E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.)
Contractor ca2d9fa229d5ad5d41dc
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱3.19B · 107 contracts
Rank by recorded value
#1,006 of 23,487
More info
First record
Feb 15, 2016 (10 yrs 9 mo ago)
Latest record
Aug 20, 2026 (2 mos ago)
DPWH contractor code
5648
Where they work
Camarines Sur₱3.16B
Albay₱30.1M
Latest 25 from a total of 107 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 22FG0001 | 4 yrs 9 mo ago | OFF-CARRIAGEWAY ALONG LAGONOY - PRESENTACION ROAD, K0504+000.00 - K0504+924.00 LAGONOY, CAMARINES SURRoads | Completed | Camarines Sur 4th DEO | ₱14.7M |
| 22FG0009 | 4 yrs 9 mo ago | REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE, GUABANG BRIDGE (B00483LZ) ALONG GOA-DIGDIGON-SAN ISIDRO ROAD, BRGY. PINAGLABANAN, GOA, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱4.8M |
| 22FG0012 | 4 yrs 9 mo ago | RETROFITTING / STRENGTHENING OF PERMANENT BRIDGE, BOLO BRIDGE (B00508LZ) ALONG JCT. DIGDIGON (GOA) - TINAMBAC ROAD, BARANGAY PAYATAN, GOA, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱8.2M |
| 22FG0014 | 4 yrs 9 mo ago | REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGE, RANGAS BRIDGE II (B02550LZ) ALONG SAN RAFAEL-MAMPIRAO-SAN JOSE ROAD, BARANGAY MAMPIRAO, SAN JOSE, CAMARINES SURBridges: Rehabilitation - Concrete (Superstructure) - without Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Camarines Sur 4th DEO | ₱4.6M |
| 22FG0015 | 4 yrs 9 mo ago | CONSTRUCTION OF BY PASS AND DIVERSION ROAD, JCT. NATO - SABANG COASTAL ROAD (TAGAS BRIDGE 2) CAMARINES SURBridges: Construction - Concrete (Superstructure) - with Driven Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Camarines Sur 4th DEO | ₱49.0M |
| 21FG0053 | 5 yrs ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG KULASI RIVERSECTION 1: STA.0+045.00 - STA.0+155.00 (PCCP & RCBC)SECTION 2: STA.0+000.00 - STA.0+150.00 (UPSTREAM)SECTION 3: STA.0+000.00 - STA.0+128.00 (DOWNSTREAM)SAN ROQUE, LAGONOY, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 4th DEO | ₱49.0M |
| 21FG0029 | 5 yrs 4 mo ago | OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT. DIGDIGON (GOA) - TINAMBAC ROADSECTION 1: K0502+269.00 - K0502+815.70 (B/S)SECTION 2: K0502+815.70 - K0503+121.00 (L/S)SECTION 3: K0503+121.00 - K0503+241.00 (B/S)TINAMBAC, CAMARINES SURRoads | Completed | Camarines Sur 4th DEO | ₱9.8M |
| 21FG0028 | 5 yrs 8 mo ago | REHABILITATION/MAJOR REPAIR OF BRIDGE, IGOT BRIDGE (B02389LZ) ALONG PILI-ALBAY BOUNDARY ROAD, K0503+096.00 - K0503+110.00, PATITINAN, SAGNAY, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱8.9M |
| 21FG0033 | 5 yrs 8 mo ago | REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, BAHAY BRIDGE (B04266LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY VIA SAN VICENTE ROAD K0566+118.00 - K0566+173.00BARANGAY BAHAY, CARAMOAN, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱16.7M |
| 21FG0010 | 5 yrs 8 mo ago | REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE, PILI BRIDGE (B01895LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0554+182.00 - K0557+224.00TABIGUIAN, CARAMOAN, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱7.3M |
| 21FG0016 | 5 yrs 8 mo ago | REHABILITATION/MAJOR OF REPAIR OF PERMANENT BRIDGE, ANKOLAN BRIDGE (B04169LZ) ALONG PRESENTACION - MALIGAYA ROADK0531+014.00 - K0531+045.00BARANGAY STA. MARIA, PRESENTACION, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱4.7M |
| 21FG0023 | 5 yrs 8 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, CODONG BRIDGE (B00512LZ) ALONG JCT. BINALAY (TINAMBAC) - TAMBAN ROADK0514+979 - K0514+1007.00BARANGAY OLAG-PEQUENO, TINAMBAC, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱9.3M |
| 21FG0024 | 5 yrs 8 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE, BATAAN BRIDGE (B00513LZ) ALONG JCT. BINALAY (TINAMBAC) - TAMBAN ROADK0519+371.00 - K0519+384.00BARANGAY BATAAN, TINAMBAC, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱6.3M |
| 21FN0024 | 5 yrs 8 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER, DOWNSTREAM OF MALIBAN BRIDGE, SAN ESTEBAN· STA. BARBARA SECTION, NABUA, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 5th DEO | ₱35.4M |
| 21FG0017 | 5 yrs 8 mo ago | REHABILITATION/MAJOR REPAIR OF BRIDGE, ODIONGAN BRIDGE (B02385LZ) ALONG PILI-TIGAON-ALBAY BOUNDARY ROAD,K0489+373.00 - K0489+387.00BARANGAY TURAGUE, SAGNAY, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱7.4M |
| 21FG0025 | 5 yrs 8 mo ago | REHABILITATION/MAJOR REPAIR OF BRIDGE, SAGPON BRIDGE (B00476LZ) ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0481+155.00 - K0481+171.00BARANGAY SAN FRANCISCO, TIGAON, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱7.4M |
| 20FG0056 | 5 yrs 11 mo ago | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG LAGONOY-PRESENTACION ROADSECTION 1 : K0511+000.00 - K0511+156SECTION 2 : K0511+473.00 - K0511+750PRESENTACION, CAMARINES SURRoads | Completed | Camarines Sur 4th DEO | ₱12.6M |
| 20FG0002 | 5 yrs 11 mo ago | REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG PILI-TIGAON-ALBAY BOUNDARY ROADK0488+705 - K0488+810K0488+853 - K0489+126K0497+660 - K0497+740SAGÑAY, CAMARINES SURRoads | Completed | Camarines Sur 4th DEO | ₱46.5M |
| 20FG0080 | 5 yrs 11 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE ALONG RANGAS RIVER SECTION 1: STA. 0+000-STA.0+050.00 SECTION 2: STA.0+000.00-STA.0+150.00 SECTION 3: STA.0+000.00-STA.0+080.00 PUGAY, SAN JOSE, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 4th DEO | ₱47.0M |
| 20F00006 | 6 yrs 8 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-PAWILI BRIDGE (B00451LZ) ALONG DAANG MAHARLIKA (LZ), BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICTBridges | Completed | Region V | ₱101.3M |
| 20FN0033 | 6 yrs 8 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE REPLACEMENT OF PERMANENT WEAK BRIDGES, IMBAN BR. (B00454LZ) ALONG DAANG MAHARLIKA, NABUA, CAMARINES SUR K0468+516Bridges | Completed | Camarines Sur 5th DEO | ₱31.8M |
| 20FN0041 | 6 yrs 8 mo ago | OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE- WIDENING OF PERMANENT BRIDGES, MAMPUAG BR. (B00467LZ) ALONG NABUA-BALATAN ROAD, NABUA, CAMARINES SURK0472+365Bridges | Completed | Camarines Sur 5th DEO | ₱29.7M |
| 20FG0024 | 6 yrs 8 mo ago | WIDENING OF PERMANENT BRIDGE, BALANGAO BRIDGE (BO2379LZ) ALONG PILI-TIGAON-ALBAY BOUNDARY ROADK0473+(-912.30) - K0473+(-889.70)MABALODBALOD, TIGAON, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱27.9M |
| 20FG0053 | 6 yrs 8 mo ago | WIDENING OF PERMANENT BRIDGE, PANAGAN BRIDGE (B02380LZ) ALONG PILI-TIGAON-ALBAY BOUNDARY ROAD (P00402043LZ) TIGAON, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱41.4M |
| 19FF0148 | 6 yrs 11 mo ago | REHAB / REPAIR OF PUGAY BRIDGE ALONG SAN RAFAEL - MAMPIRAO - SAN JOSE ROAD, PUGAY, SAN JOSE, CAMARINES SURBridges | Completed | Camarines Sur 4th DEO | ₱28.4M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.