FERDSTAR BUILDERS INC.
Contractor d2cfdc84dd702f82b45d
Overview
PhilGEPS awards
₱3.49B · 25 awards
DPWH contracts
₱8.76B · 138 contracts
Rank by recorded value
#271 of 23,487
More info
First record
Jan 20, 2016 (10 yrs 9 mo ago)
Latest record
May 22, 2025 (1 yr 5 mo ago)
DPWH contractor code
4965
Where they work
Latest 25 from a total of 138 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 18CJ0023 | 8 yrs 9 mo ago | CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER CONTROL LEFT DIKE, BRILLANTE SECTION, PANIQUI, TARLACFlood Control and Drainage | Completed | Tarlac DEO | ₱32.6M |
| 18CJ0024 | 8 yrs 9 mo ago | CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER CONTROL LEFT DIKE, BRILLANTE-RANG-AYAN SECTION, PANIQUI, TARLACFlood Control and Drainage | Completed | Tarlac DEO | ₱30.7M |
| 18CJ0027 | 8 yrs 9 mo ago | CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL (LEFT DIKE), BALAOANG SECTION, BALAOANG, PANIQUI, TARLACFlood Control and Drainage | Completed | Tarlac DEO | ₱33.5M |
| 17CG0324 | 8 yrs 10 mo ago | CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REPLACEMENT OF PERMANENT WEAK BRIDGES SAN BARTOLOME BR (B04192LZ) ALONG STO. TOMAS-MINALIN ROAD (MINALIN-MACABEBE SECTION) , STO. TOMAS, PAMPANGABridges | Completed | Pampanga 1st DEO | ₱20.2M |
| 17CG0155 | 9 yrs 1 mo ago | CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REPLACEMENT OF PERMANENT WEAK BRIDGE CADUANG TETE BRIDGE (B01462LZ) ALONG APALIT-MACABEBE-APALIT ROAD, APALIT, PAMPANGABridges | Completed | Pampanga 1st DEO | ₱45.4M |
| 17CH0099 | 9 yrs 3 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - REHABILITATION OF DIKEFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱28.1M |
| 17CG0041 | 9 yrs 4 mo ago | REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG STA. RITA, SAN LUIS, PAMPANGA (PHASE 1).Flood Control and Drainage | Completed | Pampanga 1st DEO | ₱45.6M |
| 17IM0013 | 9 yrs 4 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE AT BURAYAN RIVER ALONG PICAS SAN JOSE DZR AIRPORT NATIONAL ROAD, TACLOBAN CITYFlood Control and Drainage | Completed | Tacloban City DEO | ₱27.0M |
| 17CJ0079 | 9 yrs 4 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE AND SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, PANIQUI - CAMILING SECTION (LEFT DIKE), PANIQUI AND CAMILING, TARLAC STA 0+000 - STA 0+771Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Tarlac DEO | ₱92.6M |
| 17CJ0080 | 9 yrs 4 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF DIKE AND SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, PANIQUI - CAMILING SECTION (LEFT DIKE), PANIQUI AND CAMILING, TARLAC STA 0+771 - STA 1+542Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | Completed | Tarlac DEO | ₱92.5M |
| 17CJ0081 | 9 yrs 4 mo ago | CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS; WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, BALAOANG BR. 1 (BO1367LZ) ALONG PANIQUI - CAMILING - WAWA ROADBridges | Completed | Tarlac DEO | ₱30.5M |
| 17CJ0083 | 9 yrs 4 mo ago | CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS; WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES, BARANGOBONG BR. 2 (BO1365LZ) ALONG PANIQUI - CAMILING - WAWA ROADBridges | Completed | Tarlac DEO | ₱30.8M |
| 16CK0210 | 9 yrs 7 mo ago | CONST. OF PROTECTIVE DIKE ALONG BANGUT RIVER, LEFT BANK, UPSTREAM OF BANGUT BRIDGE, CAPAS, TARLACFlood Control and Drainage | Completed | Tarlac 2nd DEO | ₱44.7M |
| 17CG0042 | 9 yrs 7 mo ago | REHABILITATION/IMPROVEMENT & SLOPE PROTECTION OF LOURDES RIVER, MINALIN, PAMPANGAFlood Control and Drainage | Completed | Pampanga 1st DEO | ₱36.1M |
| 17CH0038 | 9 yrs 8 mo ago | REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ONRoads | Completed | Pampanga 2nd DEO | ₱25.3M |
| 17CH0004 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPEFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱44.8M |
| 17CH0022 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SLOPE PFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱27.2M |
| 17IC0001 | 9 yrs 8 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, EMBARKADERO BRIDGE (B00036LT) ALONG DAANG MAHARLIKA (LT), TANAUAN, LEYTEBridges | Completed | Leyte 1st DEO | ₱9.9M |
| 16CG0172 | 9 yrs 11 mo ago | REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION WORKS ALONG SAPANG BALEN, CALULUT SECTION STA. 0+000-STA.0+955, CITY OF SAN FERNANDO, PAMPANGAFlood Control and Drainage | Completed | Pampanga 1st DEO | ₱37.4M |
| 16CH0063 | 10 yrs ago | CONSTRUCTION OF SLOPE PROTECTION ALONG GUAGUA RIVER BRGY. SAN RAFAEL (DUCK ISLAND) SECTION, GUAGUA,Flood Control and Drainage | Completed | Pampanga 2nd DEO | ₱38.8M |
| 16CC0090 | 10 yrs 1 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS ALONG ANGAT RIVER BASINS POBLACION SECTION PLARIDEL, BULACANFlood Control and Drainage | Completed | Bulacan 1st DEO | ₱14.9M |
| 16CG0107 | 10 yrs 3 mo ago | IMPROVEMENT/RECONSTRUCTION OF ROADS, DRAINAGE CANAL INCL. THE COVERED WALKWAY AT DIOSDADO MACAPAGALFlood Control/Hydraulics/Drainage, Roads: Construction - PCCP | Completed | Pampanga 1st DEO | ₱24.4M |
| 16C00027 | 10 yrs 6 mo ago | ASSET PRESERVATION OF NATIONAL ROADS-REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - PRIMARY ROADS, JOSE ABAD SANTOS AVENUE (JASA), PAMPANGA 3RRoads | Completed | Region III | ₱94.7M |
| 16CH0012 | 10 yrs 7 mo ago | UPGRADING (GRAVEL TO ASPHALT) OF WESTERN MEGADIKE ALONG PASIG POTRERO RIVER GUAGUA SECTION, GUAGUA,Flood Control and Drainage | Completed | Pampanga 2nd DEO | ₱46.7M |
| 16CH0022 | 10 yrs 7 mo ago | REHABILITATION OF SAPANG LABUAN RIVER FLOOD CONTROL (PHUMP PHASE II), GUAGUA TO SASMUAN, PAMPANGAFlood Control and Drainage | Completed | Pampanga 2nd DEO | ₱46.6M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.