NFH CONSTRUCTION & SUPPLY
Contractor d8a0017b2cf9415c92b2
Overview
PhilGEPS awards
₱21.04B · 526 awards
DPWH contracts
₱6.85B · 145 contracts
Rank by recorded value
#90 of 23,487
More info
First record
Oct 22, 2007 (19 yrs ago)
Latest record
Sep 15, 2026 (2 mos ago)
DPWH contractor code
16055
Where they work
Latest 25 from a total of 145 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 17F00002 | 9 yrs 5 mo ago | PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TERTIARY ROADS, BAGONG SILANG-CAPALONGA ROAD, LABO, CAMARINES NORTERoads | Completed | Camarines Norte DEO | ₱68.9M |
| 17F00001 | 9 yrs 6 mo ago | MFO3-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-JCT. MORNING, CATAINGAN-ESPERANZA PORT ROAD, MASBATE 3RD LD, ESPERANZA, MASBATE PROVINCERoads | Completed | Region V | ₱96.5M |
| 17F00010 | 9 yrs 6 mo ago | MFO1-NATIONAL ROAD NETWORK SERVICES, REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), SAN PASCUAL-CLAVERIA ROAD, K004+482 TO K050+780 WITHB EXC,Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP | Completed | Region V | ₱102.7M |
| 17FB0057 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL (DIKE) SALVACION, DARAGA, ALBAYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱23.3M |
| 17FJ0038 | 9 yrs 7 mo ago | CONST. OF MULTI-PURPOSE BUILDING(COVERED COURT) AT MASBATE 2ND DEO,DIMASALANG, MASBATEBuildings and Facilities | Completed | Masbate 3rd DEO | ₱7.8M |
| 17FH0003 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SAN JOAQUIN-SAN PEDRO RIVER CONTROL, PANGANIBAN, CATANDUANESFlood Control and Drainage | Completed | Catanduanes DEO | ₱39.2M |
| 16FH0093 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONST. OF DORORIAN PROTECTION WALL, DORORIAN, GIGMOTO, CATANDUANESFlood Control and Drainage | Completed | Catanduanes DEO | ₱11.8M |
| 16FH0094 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF GENITLIGAN PROTECTION WALL, GENITLIGAN, BARAS, CATANDUANESFlood Control and Drainage | Completed | Catanduanes DEO | ₱11.8M |
| 16FC0033 | 9 yrs 8 mo ago | CONCRETING OF SISIP ROAD, BRGY. ITOMANG, TALISAY,TALISAY, CAMS. NORTERoads | Completed | Camarines Norte DEO | ₱4.7M |
| 17FG0024 | 9 yrs 8 mo ago | INDV. PROJ. PREVENTIVE MAINTENANCE ALONG IRIGA CITY-MASOLI ROAD, IRIGA CITY AND BATO, CAMARINES SURK0 474+185-K0 475+217, K0 477+000-K0 477+847, K0 481+839-K0 482+509Roads | Completed | Camarines Sur 5th DEO | ₱28.7M |
| 17FB0040 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF PUROK 6 FLOOD CONTROL SYSTEM, BRGY. LIBOD, CAMALIG, ALBAYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱27.4M |
| 17FB0029 | 9 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LOWER MALABOG FLOOD CONTROL SYSTEM, BRGY. MALABOG, DARAGA, ALBAY 2ND LDFlood Control and Drainage | Completed | Albay 2nd DEO | ₱38.1M |
| 16F00081 | 9 yrs 9 mo ago | MFO1-NATIONAL ROAD SERVICE ASSET PRESERVATION OF NATIONAL ROADS,PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANAGEMENT (HDM-4)DAANG MAHARLIKA(LZ) DARAGA, ALBAYRoads | Completed | Region V | ₱24.9M |
| 16FJ0025 | 9 yrs 10 mo ago | RETROFITTING/STRENTHENING OF PERMANENT BRIDGES, PINANGAPUGAN BR.(B00068MT) ALONG MASBATE-CATAINGAN-PBridges | Completed | Masbate 3rd DEO | ₱11.0M |
| 16FB0075 | 10 yrs 1 mo ago | LIP - CONSTRUCTION OF DEL ROSARIO - ALOBO ROAD, DARAGA, ALBAYFlood Control/Hydraulics/Drainage, Roads: Construction - PCCP | Completed | Albay 2nd DEO | ₱17.1M |
| 16FJ0027 | 10 yrs 1 mo ago | CONST. AND MAINTENANCE OF BRIDGES ALONG NATL. ROADS, REPLACEMENT OF PERM. WEAK BRIDGES, ALIMANGO BR.Bridges | Completed | Masbate 3rd DEO | ₱16.8M |
| 16F00046 | 10 yrs 2 mo ago | CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS - JCT. MORNING, CATAINGAN-ESPERANZA PORT ROAD, PIO V. CORPUZ AND ESPERANZA, MASBATE 3RD LDRoads | Completed | Region V | ₱202.4M |
| 16FH0041 | 10 yrs 2 mo ago | ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR ROAD UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS), BARAS-GIGMOTO-VIGA ROAD, K0079+336-K0079+493, K0084+730-K0084+820, K0084+852-K0085+309Roads | Completed | Catanduanes DEO | ₱17.5M |
| 16FH0068 | 10 yrs 2 mo ago | CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, CONSTRUCTION OF PERMANENT BRIDGES, STA. TERESA BRIDGE ALONG CATANDUANES CIRCUMFERENTIAL ROAD S00015CN K0060+700, BAGAMANOC, CATANDUANESBridges | Completed | Catanduanes DEO | ₱29.4M |
| 16FE0079 | 10 yrs 2 mo ago | CONCRETING OF TAGBONG FARM TO MARKET ROAD, BRGY. TAGBONG PILI, CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | ₱3.8M |
| 16FE0083 | 10 yrs 2 mo ago | CONCRETING OF SABANG FARM TO MARKET ROAD, BRGY. SABANG, CALABANGA, CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | ₱1.9M |
| 16FN0049 | 10 yrs 2 mo ago | CLUSTER: CONSTRUCTION OF TWO (2) STOREY, SIX (6), TEN (10) AND FOUR (4) CLASSROOM SCHOOL BUILDING AT RAGAY, CAMARINES SURBuildings and Facilities | Completed | Camarines Sur 1st DEO | ₱36.5M |
| 16FD0036 | 10 yrs 2 mo ago | CONSTRUCTION OF CONSTRUCTION (BATCH 9) AT A.BAGAMELON ES, LIBMANAN, CS AND B)SAN ANTONIO ES, MINALABAC, CSBuildings and Facilities | Completed | Camarines Sur 2nd DEO | ₱4.1M |
| 16F00044 | 10 yrs 3 mo ago | CONST./IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ROAD UPGRADING (GRAVEL TO CONCRETE) OF SAN JUAN-ALAS-TAGPU-DAYAO ROAD LEADING TO MANDAON ECOTOURISM SITES, MANDAON, MASBATE PROVINCERoads | Completed | Region V | ₱144.7M |
| 16F00048 | 10 yrs 3 mo ago | ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) STA. ELENA - CAPALONGA BY PASS COASTAL ROAD, KO283+040 - KO292+200 WITH EXCEPTIONS, CAMARINES NORTEFlood Control/Hydraulics/Drainage, Roads: Construction - PCCP | Completed | Region V | ₱142.9M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.