Skip to content
FY2026 GAA: ₱6.79T
PisoScan

3DIAMONDS CONSTRUCTION CORPORATION

Contractor 445b699372fb26a3c543

Overview

PhilGEPS awards
₱11.10B · 181 awards
DPWH contracts
₱3.11B · 65 contracts
Rank by recorded value
#228 of 23,487

More info

First record
Oct 16, 2012 (14 yrs ago)
Latest record
Jul 31, 2025 (1 yr 3 mo ago)
DPWH contractor code
35457

Where they work

Albay₱14.06B
Sorsogon₱146.1M
Latest 25 from a total of 65 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
25FO00771 yr 3 mo agoCONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION RIVERBANK CONTROL STRUCTURE ALONGAA 2025 SSPOn-GoingAlbay 3rd DEO₱94.1M
25FA00261 yr 4 mo agoPREVENTIVE MAINTENANCE-SECONDARY ROADS:DAANG MAHARLIKA JCT-LEGAZPI-STO. DOMINGO-TABACO-CAM. SUR BDRY. ROAD K0561+022-K0561+552GAA 2025 OO-1On-GoingAlbay 1st DEO₱42.6M
25F000501 yr 5 mo agoORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0505+419-K0505+600, K0509+704-K0510+912, GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT)GAA 2025 OO-1On-GoingRegion V₱102.8M
25F000931 yr 5 mo agoORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0493+200-K0493+779, POLANGUI, ALBAY (3RD LEGISLATIVE DISTRICT)GAA 2025 OO-1On-GoingRegion V₱41.8M
25FO00571 yr 7 mo agoORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAMARINES SUR - ALBAY DIVERSION ROAD, PACKAGE 1, ALBAYRoadsOn-GoingAlbay 3rd DEO₱70.5M
25FO00361 yr 7 mo agoORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT PAULBA, LIGAO CITY, ALBAYGAA 2025 OO-2On-GoingAlbay 3rd DEO₱47.0M
25FO00261 yr 8 mo agoORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD MITIGATION RIVERBANK CONTROL STRUCTURE ALONG QUGAA 2025 OO-2On-GoingAlbay 3rd DEO₱89.3M
24FO01102 yrs 2 mo agoCONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BARANGAY NABONTON, LIGAO CITY, ALBAYGAA 2024 SSPOn-GoingAlbay 3rd DEO₱99.0M
24FB01922 yrs 2 mo agoCONCRETING OF BRGY. TALADONG TO BRGY. TAGOYTOY FMR, BRGY. TALADONG, CAMALIG ALBAYRoadsOn-GoingAlbay 2nd DEO₱14.5M
24F002952 yrs 3 mo agoORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SAN RAFAEL RIVER CONTROL, SAN RAFAEL, GUINOBATAN, ALBAY, GUFlood Control and DrainageCompletedRegion V₱72.4M
24FO00792 yrs 5 mo agoCONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM(BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURES, BRGY. MAGUIRON AND BRGY. MFlood Control and DrainageOn-GoingAlbay 3rd DEO₱99.0M
24FO00632 yrs 6 mo agoORGANIZATONAL OUTCOME 2 -PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES IN MINTO, GUINOBATAN, ALBAGAA 2024 OO-2On-GoingAlbay 3rd DEO₱48.3M
24FO00122 yrs 8 mo agoORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAMARINES SUR - ALBAY DIVERSION ROAD, PACKAGE 5, ALBAYGAA 2024 OO-1On-GoingAlbay 3rd DEO₱56.3M
23F001703 yrs 1 mo agoORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT/REHABILITATION OF NASISI RIVER FLOOD MITIGATION STRUFlood Control and DrainageCompletedRegion V₱115.8M
23F000313 yrs 1 mo agoORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-LEGAZPI CITY COASTAL ROAD, ACCESS ROAD, ALBAY, LEGAZPI CITY, ALBAY (2ND LEGISLATIVE DISTRICT)RoadsCompletedRegion V₱62.0M
23FO00263 yrs 3 mo agoCLUSTER VI - FY 2023: (1) CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE (BRGY. GUILID), LIGAO CITY, ALBAY; (2) REHABILITATION OF MULADBUCAD FLOOD CONTROL PHASE II, GUINOBATAN, ALBAYFlood Control and DrainageOn-GoingAlbay 3rd DEO₱84.2M
23F000883 yrs 4 mo agoCONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION(TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-POLANGUI-ALBAY WEST COAST ROAD LEADING TO BEACHES, ALBAY, ALBAY 3RD LEGISLATIVE DISTRICTRoadsCompletedRegion V₱14.5M
23FB00663 yrs 4 mo agoSIPAG: FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE AND DRAINAGE SYSTEM TRIBUTARIES TO YAWA RIVER (BUDIAO - MIISI SECTION) PHASE 3, DARAGA, ALBAYFlood Control and DrainageCompletedAlbay 2nd DEO₱48.2M
23FB00543 yrs 7 mo agoSIPAG: CONSTRUCTION OF COMUN-COTMON-DEL ROSARIO-KINAWITAN ROAD PHASE 2, CAMALIG, ALBAYRoadsOn-GoingAlbay 2nd DEO₱65.2M
23FO00053 yrs 7 mo agoCONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG NASISI RIVER (DOWNSTREAM OF TOBGON BRIDGE) PHASE II, BARANGAY NASISI AND BARANGAY BATANG, LIGAO CITY, ALBAYFlood Control and DrainageOn-GoingAlbay 3rd DEO₱69.8M
22FA00614 yrs 2 mo agoCLUSTER 20- CONST. OF RIVER BANK PROTECTION ALONG BACLAYON RIVER (PHASE 1) & (PHASE 2) LABANON SECTION, BRGY. BASUD, BACACAY, ALBAYFlood Control and DrainageCompletedAlbay 1st DEO₱34.3M
22FO00274 yrs 2 mo agoCONSTRUCTION OF FLOOD CONTROL/RIVER DIKE, BARANGAY PANDAN, LIGAO CITY, ALBAYFlood Control and DrainageCompletedAlbay 3rd DEO₱39.1M
22FA00104 yrs 3 mo agoCONST. OF SOA (UPSTREAM) RIVER CONTROL, MALINAO, ALBAYFlood Control and DrainageCompletedAlbay 1st DEO₱49.0M
22FA00454 yrs 3 mo agoCLUSTER 5-CONST. OF FLOOD CONTROL AT BRGY. CALBAYOG AND SAN ROQUE, MALILIPOT, ALBAY; AND CONST. OF DRAINAGE STRUCTURE AT BRGY. I & III-POB, MALILIPOT, ALBAYFlood Control and DrainageCompletedAlbay 1st DEO₱53.9M
22FO00364 yrs 5 mo agoCONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE (BRGY. PINIT), LIGAO CITY, ALBAYFlood Control and DrainageOn-GoingAlbay 3rd DEO₱56.0M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.