ADSL CONSTRUCTION & TRADING

Contractor d5c261a11270a439d213

Overview

PhilGEPS awards
₱10.68B · 191 awards
DPWH contracts
₱5.62B · 109 contracts
Rank by recorded value
#193 of 23,487

More info

First record
Mar 25, 2021 (5 yrs 7 mo ago)
Latest record
Nov 3, 2025 (1 yr ago)
DPWH contractor code
48245

Where they work

Bulacan₱3.54B
Zambales₱1.52B
Camarines Sur₱575.9M
Pampanga₱97.6M
Latest 25 from a total of 109 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
25CP00451 yr 7 mo agoFLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT PROTECTION ALONG BULO RIVER, PUROK 1, BARANGAY MALIBAY, SAN MIGUEL, BULACANGAA 2025 OO-2CompletedBulacan 3rd DEO₱72.4M
25CL01641 yr 7 mo agoCONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 1, SAN NARCISO, ZAMBALESGAA 2025 OO-2On-GoingZambales 1st DEO₱96.4M
25CL01651 yr 7 mo agoCONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 2, SAN NARCISO, ZAMBALESGAA 2025 OO-2On-GoingZambales 1st DEO₱96.4M
25CL01661 yr 7 mo agoCONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 3, SAN NARCISO, ZAMBALESGAA 2025 OO-2On-GoingZambales 1st DEO₱96.4M
25CL01671 yr 7 mo agoCONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 4, SAN NARCISO, ZAMBALESGAA 2025 OO-2On-GoingZambales 1st DEO₱96.3M
25CL01681 yr 7 mo agoCONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG STO. TOMAS RIVER (MACULCOL DIKE) NORTH APPROACH, PHASE 5, SAN NARCISO, ZAMBALESGAA 2025 OO-2On-GoingZambales 1st DEO₱96.3M
25CP00331 yr 7 mo agoFLOOD MANAGEMENT PROG. - CONST. / MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CONTROL, PUROK 3 SECTION, BARANGAY PASONG INTSIK, SAN RAFAEL, BULACANFlood Control and DrainageOn-GoingBulacan 3rd DEO₱95.0M
25CP00341 yr 7 mo agoFLOOD MANAGEMENT PROG.-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (UPSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACANFlood Control and DrainageOn-GoingBulacan 3rd DEO₱95.0M
25CP00351 yr 7 mo agoFLOOD MANAGEMENT PROG.-CONST./MAINT.OF FLOOD MITIGATION STRUCTS. AND DRAINAGE SYSTEMS - CONST. OF FLOOD MITIGATION STRUCT. INCLUDING IMPROVEMENT OF WATERWAY ALONG BALAONG RIVER CONTROL (DOWNSTREAM PHASE), BARANGAY TALBAK, DONA REMEDIOS TRINIDAD, BULACANFlood Control and DrainageOn-GoingBulacan 3rd DEO₱95.0M
25FD00411 yr 7 mo agoCLUSTER 6: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, LUPI, RAGAY AND SIPOCOT, CAMARINES SURGAA 2025 SSPOn-GoingCamarines Sur 1st DEO₱12.2M
25FD00421 yr 7 mo agoCLUSTER 7: CONSTRUCTION (COMPLETION)/CONSTRUCTION OF MULTI-PURPOSE BUILDING, CABUSAO, CAMARINES SURGAA 2025 SSPCompletedCamarines Sur 1st DEO₱11.2M
25FD00461 yr 7 mo agoCLUSTER 10: CONSTRUCTION (COMPLETION)/REHABILITATION OF MULTI-PURPOSE BUILDING, LUPI, CAMARINES SURGAA 2025 SSPCompletedCamarines Sur 1st DEO₱4.9M
25CP01001 yr 8 mo agoCONVERGE. AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA.PROJS. ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION OF STUCTS. PRTOTECTING MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF FLOOD MITIGATION STRUCT. ALONG SAN MIGUEL RIVER, SEGMENT A(SITIO MATAAS NAFlood Control and DrainageOn-GoingBulacan 3rd DEO₱95.0M
25CP01051 yr 8 mo agoCONVERGE. AND SPECIAL SUPPORT PROG.-BASIC INFRA. PROG. (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD GOING TO VERDIVIA FALLS, BARANGAY, TALBAK, DONA REMEDIOS TRINIDAD, BULACANGAA 2025 SSPOn-GoingBulacan 3rd DEO₱9.9M
24C001431 yr 8 mo agoBASIC INFRASTRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BAILEY BRIDGE,SITIO MADLUM,BARANGAY BIAK-NA-BATO, SAN MIGUEL, BULACANBridgesCompletedRegion III₱4.9M
25C003841 yr 8 mo agoFLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAASIM RIVER, SEGMENT A, PUROK 4, BARANGAY BAGONG BARRIO, SAN ILDEFONSO, BULACANFlood Control and DrainageOn-GoingBulacan 3rd DEO₱47.5M
25CP00311 yr 8 mo agoFLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CTRL.(UPSTREAM),PUROK1 SEC., BRGY. BUBULONG MUNTI,SAN ILDEFONSOGAA 2025 OO-2On-GoingBulacan 3rd DEO₱96.5M
25CP00321 yr 8 mo agoFLOOD MANAGEMENT PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION STRUCTURE INCLUDING IMPROVEMENT OF WATERWAY ALONG MAASIM RIVER CONTROL (DOWNSTREAM),PUROK 1 SECTION,BRGY. BUBULONG MUNTI,SAN ILDEFONGAA 2025 OO-2On-GoingBulacan 3rd DEO₱96.5M
25CP00361 yr 8 mo agoFLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BULO RIVER CONTROL (BACK OF BUGA E/S), DOWNSTREAM SEGMENT 1, BRGY. BUGA, SAN MIGUEL, BULACANFlood Control and DrainageOn-GoingBulacan 3rd DEO₱95.0M
25CP00381 yr 8 mo agoFLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MALANGAAN RIVER (PHASE 2), BARANGAY TUKOD, DONA REMEDIOS TRINIDAD, BULACANGAA 2025 OO-2On-GoingBulacan 3rd DEO₱38.6M
25CP00391 yr 8 mo agoFLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MALANGAAN RIVER, BARANGAY TUKOD, DONA REMEDIOS TRINIDAD, BULACANGAA 2025 OO-2On-GoingBulacan 3rd DEO₱38.6M
25CP00401 yr 8 mo agoFLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MALANGAAN RIVER, DONA REMEDIOS TRINIDAD, BULACANGAA 2025 OO-2On-GoingBulacan 3rd DEO₱38.6M
25CP00941 yr 8 mo agoCONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT.PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(UPSTREAM), BRGY. TUKOD, SAN RAFAEL, BULACANGAA 2025 SSPOn-GoingBulacan 3rd DEO₱96.5M
25CP00951 yr 8 mo agoCONVERG. AND SPL. SUPPORT PROG.-SUST. INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJ./STRAT. PUBLIC BLDGS./FACS.-CONST. OF RIVERBANK PROTECTION STRUCT. ALONG MALANGAAN RIVER(DOWNSTREAM), BRGY. TUKOD, SAN RAFEL, BULACGAA 2025 SSPOn-GoingBulacan 3rd DEO₱96.5M
24C001441 yr 8 mo agoBASIC INFRATRUCTURE PROGRAM-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BAILEY BRIDGE,BRGY. BIAK-NA-BATO,SAN MIGUEL, BULACANBridgesCompletedRegion III₱4.9M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.