E.B.J.R. CONSTRUCTION
Contractor 9f4f3b65761c08b4d2fe
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱223.1M · 26 contracts
Rank by recorded value
#6,786 of 23,487
More info
First record
Aug 30, 2016 (10 yrs 2 mo ago)
Latest record
Apr 8, 2025 (1 yr 7 mo ago)
DPWH contractor code
19780
Where they work
Apayao₱223.1M
Latest 25 from a total of 26 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25PB0026 | 1 yr 7 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, ABBUT-CONNER RD-K0553+853-K0553+890,K0555+915-K0555+940,K0558+800-K0558+841Roads | On-Going | Apayao 1st DEO | ₱6.3M |
| 25PB0017 | 1 yr 7 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER, APAYAOGAA 2025 CP | On-Going | Apayao 1st DEO | ₱14.2M |
| 25PB0015 | 1 yr 8 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, CONNER- KABUGAO RD. - K0603+115-K0603+145Roads | On-Going | Apayao 1st DEO | ₱4.7M |
| 25PB0014 | 1 yr 8 mo ago | ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF BARREN RIVER FLOOD CONTROLGAA 2025 OO-2 | On-Going | Apayao 1st DEO | ₱11.2M |
| 24PB0038 | 2 yrs 6 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, ABBUT-CONNER RD - K0552+595 - K0552+880Roads | On-Going | Apayao 1st DEO | ₱4.7M |
| 24PB0027 | 2 yrs 7 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP), BIP-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF CONNER EDUCATION DISTRICT MULTIPURPOSE BUILDING, BARANGAY BULUAN, CONNER, APAYAOBuildings and Facilities | On-Going | Apayao 1st DEO | ₱9.6M |
| 24PB0033 | 2 yrs 7 mo ago | ORAGNIZATIONAL OUTCOME1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NERTWORK DEVELOPMENT PROGRAM- OFF-CARRIAGEWAY IMPROVEMENT- TERTIARY ROADS APAYAO-ILOCOS NORTE RD- K0608+824-K0609+112Roads | On-Going | Apayao 1st DEO | ₱4.8M |
| 24PB0004 | 2 yrs 9 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER,GAA 2024 CP | On-Going | Apayao 1st DEO | ₱28.7M |
| 23PB0016 | 3 yrs 6 mo ago | ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0604+313 - K0604+331, K0590+220 - 590+302Roads | Completed | Apayao 1st DEO | ₱4.8M |
| 23PB0021 | 3 yrs 6 mo ago | NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS, CONNER-KABUGAO RD - K0588+691 - K0588+837Roads | Completed | Apayao 1st DEO | ₱2.1M |
| 23PB0003 | 3 yrs 7 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM- TRIP), MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER,APAYAOGAA 2023 CSSP | On-Going | Apayao 1st DEO | ₱9.8M |
| 23PB0019 | 3 yrs 7 mo ago | NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, CONNER-KABUGAO RD - K0602+766 - K0603+119Roads | Completed | Apayao 1st DEO | ₱2.7M |
| 23PB0020 | 3 yrs 7 mo ago | NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, CONNER-KABUGAO RD - K0605+030 - K0605+185Roads | Completed | Apayao 1st DEO | ₱2.2M |
| 22PB0012 | 4 yrs 8 mo ago | ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, ABBUT-CONNER RD - K0558+022 - K0558+156 CONNER, APAYAORoads | Completed | Apayao 1st DEO | ₱10.3M |
| 21PB0018 | 4 yrs 11 mo ago | LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES, MULTI-PURPOSE / FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BADDUAT, KABUGAO, APAYAOBuildings and Facilities | Completed | Apayao 1st DEO | ₱4.8M |
| 21PB0005 | 5 yrs 9 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, MANAG-TALIFUGO-PADDAOAN ROAD IN SUPPORT OF BANANA, COFFEE, CACAO, RICE AND CORN INDUSTRIES, CONNER, APAYAORoads | Completed | Apayao 1st DEO | ₱19.4M |
| 19PB0037 | 7 yrs 4 mo ago | CONSTRUCTION OF CAGLAYAN MPB (KALIPI), CONNER, APAYAOBuildings and Facilities | Completed | Apayao 1st DEO | ₱2.6M |
| 19PB0007 | 7 yrs 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS,CAGLAYAN-PADDIG-CUPIS ROAD LEADING TO NABUANGAN RIVER, BANSELAN CAVE, CUPIS LOOMWEAVING, BRGY. CAGLAYAN (NEW POB.),CONNER, APAYAORoads | Completed | Apayao 1st DEO | ₱19.0M |
| 19PB0011 | 7 yrs 5 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS,MANAG-LIWAN ROAD LEADING TO PURAG RIVER, PURAG CAVE AND BELLANG CAVE, CONNER, APAYAORoads | Completed | Apayao 1st DEO | ₱17.1M |
| 19PB0018 | 7 yrs 5 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF NABUANGAN (UPSTREAM) FLOOD CONTROL, BRGY. CUPIS, CONNER, APAYAOFlood Control and Drainage | Completed | Apayao 1st DEO | ₱13.8M |
| 18PB0020 | 8 yrs 9 mo ago | LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF SLOPE PROTECTION, MANAG BRGY. HALL, MANAG, CONNER, APAYAOFlood Control and Drainage | Completed | Apayao 1st DEO | ₱1.9M |
| 17PC0104 | 8 yrs 9 mo ago | PACKAGE VIII. 1.) CONSTRUCTION OF STA. FILOMENA SCHOOL OF ARTS AND TRADE 2 CL WORKSHOP BUILDING 2.) CONSTRUCTION OF STA. FILOMENA SCHOOL OF ARTS AND TRADE 1 CL WORKSHOP BUILDING 3.) ONSTRUCTION OF STA. FILOMENA SCHOOL OF ARTS AND TRADE 1 STOREY 2CLBuildings and Facilities | Completed | Apayao 2nd DEO | ₱12.7M |
| 16PB0028 | 10 yrs ago | CONCRETING OF CALAFUG-LIPAY-MASICU FMR, BRGY. CALAFUG-LIPAY-MASICU, CONNER, APAYAORoads | Completed | Apayao 1st DEO | ₱2.5M |
| 16PC0023 | 10 yrs 2 mo ago | CONCRETING OF STA. FILOMENA-SINIGPIT FMR, BRGY STA. FILOMENA, CALANASAN, APAYAORoads | Completed | Apayao 2nd DEO | ₱6.7M |
| 16PC0035 | 10 yrs 2 mo ago | CONCRETING OF SALAGUNTING-CADACLAN FMR, CALANASAN, APAYAORoads | Completed | Apayao 2nd DEO | ₱3.8M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.