E.F. CHUA CONSTRUCTION, INC.
Contractor 2096d748601be7c67e39
Overview
PhilGEPS awards
₱17.70B · 249 awards
DPWH contracts
₱13.88B · 212 contracts
Rank by recorded value
#67 of 23,487
More info
First record
Dec 22, 2014 (11 yrs 10 mo ago)
Latest record
Jul 31, 2025 (1 yr 3 mo ago)
DPWH contractor code
37826
Where they work
Latest 25 from a total of 212 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25D00229 | 1 yr 3 mo ago | CONSTRUCTION OF BRIDGE 2 AT BYPASS/ALTERNATE/DIVERSION ROAD-MUNTINLUPA-CAVITE EXPRESSWAY TO DAANG HARI ROAD, BACOOR, CAVITEGAA 2025 SSP | On-Going | Region IV-A | ₱96.5M |
| 25D00282 | 1 yr 3 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT MOLINO RIVER AT BARANGAYS MOLINO 6 TO SAN NICOLAS 1, BACOOR CITY, CAVITEGAA 2025 SSP | On-Going | Region IV-A | ₱14.6M |
| 25D00196 | 1 yr 3 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY PALICO, IMUS, CAVITEGAA 2025 SSP | On-Going | Region IV-A | ₱48.5M |
| 25D00269 | 1 yr 3 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT ZAPOTE RIVER AT BARANGAY MOLINO 4, BACOOR CITY, CAVITEGAA 2025 SSP | On-Going | Region IV-A | ₱38.8M |
| 25D00279 | 1 yr 3 mo ago | CONSTRUCTION OF ROAD CONNECTING DAANG HARI AND MOLINO-PALIPARAN IN BACOOR, CAVITEGAA 2025 SSP | On-Going | Region IV-A | ₱48.5M |
| 25D00283 | 1 yr 3 mo ago | CONSTRUCTION OF ROAD CONNECTING DAANG REYNA AND MOLINO PALIPARAN IN BACOOR, CAVITEGAA 2025 SSP | On-Going | Region IV-A | ₱14.5M |
| 25D00285 | 1 yr 3 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT BARANGAY MOLINO 7, BACOOR CITY, CAVITEGAA 2025 SSP | On-Going | Region IV-A | ₱38.8M |
| 25OC0113 | 1 yr 3 mo ago | REHABILITATION OF DRAINAGE STRUCTURE ALONG CHINO ROCES AVENUE (INCLUDING SIDEWALK AND DRIVEWAY)(PHASE 2), DISTRICT I,MAKATI CITY, METRO MANILAGAA 2025 SSP | On-Going | Metro Manila 2nd DEO | ₱58.2M |
| 25OC0130 | 1 yr 3 mo ago | REHABILITATION OF C5 EXTENSION, MULTINATIONAL SECTION, PARAÑAQUE CITY, METRO MANILAGAA 2025 SSP | On-Going | Metro Manila 2nd DEO | ₱65.8M |
| 25OC0131 | 1 yr 3 mo ago | CONSTRUCTION OF ROAD AT DON GALO PARAÑAQUE CITY, METRO MANILAGAA 2025 SSP | Completed | Metro Manila 2nd DEO | ₱19.4M |
| 25OC0132 | 1 yr 3 mo ago | REHABILITATION OF C-5 EXTENSION ROAD IN PARAÑAQUE CITY, PARAÑAQUE CITY, METRO MANILAGAA 2025 SSP | On-Going | Metro Manila 2nd DEO | ₱27.2M |
| 25D00209 | 1 yr 4 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURES AND OTHER IMPROVEMENTS AT BARANGAYS SAN ISIDRO NORTE, SANTA MARIA, AND SAN VICENTE IN STO. TOMAS, BATANGASGAA 2025 SSP | On-Going | Region IV-A | ₱388.1M |
| 25O00107 | 1 yr 5 mo ago | REHABILITATION AND IMPROVEMENT OF RETARDING POND AT TAPAYAN PUMPING STATION AND TRIBUTARIES, PASIG CITYGAA 2025 OO-2 | On-Going | National Capital Region | ₱189.1M |
| 25O00113 | 1 yr 5 mo ago | CONSTRUCTION OF SAN ANDRES PUMPING STATION, MANILA (PHASE 2)GAA 2025 SSP | On-Going | National Capital Region | ₱376.8M |
| 25OC0176 | 1 yr 5 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- BUENDIA FLYOVER (B00562LZ) ALONG SOUTH SUPER H-WAY (BUENDIA FLYOVER),MAKATI CITY, METRO MANILAGAA 2025 LS Itemization | On-Going | Metro Manila 2nd DEO | ₱94.6M |
| 25OH0122 | 1 yr 6 mo ago | CONSTRUCTION OF CUTCUT PUMPING STATION, PASAY CITY (PHASE 1)GAA 2025 SSP | On-Going | South Manila DEO | ₱283.3M |
| 25OI0074 | 1 yr 7 mo ago | CONSTRUCTION OF SLOPE PROTECTION / FLOOD CONTROL STRUCTURES AT BARANGAY TALON 2, LAS PINAS CITYFlood Control and Drainage | On-Going | Las Piñas-Muntinlupa DEO | ₱101.9M |
| 25OI0102 | 1 yr 7 mo ago | CONSTRUCTION OF ROAD CONNECTING DAANG REYNA AND MOLINO PALIPARAN, ALMANZA DOS, LAS PINASRoads | On-Going | Las Piñas-Muntinlupa DEO | ₱4.8M |
| 25O00012 | 1 yr 7 mo ago | REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - EDSA-KALAYAAN- FORT BONIFACIO FLYOVER BR. (RAMP 2) (B04313LZ) ALONG EDSA-KALAYAAN-FORT BONIFACIO FLYOVERBridges | On-Going | National Capital Region | ₱9.5M |
| 25O00013 | 1 yr 7 mo ago | REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - EDSA-KALAYAAN-FORT BONIFACIO FLOVER BR. (RAMP 1) (B04315LZ) ALONG EDSA-KALAYAAN-FORT BONIFACIO FLYOVERGAA 2025 OO-1 | On-Going | National Capital Region | ₱7.6M |
| 25OI0073 | 1 yr 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BALIHATAR-MARULAS CREEK, LAS PINAS CITYGAA 2025 OO-2 | On-Going | Las Piñas-Muntinlupa DEO | ₱47.3M |
| 25OI0079 | 1 yr 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ZAPOTE RIVER UPSTREAM AND ITS TRIBUTARIES, LAS PINAS CITYGAA 2025 OO-2 | On-Going | Las Piñas-Muntinlupa DEO | ₱98.6M |
| 25OI0087 | 1 yr 7 mo ago | CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PASONG COBRA - ALMIRANTE CREEK, LAS PINAS CITYFlood Control and Drainage | On-Going | Las Piñas-Muntinlupa DEO | ₱28.4M |
| 25O00011 | 1 yr 8 mo ago | REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MAGALLANES FLYOVER NB (PASAY-CUBAO) (B03218LZ) ALONG EPIFANIO DELOS SANTOS AVE (EDSA)Bridges | On-Going | National Capital Region | ₱18.9M |
| 25OI0001 | 1 yr 8 mo ago | RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, ZAPOTE FLY-OVER (B01764LZ) ALONG ZAPOTE-ALABANG FLY-OVER, LAS PINAS CITYBridges | On-Going | Las Piñas-Muntinlupa DEO | ₱62.1M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.