TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC
Contractor b2b1f22b7ace240d83b2
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱8.38B · 57 contracts
Rank by recorded value
#410 of 23,487
More info
First record
Jan 28, 2016 (10 yrs 9 mo ago)
Latest record
Jun 9, 2026 (5 mos ago)
DPWH contractor code
9650
Where they work
Latest 25 from a total of 57 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 18C00086 | 7 yrs 10 mo ago | LOCAL PROGRAMS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION/IMRPOVEMENT/UPGRADING OF LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD, (PHASE 6), PAMPANGARoads | Completed | Region III | ₱133.6M |
| 18CH0139 | 8 yrs 2 mo ago | CONCRETING OF PUROK 2, CALZADANG BAYU FMR, BRGY. CALZADANG BAYU, PORAC, PAMPANGARoads | Completed | Pampanga 2nd DEO | ₱4.7M |
| 18C00051 | 8 yrs 3 mo ago | CONSTRUCTION OF FLOOD CONTROL WORKS ALONG SAPANG BAYU AND SAPANG MARAGUL, LUBAO AND STA. RITA, PAMPANGAFlood Control and Drainage | Completed | Flood Control Management Cluster | ₱94.0M |
| 18O00005 | 8 yrs 4 mo ago | MINDANAO AVENUE EXTENSION SEGMENT 2C, PHASE I AND PHASE II INCLUDING ROW CALOOCAN CITY AND VALENZUELA CITYRoads | On-Going | National Capital Region | ₱69.0M |
| 18CH0054 | 8 yrs 4 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION/IMPROVEMENT OF DIKE WITH SLOPE PROTECTION ALONG PORAC RIVER, STA. RITA, LUBAO, PAMPANGAFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱44.0M |
| 18CI0087 | 8 yrs 5 mo ago | CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL BRIDGES; CONST OF BRIDGE WITH SLOPE PROTECTION AT BRGY STA MARIA, MABALACAT, PAMPANGABridges | Completed | Pampanga 3rd DEO | ₱23.3M |
| 18C00031 | 8 yrs 6 mo ago | BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, BAMBAN-CENTENNIAL BRIDGE (BO0102LZ) ALONG MANILA NORTH ROAD (PHASE III), MABALACAT, PAMPANGABridges | Completed | Region III | ₱111.0M |
| 18D00029 | 8 yrs 7 mo ago | CONVERGENCE & SPL. SUPPORT PROG., CONST./IMPVT. OF ACCESS ROADS LDG. TO TRADES, IND. & ECONOMIC ZONES, PULO-DIEZMO RD. CONNECTING BRGY. PULO & BRGY. DIEZMO-NAT'L. ROAD TO SLEX IN SUPPORT OF TRANSPORT & LOGISTICS CO., INCL. BR., CABUYAO CITY, LAGUNABridges, Roads | Completed | Region IV-A | ₱130.6M |
| 18CI0009 | 8 yrs 8 mo ago | FLOOD MANAGEMENT PROGRAM:CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM; CONST OF REINFORCED CONCRETE SLOPE PROTECTION W/ STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY SAPALIBUTAD, ANGELES CITY, PAMPANGAFlood Control and Drainage | Completed | Pampanga 3rd DEO | ₱48.3M |
| 18C00035 | 8 yrs 8 mo ago | CONSTRUCTION AND MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ALMACEN RIVER IMPROVEMENT PROJECT, HERMOSA AND ORANI, BATAAN, PROVINCE OF BATAANFlood Control and Drainage | Completed | Region III | ₱136.3M |
| 17Z00019 | 8 yrs 9 mo ago | PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITYFlood Control and Drainage | Completed | Flood Control Management Cluster | ₱689.3M |
| 17I00053 | 8 yrs 11 mo ago | STORM SURGE PROTECTION: ROAD HEIGHTENING AND TIDE EMBANKMENT PROJECT, SECTION 5, CLUSTER 3: 1 . STORM SURGE PROTECTION: HEIGHTENEND ROAD AND TIDE EMBANKMENT,SECTION 5 PHASE 5,STATION 3+700-STATION 4+060,SAN JOAQUIN,PALO,LEYTE...,PALO,LEYTE & TANAUAN,LEYTEFlood Control and Drainage | Completed | Region VIII | ₱289.5M |
| 17C00054 | 8 yrs 11 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY STA. CRUZ, SAN SIMON, PAMPANGAFlood Control and Drainage | Completed | Flood Control Management Cluster | ₱144.6M |
| 17Z00004 | 9 yrs 2 mo ago | REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECTFlood Control: Construction - Channel Excavation, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Flood Control Management Cluster | ₱862.9M |
| 17CH0090 | 9 yrs 4 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONSTRUCTION/IMPROVEMENTFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱46.8M |
| 17E00008 | 9 yrs 4 mo ago | CONCRETING OF ARMY ROAD (BAGUBAG-SORVILLE-GOZAR-BINAKAS) LEADING TO PAF GOZAR RADAR STATION IN MT. AMBULONG, BRGY. SORVILLE, STA. 2+745.80-STA.5+587.20; STA.6+242-STA.6+364, LUBANGISLAND, OCCIDENTAL MINDOROGAA 2017 LFP | Completed | Mindoro Occidental DEO | ₱91.9M |
| 17CH0001 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPEFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱44.5M |
| 17CH0005 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPEFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱39.7M |
| 17CH0019 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEMFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱41.9M |
| 17CH0033 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOODFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱27.3M |
| 17CH0035 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPEFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱28.0M |
| 16CH0058 | 10 yrs ago | CONSTRUCTION OF FARM TO MILL ROAD BRGY. PLANAS TO BRGY. PASBUL, PORAC, PAMPANGARoads | Completed | Pampanga 2nd DEO | ₱11.4M |
| 16CH0042 | 10 yrs 3 mo ago | CONSTRUCTION OF SLOPE PROTECTION OF GUMAIN RIVER, BRGY. GUTAD TO CONSUELO, FLORIDABLANCA, PAMPANGAFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱29.5M |
| 16P00063 | 10 yrs 4 mo ago | MFO 1 - NATIONAL ROAD NETWORK SERVICES - CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROADS - REPLACEMENT OF BRIDGES - (TEMPORARY TO PERMANENT) MATALAG BRIDGE (B02242LZ) ALONG CONNER - KABUGAO ROAD [REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT)Bridges | Terminated | Cordillera Administrative Region | ₱0 |
| 16P00064 | 10 yrs 5 mo ago | CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADSREPLACEMENT OF PERMANENT WEAK BRIDGESCAMP 5 BRIDGE 2 (B02182LZ) ALONG KENNON ROADBridges | Terminated | Cordillera Administrative Region | ₱9.1M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.