SDWC CONSTRUCTION
Contractor ab017af2ec6f1b0e8c81
Overview
PhilGEPS awards
₱827.4M · 50 awards
DPWH contracts
₱814.6M · 55 contracts
Rank by recorded value
#1,717 of 23,487
More info
First record
Mar 17, 2022 (4 yrs 8 mo ago)
Latest record
Sep 4, 2026 (2 mos ago)
DPWH contractor code
51725
Where they work
Latest 25 from a total of 55 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 24DG0027 | 2 yrs 2 mo ago | CONST OF ROAD SLOPE PROTECTION STRUCTURE-ISAAC O. TOLENTINO AVE. K0063+620-K0063+637Roads | Completed | Cavite 2nd DEO | ₱3.9M |
| 24DG0028 | 2 yrs 2 mo ago | CONST OF ROAD SLOPE PROTECTION STRUCTURE-ISAAC O. TOLENTINO AVE K0063+687-K0063+703Roads | Completed | Cavite 2nd DEO | ₱4.3M |
| 24DG0030 | 2 yrs 2 mo ago | CONST OF ROAD SLOPE PROTECTION STRUCTURE-TAG-TAAL LAKE ROAD K0058+356-K0058+400Roads | Completed | Cavite 2nd DEO | ₱27.4M |
| 24DG0109 | 2 yrs 2 mo ago | CONC. OF SITIO TIKWI, BRGY. SAN AGUSTIN FMR, BRGY. SAN AGUSTIN, MAGALLANES, CAVITERoads | On-Going | Cavite 2nd DEO | ₱14.9M |
| 24DG0110 | 2 yrs 3 mo ago | CONC OF SITIO AB-AB, BRGY RAMIREZ, FMR, BRGY RAMIREZ, MAGALLANES, CAVITEGAA 2024 DA FMR | Completed | Cavite 2nd DEO | ₱14.9M |
| 24DG0111 | 2 yrs 3 mo ago | CONC OF SITIO AB-AB,BRGY RAMIREZ FMR PHASE II, BRGY RAMIREZ, MAGALLANES, CAVITEGAA 2024 DA FMR | Completed | Cavite 2nd DEO | ₱14.9M |
| 24DG0057 | 2 yrs 4 mo ago | SPECIAL ROAD FUND-INST OF RD SAFETY DEV ALONG ISAAC O.TOLENTINO AVE-K0057+(-1057)-K0057+000,TAG CITYRoads | Completed | Cavite 2nd DEO | ₱2.2M |
| 24DG0104 | 2 yrs 4 mo ago | CONCRETING OF BRGY UPLI FMR, BRGY UPLI, ALFONSO, CAVITEGAA 2024 DA FMR | Completed | Cavite 2nd DEO | ₱5.0M |
| 24DG0049 | 2 yrs 5 mo ago | NETWORK-DEV'T-OFF CARRIAGEWAY IMP-SECONDARY ROADS-ISAAC O. TOELNTINO AVE.-K0057-450GAA 2024 OO-1 | Completed | Cavite 2nd DEO | ₱17.6M |
| 24DG0051 | 2 yrs 5 mo ago | NETWORK DEV'T-OFF CARRIAGEWAY-OFF-CARRIAGEWAY IMP-SECONDARY ROADS-TAG-MLA VIA SILANG ROAD-K0054+559GAA 2024 OO-1 | Completed | Cavite 2nd DEO | ₱17.6M |
| 24DG0058 | 2 yrs 5 mo ago | SRF-MVUC AS PER RA11239-INSTALLATION OF ROAD SAFETY DEVICES ALONG TAG-MLA VIA SILANG RD, TAG CITYRoads | Completed | Cavite 2nd DEO | ₱1.7M |
| 24DG0019 | 2 yrs 6 mo ago | RECONST TO CONC PAVEMENT-MAR-MAG-AMUYONG RD-K0069+000-K0069+597Roads | Completed | Cavite 2nd DEO | ₱14.7M |
| 24DG0106 | 2 yrs 6 mo ago | CONST OF 2STOREY BLDG WITH 4CL @ ANULING E/S @ BRGY ANULIN GCERCA I, MENDEZ NUÑEZ, CAVITEBuildings and Facilities | Completed | Cavite 2nd DEO | ₱16.7M |
| 24DG0071 | 2 yrs 7 mo ago | RETROFITTING/STRENGHTENING OF BRIDGE-CONVENTO BR (B04543LZ) ALONG JUANITO REMULLA SR. ROADBridges | Completed | Cavite 2nd DEO | ₱16.6M |
| 23DG0011 | 3 yrs 1 mo ago | WIDENING OF BRIDGE-RED BRIDGE (B04768LZ)ALONG MARAGONDON-MAGALLANES-AMUYONG ROADBridges | Completed | Cavite 2nd DEO | ₱29.4M |
| 23DG0055 | 3 yrs 3 mo ago | CONST OF WATER SUPPLY SYSTEM-CONST OF SOLAR WATER SYSTEM, BRGY TALIPUSNGO, MARAGONDON, CAVITEWater Provision and Storage | Completed | Cavite 2nd DEO | ₱9.7M |
| 23DG0056 | 3 yrs 3 mo ago | CONST OF WATER SUPPLY SYSTEMS-CONST OF SOLAR WATER SYSTEM,BRGY. SAPANG 1, TERNATE,CAVITEWater Provision and Storage | Completed | Cavite 2nd DEO | ₱9.8M |
| 23DG0057 | 3 yrs 3 mo ago | CONST OF WATER SUPPLY SYSTEMS-CONST OF SOLAR WATER SYSTEM, BRGY BANCAAN, NAIC, CAVITEWater Provision and Storage | Completed | Cavite 2nd DEO | ₱9.7M |
| 23DG0058 | 3 yrs 3 mo ago | CONST OF WATER SUPPLY SYSTEMS-CONST OF SOLAR WATER SYSTEM,BRGY GALICIA 3, MENDEZ, CAVITEWater Provision and Storage | Completed | Cavite 2nd DEO | ₱9.8M |
| 23DG0052 | 3 yrs 3 mo ago | CONST OF MPB (KICKBOXING TRAINING AND BILLETING) BRGY KAYBAGAL SOUTH, TAGAYTAY CITYBuildings and Facilities | Completed | Cavite 2nd DEO | ₱21.8M |
| 23DG0076 | 3 yrs 4 mo ago | OPENING & CONC OR BRGY PANUNGYAN I, FMR, BRGY PANUGYAN I, MENDEZ, CAVITERoads | Completed | Cavite 2nd DEO | ₱11.6M |
| 23DG0050 | 3 yrs 7 mo ago | CONST OF MPB-CONST OF MPB (SCHOOL BLDG), BRGY MALAINEN BAGO, NAIC, CAVITEBuildings and Facilities | Completed | Cavite 2nd DEO | ₱19.8M |
| 23DG0037 | 3 yrs 7 mo ago | CONST OF MPB-BRGY HALL, BRGY. TABORA, GEN EMILIO AGUINALDO, CAVITEBuildings and Facilities | Completed | Cavite 2nd DEO | ₱6.9M |
| 23DG0041 | 3 yrs 7 mo ago | CONST OF MPB, BRGY HALL, BRGY KAYPAABA, GEN E AGUINALDO, CAVBuildings and Facilities | Completed | Cavite 2nd DEO | ₱6.9M |
| 23D00009 | 3 yrs 7 mo ago | CONSTRUCTION OF MISSING LINKS / NEW ROADSTAGAYTAY-CALAMBA ROAD VIA CANLUBANG, CAVITE SECTION, PACKAGE B, CAVITEGAA 2023 OO-1 | Completed | Region IV-A | ₱28.7M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.