F. GURREA CONSTRUCTION, INCORPORATED
Contractor b73c4557f52fd82860bb
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱15.41B · 222 contracts
Rank by recorded value
#204 of 23,487
More info
First record
Feb 15, 2016 (10 yrs 9 mo ago)
Latest record
Sep 1, 2025 (1 yr 2 mo ago)
DPWH contractor code
6995
Where they work
Latest 25 from a total of 222 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 22GG0066 | 4 yrs 8 mo ago | CONSTRUCTION OF SEA WALL / STORM SURGE PROTECTION, BANATE, ILOILOFlood Control and Drainage | Completed | Iloilo 2nd DEO | ₱84.6M |
| 22GF0032 | 4 yrs 9 mo ago | PREVENTIVE MAINTENANCE ALONG ILOILO-ANTIQUE RD. - K0027+549 - K0028+412, K0031+024 - K0031+751Roads | Completed | Iloilo 1st DEO | ₱38.8M |
| 22HM0059 | 4 yrs 9 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES, OLO BR. (B00010SJ) ALONG SIQUIJOR CIRCUMFERENTIAL RDGAA 2022 OO-1 | On-Going | Siquijor DEO | ₱29.3M |
| 21GF0042 | 5 yrs 1 mo ago | CONSTRUCTION/REHABILITATION/IMPROVEMENT/ROAD WIDENING/ASPHALT OVERLAY INCLUDING STREET LIGHTS AND DRAINAGE ALONG BAGUMBAYAN-GRANADA-GENGOS-LAKANDULA-GOTERA-GONZALES-LIBO-ON-GARGARITANO-CARLOS FRUTO-MAGSAYSAY-GENEROSA-CRISTOBAL-COLON-PESCADORES-BLUMENTRIT-Roads | Completed | Iloilo 1st DEO | ₱49.2M |
| 21G00011 | 5 yrs 1 mo ago | CONSTRUCTION OF ILOILO RIVER NORTH BANK ROAD (PHASE 2), OTON, ILOILOBridges, Roads | Completed | Region VI | ₱195.9M |
| 21GB0042 | 5 yrs 1 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SIBALOM RIVER BRGY. SAN PEDRO AND BRGY. PANTAO, SAN JFlood Control and Drainage | Completed | Antique DEO | ₱18.8M |
| 21GA0100 | 5 yrs 4 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) ALONG AKLAN RIVER BRGY. POBLACION, MALINAO, AKLANFlood Control and Drainage | Completed | Aklan DEO | ₱94.3M |
| 21GA0214 | 5 yrs 5 mo ago | IMPROVEMENTS/REHABILITATION OF BORACAY CIRCUMFERENTIAL ROAD BOLABOG 24/7 AND BOLABOG ATI VILLAGE BOARDWALK, AKLAN BORACAY, MALAY, AKLANRoads | Completed | Aklan DEO | ₱45.5M |
| 21GH0035 | 5 yrs 5 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF BAROTAC VIEJO RIVER CONTROL, BARANGAY POBLACION ILAWOD , BAROTAC VIEJO, ILOILO, STA. 3+528.6 - STA 2+881.44, BAROTAC VIEJO, ILOILOFlood Control and Drainage | Completed | Iloilo 3rd DEO | ₱77.2M |
| 21GH0081 | 5 yrs 5 mo ago | CONSTRUCTION OF CONCRETE ROAD - BAROTAC VIEJO BYPASS ROAD, ILOILORoads: Construction - Gravel, Roads: Construction - PCCP | Completed | Iloilo 3rd DEO | ₱49.0M |
| 21GD0001 | 5 yrs 6 mo ago | PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ RD (NEW ROUTE) - KO106+(-543) - KO106+179, KO111+665 - KO113+504Roads | Completed | Capiz 1st DEO | ₱41.7M |
| 21GE0099 | 5 yrs 6 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF RIVER CONTROL DIKE WITH ESPLANADE (PHASE II), BARANGAY POBLACION, JORDAN, GUIMARASFlood Control and Drainage | Completed | Guimaras DEO | ₱45.5M |
| 21GA0022 | 5 yrs 6 mo ago | CONST. OF REVETMENT WALL ALONG AKLAN RIVER, BRGY. POLO, BANGA, AKLANFlood Control and Drainage | Completed | Aklan DEO | ₱76.2M |
| 21GH0058 | 5 yrs 6 mo ago | OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - ILOILO EAST COAST-CAPIZ RD K0177+290 - K0178+688, K0178+931 - K0182+180, BALASAN, ESTANCIA AND BATAD, ILOILOFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP | Completed | Iloilo 3rd DEO | ₱86.4M |
| 21GF0079 | 5 yrs 6 mo ago | WIDENING OF PERMANENT BRIDGES - BAGUINGIN PARALLEL BR. ALONG ILOILO - ANTIQUE RDBridges | Completed | Iloilo 1st DEO | ₱53.5M |
| 21GG0127 | 5 yrs 7 mo ago | CONSTRUCTION OF SEA WALL/STORM SURGE PROTECTION WITH EMBANKMENT/ ROAD CONCRETING, BANATE, ILOILOFlood Control: Construction - Shore Protection (e.g., Seawall, Breakwater), Roads: Construction - PCCP | Completed | Iloilo 2nd DEO | ₱49.0M |
| 21GP0027 | 5 yrs 7 mo ago | CONCRETING OF ROAD OPENING, BARANGAY SAN MARTIN, DUMALAG TO BARANGAY STA. TERESA, DUMALAG, CAPIZRoads | Completed | Capiz 2nd DEO | ₱67.5M |
| 21G00027 | 5 yrs 7 mo ago | CONSTRUCTION OF POLICE COMMISSIONED OFFICERS QUARTERS BUILDING, CAMP MARTIN DELGADO, ILOILO CITY, ILOILOBuildings and Facilities | Completed | Region VI | ₱28.9M |
| 21GG0089 | 5 yrs 7 mo ago | CONSTRUCTION OF FLOOD CONTROL/ SLOPE PROTECTION IN BAROTAC NUEVO, ILOILOFlood Control and Drainage | Completed | Iloilo 2nd DEO | ₱37.2M |
| 21GI0002 | 5 yrs 8 mo ago | CONSTRUCTION OF SIBALOM FLOOD CONTROL PROJECT (SIBALOM RIVER), BARANGAY NAGBANGI, LEON, ILOILOFlood Control and Drainage | Completed | Iloilo 4th DEO | ₱75.3M |
| 21G00052 | 5 yrs 8 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SIPALAY RIVER, SIPALAY CITY, NEGROS OCCIDENTALFlood Control and Drainage | Completed | Region VI | ₱88.1M |
| 20GG0028 | 5 yrs 11 mo ago | CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - LAMBUNAO - INCA ROAD, K0059 + 260 - K0059 + 405; K0060 + 039 - K0060 + 151Roads | Completed | Iloilo 2nd DEO | ₱68.0M |
| 20GG0076 | 5 yrs 11 mo ago | CONSTRUCTION OF FLOOD CONTROL/ SLOPE PROTECTION ALONG JALAUR RIVER IN SAN ENRIQUE, ILOILOFlood Control and Drainage | Completed | Iloilo 2nd DEO | ₱37.2M |
| 20GF0001 | 5 yrs 11 mo ago | PREVENTIVE MAINTENANCE - ILOILO-ANTIQUE ROAD - K0011+721 - K0011+921, K0033+310 - K0033+665, K0035+021 - K0035+235, K0064+116 - K0064+682, K0064+842 - K0065+301, K0066+000 - K0066+879Roads | Completed | Iloilo 1st DEO | ₱49.0M |
| 20GF0080 | 5 yrs 11 mo ago | REHABILITATION/MAJOR REPAIR OF GUIMBAL FLOOD CONTROL STRUCTURES LEADING TO GUIMBAL PORT, GUIMBAL, ILOILOFlood Control and Drainage | Completed | Iloilo 1st DEO | ₱43.5M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.