ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP.
Contractor e44d9e53c558df496daa
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱6.84B · 116 contracts
Rank by recorded value
#505 of 23,487
More info
First record
Apr 28, 2021 (5 yrs 6 mo ago)
Latest record
May 26, 2025 (1 yr 5 mo ago)
DPWH contractor code
49128
Where they work
Latest 25 from a total of 116 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 24OB0258 | 2 yrs 7 mo ago | BANK IMPROVEMENT OF SLOPE PROTECTION ALONG PASIG-MARIKINA RIVER, PASIG CITY (PACKAGE 1)Flood Control and Drainage | Completed | Metro Manila 1st DEO | ₱48.0M |
| 24OB0259 | 2 yrs 7 mo ago | BANK IMPROVEMENT OF SLOPE PROTECTION ALONG PASIG-MARIKINA RIVER, PASIG CITY (PACKAGE 2)Flood Control and Drainage | Completed | Metro Manila 1st DEO | ₱48.0M |
| 24O00039 | 2 yrs 7 mo ago | CONSTRUCTION OF NATIONAL TOBACCO ADMINISTRATION BUILDING, QUEZON CITY (PHASE 3) (RE-ADVERTISEMENT)GAA 2024 LP | On-Going | National Capital Region | ₱141.5M |
| 24KA0155 | 2 yrs 7 mo ago | REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), BARANGAY POBLACION,CABANGLASAN, BUKIDNON CABANGLASAN, BUKIDNON 2ND LDGAA 2024 SSP | Terminated | Bukidnon 1st DEO | ₱6.6M |
| 24KA0156 | 2 yrs 7 mo ago | REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL GYM), BARANGAY POBLACION,CABANGLASAN, BUKIDNONCABANGLASAN, BUKIDNON 2ND LDBuildings and Facilities | Completed | Bukidnon 1st DEO | ₱6.9M |
| 24OH0049 | 2 yrs 7 mo ago | OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION AT BASECO COMPOUND, PORT AREA, BRGY. 649, ZONE 68, MANILA, PHASE 3,STA 0+398 TO SFlood Control and Drainage | Completed | South Manila DEO | ₱96.4M |
| 24DI0016 | 2 yrs 8 mo ago | CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG MALITLIT, WATERWAYS (NEAR ETON GREENFIELD PARKWAY BRIDGE), SANTA ROSA CITY, LAGUNAGAA 2024 OO-2 | Completed | Laguna 2nd DEO | ₱94.1M |
| 24HL0036 | 2 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF BAYAWAN RIVER CONTROL,Flood Control and Drainage | Completed | Negros Oriental 3rd DEO | ₱45.1M |
| 24E00039 | 2 yrs 8 mo ago | FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF ROAD DIKE ALONG MAG-ASAWANG TUBIG RIVER, SITIO DIKE, BRGY. APITONG SECTION, NAUJAN, ORIENTAL MINDOROGAA 2024 OO-2 | Completed | MIMAROPA Region | ₱193.0M |
| 24E00150 | 2 yrs 8 mo ago | SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG BUSUANGA RIVER, BRGY. SAN PEDRO (DOWNSTREAM), SAN JOSE, OCGAA 2024 SSP | On-Going | MIMAROPA Region | ₱232.4M |
| 24I00043 | 2 yrs 8 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAFT RIVER, BARANGAY MALINAO, TAFT, EASTERN SAMARFlood Control and Drainage | On-Going | Region VIII | ₱188.5M |
| 24E00053 | 2 yrs 8 mo ago | BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOODMITIGATION STUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACLITIES- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER (EAST SIDE), SITIO MALINAO SECTION, BRGY. TAGUMPAY, NAUJAN, OR. MINDOROGAA 2024 SSP | Completed | MIMAROPA Region | ₱247.5M |
| 24HM0014 | 2 yrs 8 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE PHASE III AT DATAG RIVER (DOFlood Control and Drainage | Completed | Siquijor DEO | ₱96.5M |
| 24D00149 | 2 yrs 8 mo ago | FY 2024 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS UNISAN DIVERSION ROAD, PACKAGE 4, QUEZONGAA 2024 OO-1 | On-Going | Region IV-A | ₱189.1M |
| 24D00150 | 2 yrs 8 mo ago | FY 2024 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS/ NEW ROADSSAN FRANCISCO - SAN ANDRES - SAN NARCISO ROAD, PACKAGE 8,QUEZONRoads | On-Going | Region IV-A | ₱47.3M |
| 24A00226 | 2 yrs 8 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SABO DAM ALONG BONGO RIVER, NUEVA ERA, ILOCOS NORTEGAA 2024 OO-2 | Completed | Region I | ₱106.1M |
| 24DI0072 | 2 yrs 8 mo ago | CONSTRUCTION OF SHORE PROTECTION (NEAR BAY) AT SAN PEDRO CITY, LAGUNA (PHASE 1)Flood Control and Drainage | On-Going | Laguna 2nd DEO | ₱84.6M |
| 24CL0060 | 2 yrs 8 mo ago | CONSTRUCTION OF MALOMA RIVER FLOOD CONTROL STRUCTURE, DOWNSTREAM, PACKAGE 3, SAN FELIPE, ZAMBALESFlood Control and Drainage | Completed | Zambales 1st DEO | ₱96.5M |
| 24OA0039 | 2 yrs 8 mo ago | CONSTRUCTION OF MUZON RIVERWALL (PHASE 6), BARANGAY MUZON, MALABON CITYFlood Control and Drainage | Completed | Malabon-Navotas DEO | ₱45.3M |
| 24OA0043 | 2 yrs 8 mo ago | CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MUZON AND DAMPALIT RIVER (PHASE 6), MALABON CITYFlood Control and Drainage | Completed | Malabon-Navotas DEO | ₱59.4M |
| 24OH0041 | 2 yrs 8 mo ago | OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGMT.PROGRAM-CONST./MAINT.OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST.OF DRAINAGE SYSTEM ALONG LIBERTAD MAIN (FROM ROXAS BLVD. TO TAFT AVE., PASAY CITY,STA.0+483 TO STA.0+644),PHASE 6Flood Control and Drainage | Completed | South Manila DEO | ₱89.1M |
| 24CK0047 | 2 yrs 8 mo ago | REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER (PALUDPUD SECTION, RIGHT BANK), PACKAGE H, LA PAZ, TARLACGAA 2024 OO-2 | Terminated | Tarlac 2nd DEO | ₱53.5M |
| 24CK0052 | 2 yrs 8 mo ago | REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER, PACKAGE G, (MATAYUMTAYUM SECTION, RIGHT BANK), LA PAZ, TARLACGAA 2024 OO-2 | Terminated | Tarlac 2nd DEO | ₱48.6M |
| 24HL0012 | 2 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF TIABANAN RIVER CONTROLFlood Control and Drainage | Completed | Negros Oriental 3rd DEO | ₱45.1M |
| 24HL0015 | 2 yrs 8 mo ago | ORGANIZATIONAL OUTCOME 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF RIVER CONTROL ALONG UPSTREAM A OF BANGCOLOTAN RIVERFlood Control and Drainage | Completed | Negros Oriental 3rd DEO | ₱45.1M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.