Skip to content
FY2026 GAA: ₱6.79T
PisoScan

JOMARCANN GENERAL CONSTRUCTION

Contractor 768c5fe0968708324afd

Overview

PhilGEPS awards
₱6.90B · 104 awards
DPWH contracts
₱901.6M · 23 contracts
Rank by recorded value
#445 of 23,487

More info

First record
Jul 11, 2007 (19 yrs 4 mo ago)
Latest record
Apr 29, 2026 (6 mos ago)
DPWH contractor code
30599

Where they work

Ilocos Sur₱3.83B
Benguet₱2.21B
Apayao₱611.0M
Pangasinan₱138.3M
La Union₱45.4M
Latest 23 from a total of 23 DPWH contracts
Contract IDStartDescriptionStatusOfficeAmount
25P000266 mos agoCONSTRUCTION OF NATIONAL BUREAU OF INVESTIGATION (NBI) - CORDILLERA ADMINISTRATIVE REGION (NBI-CAR) OFFICE BUILDING, PHASE I, UPPER SESSION ROAD, BAGUIO CITYGAA 2025 LFPOn-GoingCordillera Administrative Region₱47.9M
25PB00291 yr 7 mo agoCONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MATALAG (DOWNSTREAM) FLOOD MITIGATION STRUCTURES, STA.33+288-STA.34+248Flood Control and DrainageOn-GoingApayao 1st DEO₱82.0M
24PB00312 yrs 7 mo agoCONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG), SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCTGAA 2024 SSPOn-GoingApayao 1st DEO₱96.7M
19PF00187 yrs 3 mo agoORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS BAGUIO-BONTOC ROAD, K0269+240-K0269+270, K0282+850-K028RoadsCompletedBenguet 2nd DEO₱70.3M
19PF00217 yrs 3 mo agoORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, BAGUIO-BONTOC ROAD, K0300+867-K0300+918RoadsCompletedBenguet 2nd DEO₱57.8M
19PD00057 yrs 5 mo agoCONSTRUCTION OF CONCRETE ROAD-ROAD AT FORT DEL PILAR, CAMP ALLEN AND NAVY BASE, BAGUIO CITY, BENGUETRoadsCompletedBaguio City DEO₱39.2M
18PD01337 yrs 10 mo agoDRERF-FLOOD CONTROL AND DRAINAGE-DRAINAGE/PROTECTION WORKS: RESTORATION OF VARIOUS PROJECTS IN BAGUIO, DAMAGED BY TY OMPONG-RESTORATION OF COLLAPSED RIPRAP AND ROADSLIP ALONG LOAKAN ROAD, KO250+160-KO252+280RoadsCompletedBaguio City DEO₱5.5M
18PF00148 yrs 8 mo agoASSET PRESERVATION OF DAMAGED PAVED NATIONAL ROADS - PREVENTIVE MAINTENANCE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0275+320 - K0276+102, K0281+350 - K0281+550, K0288+000 - K0288+353RoadsCompletedBenguet 2nd DEO₱23.8M
18PD00068 yrs 8 mo agoNETWORK DEVELOPMENT-ROAD WIDENING: MILITARY CUT-OFF RD. , KO249+(-500)-KO249+(-233)RoadsCompletedBaguio City DEO₱19.4M
17PD01468 yrs 10 mo agoCY-2017 TVL AND OTHER LABORATORY WORKSHOP BUILDING FOR SHS-CONSTRUCTION OF 4 STOREY-2 REGULAR WORKSHOP, 2 SCIENCE LABORATORY, 2 ICT LABORATORY & 4 CLASSROOMS, STO. TOMAS NATIONAL HIGH SCHOOLBuildings and FacilitiesCompletedBaguio City DEO₱38.7M
17PD00798 yrs 10 mo agoCOMPLETION OF SCHOOL BUILDINGS UNDER THE DEPARTMENT OF EDUCATION'S CY 2017 BASIC EDUCATIONAL FACILITIES FUND (BEFF-BATCH 3), 4 STY 20CL SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAINBuildings and FacilitiesCompletedBaguio City DEO₱1.9M
17PD01478 yrs 11 mo agoCY-2017 TVL AND OTHER LABORATORY WORKSHOP BUILDING FOR SHS-CONST. OF 4 STOREY-4 REGULAR WORKSHOP, 2 SCIENCE LABORATORY & 2 ICT LABORATORY, BAGUIO CITY NATIONAL SCIENCE HIGH SCHOOL (SENIOR HIGH SCHOOL-STAND ALONE)Buildings and FacilitiesCompletedBaguio City DEO₱39.2M
17PF00019 yrs 7 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF TUBLAY CENTRAL FLOOD CONTROLFlood Control and DrainageCompletedBenguet 2nd DEO₱19.6M
17PF00049 yrs 7 mo agoCONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF GUINAOANG FLOOD CONTROLFlood Control and DrainageCompletedBenguet 2nd DEO₱19.2M
17PD00089 yrs 8 mo agoNETWORK DEVELOPMENT -CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW, MARCOS HIGHWAY TO QUIRINO HIGHWAY (BAGUIO-BAUANG ROAD) BY-PASS ROAD, BAGUIO CITYRoadsCompletedBaguio City DEO₱47.9M
16PD00099 yrs 11 mo agoCY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF) - CONSTRUCTION OF 4-STOREY 20 CLASSROOM SENIOR HIGH SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAINBuildings/Industrial Plant-LOW rise, Maintenance BuildingsCompletedBaguio City DEO₱31.9M
16PD003110 yrs 2 mo agoNETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG MARCOS HIGHWAY KO280+(-040)-KO280+480; KO281+130-KO281+195; KO282+815-KO283+008RoadsCompletedBaguio City DEO₱29.0M
16PD001010 yrs 5 mo agoCY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONSTRUCTION OF 4-STOREY 12 CLASSROOM SENIOR HIGH SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAINBuildings and FacilitiesCompletedBaguio City DEO₱22.2M
15AI043110 yrs 8 mo agoCONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM-IMPVT OF BUED RIVER COURSE & DIKE W/ PRFlood Control/Hydraulics/River Control, Roads: Construction - GravelCompletedPangasinan 3rd DEO₱42.0M
15AI043710 yrs 8 mo agoCONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-AGNO RIVER BASIN & ALLIED RIVERS FLOODFlood Control and DrainageCompletedPangasinan 3rd DEO₱28.4M
15PD004910 yrs 9 mo agoCONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES/DRAINAGE SYSTEM ALONG CITY CAMP LAGOON FLOOD CONTROL, CITY CAMP LAGOON, BAGUIO CITYFlood Control/Hydraulics/Drainage, Flood Control/Hydraulics/River Control, Maintenance Flood ControlCompletedBaguio City DEO₱47.0M
15PD003410 yrs 9 mo agoCONST/MAINT OF FL MITIGATION STRUCT AND DRAIN SYST 3. CONST/REH. OF FLOOD MITIGATION ALONG BUED RIVER, BC, LDFlood Control/Hydraulics/Drainage, Flood Control/Hydraulics/River Control, Maintenance Flood ControlCompletedBaguio City DEO₱47.1M
15PE002610 yrs 9 mo agoREHABILITATION/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG BAGUIO-ITOGON ROAD, K0261+260-K0261+460, ITOGON, BENGUETRoadsCompletedBenguet 1st DEO₱44.8M

Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.