DPWH Flood Control Management Cluster
DPWH implementing office 5d1fe56eccff795dad1b
Overview
DPWH contracts
192
Total listed value
₱45.39B
Distinct contractors
76
More info
Level
DPWH office
Location
Not stated
Records span
May 10, 2016 – Mar 14, 2024
Largest contractors
The largest contractor holds 9.8% of this office's listed value.
Latest 25 from a total of 192 records
| Contract ID | Start | Description | Status | Contractor | Amount |
|---|---|---|---|---|---|
| 16C00034 | 10 yrs 1 mo ago | FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, TARLAC AND NUEVA ECIJAFlood Control and Drainage | Completed | NORTHERN BUILDERS | ₱284.2M |
| 15OB0471 | 10 yrs 4 mo ago | PMRCIP,PHASE V CONTRACT PACKAGE 10-1, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER, STATION 0+500 TO STATION 0+757Flood Control and Drainage | Completed | J.D. LEGASPI CONSTRUCTION | ₱151.0M |
| 16C00022 | 10 yrs 4 mo ago | FLOOD CONTROL WORKS IN PORAC-GUMAIN, SAN FERNANDO RIVER, LUBAO, SASMUAN, GUAGUA AND CITY OF SAN FERNANDO, PAMPANGAFlood Control and Drainage | Completed | AKN CONSTRUCTION CORPORATION | ₱163.9M |
| 16C00020 | 10 yrs 4 mo ago | FLOOD CONTROL WORKS - REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED PAMPANGA RIVER BANK INCLUDING CANDABA CUT-OFF CHANNEL, PAMPANGA AND NUEVA ECIJAGAA 2016 MFO-2 | Completed | EDDMARI CONSTRUCTION & TRADING (20301) / TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | ₱237.1M |
| 16C00021 | 10 yrs 4 mo ago | DIKING WITH SLOPE PROTECTION, SACOBIA-BAMBAN RIVER, PAMPANGA AND TARLACGAA 2016 MFO-2 | Completed | 11-16 CONSTRUCTION (29646) / D.L CERVANTES CONSTRUCTION CORPORATION (FORMERLY: | ₱173.6M |
| 16O00023 | 10 yrs 6 mo ago | UPPER MARIKINA RIVER IMPV'T./REVETMENT WALL,MARIKINA CITY 1ST LD (CONTRACT PACKAGE 3) RIVER IMPV'T.GAA 2016 MFO-2 | Completed | E.M. CUERPO, INC. (30963) / MSB VITUG CONSTRUCTION INC. (FORMERLY MSB VITUG CONSTRUCTION) | ₱256.8M |
| 24Z00003 | — | RIVER IMPROVEMENT AT PASIG-MARIKINA RIVER ALONG BRGY. BAGONG ILOG TO BRGY. CANIOGAN, PASIG CITYFlood Control and Drainage | For Procurement | — | ₱0 |
| 24Z00004 | — | REPAIR/REHABILITATION OF REVETMENT WALL ALONG IMUS RIVER (PHASE 2) AT BRGY. BUHAY NA TUBIG, IMUS, CAVITE (RE-ADVERTISEMENT)Flood Control and Drainage | For Procurement | — | ₱0 |
| 24Z00005 | — | IMPROVEMENT OF MANGAHAN FLOODWAY CHANNEL INCLUDING PROVISION OF FLOODGATE AT BULI OUTFALL ALONG MANGAHAN FLOODWAY CHANNEL, BRGY. STA. LUCIA, PASIG CITYFlood Control and Drainage | For Procurement | — | ₱0 |
| 24Z00006 | — | REPAIR/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BRGY. MALIWALU, BACOLOR, PAMPANGAFlood Control and Drainage | For Procurement | — | ₱0 |
| 24Z00007 | — | REPAIR/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BRGY. MANIANGO, MINALIN, PAMPANGAFlood Control and Drainage | For Procurement | — | ₱0 |
| 24Z00008 | — | REPAIR/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BRGY. CONSUELO, MACABEBE, PAMPANGAFlood Control and Drainage | For Procurement | — | ₱0 |
| 24Z00022 | — | ABRA RIVER BASIN (PACKAGE 1) - REINFORCEMENT AND REPAIR OF EXISTING STRUCTURES, ABRA UNDER INTEGRATED FLOOD RESILIENCE AND ADAPTATION 1 (INFRA 1) PROJECTFlood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | For Procurement | — | ₱0 |
| 24Z00023 | — | ABRA RIVER BASIN (PACKAGE 2) - REINFORCEMENT AND REPAIR OF EXISTING STRUCTURES, ABRA, UNDER THE INTEGRATED FLOOD RESILIENCE AND ADAPTATION 1 (INFRA 1) PROJECTFlood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | For Procurement | — | ₱0 |
| 24Z00026 | — | TAGUM LIBUGANON RIVER BASIN FLOOD CONTROL INFRASTRUCTURES, CARMEN AND TAGUM CITY, DAVAO DEL NORTE, UNDER INTEGRATED FLOOR RESILIENCE AND ADAPTATION 1 (INFRA) PROJECT, ADB LOAN NO. 4345-PHIFlood Control: Construction - Channel Excavation | For Procurement | — | ₱0 |
| 25Z00012 | — | REPAIR/REHABILITATION OF NAVOTAS COASTAL DIKE INCLUDING COASTAL RAMP, NAVOTAS CITYFlood Control: Construction - Bank Protection Structure | For Procurement | — | ₱0 |
| 26Z00001 | — | METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, IMPROVEMENT OF PUMPING STATION FACILITIES - ULI-ULI PUMPING STATION, QUIAPO PUMPING STATION AND PANDACAN PUMPING STATION (COMPLETION OF REMAINING WORKS FOR CONTRACT ID NOS. 23Z00038, 23Z00039 AND 23Z00043)Buildings: Repair | For Procurement | — | ₱0 |