AND TAMPAKAN PUBLIC MARKET IN SUPPORT OF AGRIBUSINESS INDUSTRY, SRoads | Completed | Region XII | ₱107.5M |
| 22M00082 | 4 yrs 6 mo ago | CONSTRUCTION OF CONCRETE ROAD - ROAD IN LIMULAN TO PUSOT AREA LEADING TO MARKET AND PROCESSING CENTER IN SUPPORT OF COFFEE, COCONUT AND CORN INDUSTRIES, STA. 4+810-STA. 5+760, STA. 5+820 - STA. 6+100, BRGY. LIMULAN, KALAMANSIG, SULTAN KUDARATRoads | Completed | Region XII | ₱101.3M |
| 22L00002 | 4 yrs 7 mo ago | CONSTRUCTION OF VIADUCT (PARTIAL SUBSTRUCTURE) - DAVAO CITY COASTAL ROAD (TALOMO SECTION) BYPASS ROAD (VIADUCT), PACKAGE 2, DAVAO CITYGAA 2022 OO-1 | On-Going | Region XI | ₱200.0M |
| 22M00076 | 4 yrs 7 mo ago | CONSTRUCTION OF MISSING LINKS/NEW ROADS COLUMBIO- LUTAYAN-KORONADAL ROAD, K1677+730.00-K1677+760.00,K1678+200.00-K1678+245.00,K1678+680.00-K1678+710.00, K1679+700.00-K1679+745.00,Roads | Completed | Region XII | ₱135.1M |
| 22M00077 | 4 yrs 7 mo ago | CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, PACKAGE B, STA 9+591.03 STA. 12+274, COLUMBIO AND LUTAYAN, SULTAN KUDARATRoads | Completed | Region XII | ₱130.3M |
| 22MG0032 | 4 yrs 8 mo ago | WIDENING OF BRIDGE-COLONGOLO BR. (B01040MN) ALONG SURALLAH-LAKE SEBU-MAITUM RDBridges | Completed | South Cotabato 2nd DEO | ₱90.5M |
| 21M00069 | 4 yrs 8 mo ago | CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER, TAMONTAKA IV, PHASE I, STA. 0+000-STA. 0+426 COTABATO CITYFlood Control and Drainage | Completed | Region XII | ₱96.5M |
| 21M00070 | 4 yrs 8 mo ago | CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER, TAMONTAKA V, PHASE III, STA. 0+000-STA. 0+429, COTABATO CITYFlood Control and Drainage | Completed | Region XII | ₱96.5M |
| 22MB0004 | 4 yrs 8 mo ago | PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD (S00253MN) - K1686 + 750 - K1687 + 243.61Roads | Completed | South Cotabato 1st DEO | ₱29.1M |
| 22MB0012 | 4 yrs 8 mo ago | WIDENING OF PERMANENT BRIDGES - UPPER SINAWAL BR. (B01527MN) ALONG ALBERT MORROW BLVDBridges | Completed | South Cotabato 1st DEO | ₱57.8M |
| 21M00138 | 4 yrs 8 mo ago | COTABATO-ALLAH VALLEY - MARBEL ROAD - K1849+(-290) - K1849+060, K1851+(-132) - K1851+178, COTABATO CITYRoads | Completed | Region XII | ₱20.0M |
| 21L00055 | 4 yrs 11 mo ago | REHABILITATION OF TALOMO RIVER, TALOMO BRIDGE DOWNSTREAM SECTION, LEFT BANK, DAVAO CITYFlood Control and Drainage | On-Going | Region XI | ₱178.2M |
| 21L00094 | 4 yrs 11 mo ago | PREVENTIVE MAINTENANCE OF ROAD, ASPHALT OVERLAY ALONG CIRCUMFERENTIAL ROAD (JCT. FS DIZON ST. JCT. E. QUIRINO ST.) DAVAO CITYRoads | On-Going | Region XI | ₱148.6M |
| 21M00090 | 5 yrs ago | CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS CENTER) (PHASE II) IN DATU ABDULLAH SANGKI, MAGUINDANAOBuildings and Facilities | Completed | Region XII | ₱130.3M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.