C.T. LEONCIO CONSTRUCTION & TRADING (17371) / HARDROCKPLATINUM DEVELOPMENT CORPORATION
Contractor a00c7321471745469efb
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱626.9M · 6 contracts
Rank by recorded value
#3,529 of 23,487
More info
First record
May 23, 2022 (4 yrs 5 mo ago)
Latest record
Mar 11, 2023 (3 yrs 8 mo ago)
DPWH contractor code
39263
Where they work
Palawan₱626.9M
Latest 6 from a total of 6 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 23E00071 | 3 yrs 8 mo ago | CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURES- RC DIKE WITH STEEL SEET PILES ALONG PANACAN RIVER (BOTH SIDES), NARRA, PALAWANGAA 2023 OO-2 | Completed | MIMAROPA Region | ₱96.5M |
| 23E00072 | 3 yrs 8 mo ago | CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS- CONST. OF RIVERBANK PROTECTION SRUCTURES- RC DIKE WITH STEEL SHEET PILES ALONG SALOGON RIVER (BOTH SIDES), BROOKE'S POINT, PALAWANGAA 2023 OO-2 | Completed | MIMAROPA Region | ₱96.5M |
| 23E00078 | 3 yrs 8 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF BULILUYAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, BATARAZA, PALAWANGAA 2023 CSSP | On-Going | MIMAROPA Region | ₱120.6M |
| 23E00091 | 3 yrs 8 mo ago | CONST./REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, ABORLAN, PALAWANGAA 2023 OO-2 | Completed | MIMAROPA Region | ₱120.3M |
| 22E00132 | 4 yrs 4 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM, PHASE I, PUERTO PRINCESA NORTH ROAD, BRGY. SAN MANUEL TO OUTFALL, STA. 0+000-STA. 0+556.40, PALAWANGAA 2022 OO-2 | Completed | MIMAROPA Region | ₱96.5M |
| 22EG0066 | 4 yrs 5 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, IRAAN WATERWAYS, PHASE 3, LEFT BANK: 0+000-0+380; UPPER LEFT BANK: 0+389-0+503; RIGHT BANK: 0+107-0+364, ABORLAN, PALAWANGAA 2022 OO-2 | Completed | Palawan 3rd DEO | ₱96.5M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.