JOMARCANN GENERAL CONSTRUCTION
Contractor 768c5fe0968708324afd
Overview
PhilGEPS awards
₱6.90B · 104 awards
DPWH contracts
₱901.6M · 23 contracts
Rank by recorded value
#445 of 23,487
More info
First record
Jul 11, 2007 (19 yrs 4 mo ago)
Latest record
Apr 29, 2026 (6 mos ago)
DPWH contractor code
30599
Where they work
Latest 23 from a total of 23 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 25P00026 | 6 mos ago | CONSTRUCTION OF NATIONAL BUREAU OF INVESTIGATION (NBI) - CORDILLERA ADMINISTRATIVE REGION (NBI-CAR) OFFICE BUILDING, PHASE I, UPPER SESSION ROAD, BAGUIO CITYGAA 2025 LFP | On-Going | Cordillera Administrative Region | ₱47.9M |
| 25PB0029 | 1 yr 7 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MATALAG (DOWNSTREAM) FLOOD MITIGATION STRUCTURES, STA.33+288-STA.34+248Flood Control and Drainage | On-Going | Apayao 1st DEO | ₱82.0M |
| 24PB0031 | 2 yrs 7 mo ago | CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG), SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES CONSTRUCTION OF BARREN RIVER (DOWNSTREAM) FLOOD CONTROL STRUCTGAA 2024 SSP | On-Going | Apayao 1st DEO | ₱96.7M |
| 19PF0018 | 7 yrs 3 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS BAGUIO-BONTOC ROAD, K0269+240-K0269+270, K0282+850-K028Roads | Completed | Benguet 2nd DEO | ₱70.3M |
| 19PF0021 | 7 yrs 3 mo ago | ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION- REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS, BAGUIO-BONTOC ROAD, K0300+867-K0300+918Roads | Completed | Benguet 2nd DEO | ₱57.8M |
| 19PD0005 | 7 yrs 5 mo ago | CONSTRUCTION OF CONCRETE ROAD-ROAD AT FORT DEL PILAR, CAMP ALLEN AND NAVY BASE, BAGUIO CITY, BENGUETRoads | Completed | Baguio City DEO | ₱39.2M |
| 18PD0133 | 7 yrs 10 mo ago | DRERF-FLOOD CONTROL AND DRAINAGE-DRAINAGE/PROTECTION WORKS: RESTORATION OF VARIOUS PROJECTS IN BAGUIO, DAMAGED BY TY OMPONG-RESTORATION OF COLLAPSED RIPRAP AND ROADSLIP ALONG LOAKAN ROAD, KO250+160-KO252+280Roads | Completed | Baguio City DEO | ₱5.5M |
| 18PF0014 | 8 yrs 8 mo ago | ASSET PRESERVATION OF DAMAGED PAVED NATIONAL ROADS - PREVENTIVE MAINTENANCE ALONG ACOP-KAPANGAN-KIBUNGAN-BAKUN ROAD, K0275+320 - K0276+102, K0281+350 - K0281+550, K0288+000 - K0288+353Roads | Completed | Benguet 2nd DEO | ₱23.8M |
| 18PD0006 | 8 yrs 8 mo ago | NETWORK DEVELOPMENT-ROAD WIDENING: MILITARY CUT-OFF RD. , KO249+(-500)-KO249+(-233)Roads | Completed | Baguio City DEO | ₱19.4M |
| 17PD0146 | 8 yrs 10 mo ago | CY-2017 TVL AND OTHER LABORATORY WORKSHOP BUILDING FOR SHS-CONSTRUCTION OF 4 STOREY-2 REGULAR WORKSHOP, 2 SCIENCE LABORATORY, 2 ICT LABORATORY & 4 CLASSROOMS, STO. TOMAS NATIONAL HIGH SCHOOLBuildings and Facilities | Completed | Baguio City DEO | ₱38.7M |
| 17PD0079 | 8 yrs 10 mo ago | COMPLETION OF SCHOOL BUILDINGS UNDER THE DEPARTMENT OF EDUCATION'S CY 2017 BASIC EDUCATIONAL FACILITIES FUND (BEFF-BATCH 3), 4 STY 20CL SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAINBuildings and Facilities | Completed | Baguio City DEO | ₱1.9M |
| 17PD0147 | 8 yrs 11 mo ago | CY-2017 TVL AND OTHER LABORATORY WORKSHOP BUILDING FOR SHS-CONST. OF 4 STOREY-4 REGULAR WORKSHOP, 2 SCIENCE LABORATORY & 2 ICT LABORATORY, BAGUIO CITY NATIONAL SCIENCE HIGH SCHOOL (SENIOR HIGH SCHOOL-STAND ALONE)Buildings and Facilities | Completed | Baguio City DEO | ₱39.2M |
| 17PF0001 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF TUBLAY CENTRAL FLOOD CONTROLFlood Control and Drainage | Completed | Benguet 2nd DEO | ₱19.6M |
| 17PF0004 | 9 yrs 7 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF GUINAOANG FLOOD CONTROLFlood Control and Drainage | Completed | Benguet 2nd DEO | ₱19.2M |
| 17PD0008 | 9 yrs 8 mo ago | NETWORK DEVELOPMENT -CONSTRUCTION OF BY-PASSES/DIVERSION ROADS, INCLUDING ROW, MARCOS HIGHWAY TO QUIRINO HIGHWAY (BAGUIO-BAUANG ROAD) BY-PASS ROAD, BAGUIO CITYRoads | Completed | Baguio City DEO | ₱47.9M |
| 16PD0009 | 9 yrs 11 mo ago | CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF) - CONSTRUCTION OF 4-STOREY 20 CLASSROOM SENIOR HIGH SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAINBuildings/Industrial Plant-LOW rise, Maintenance Buildings | Completed | Baguio City DEO | ₱31.9M |
| 16PD0031 | 10 yrs 2 mo ago | NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG MARCOS HIGHWAY KO280+(-040)-KO280+480; KO281+130-KO281+195; KO282+815-KO283+008Roads | Completed | Baguio City DEO | ₱29.0M |
| 16PD0010 | 10 yrs 5 mo ago | CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONSTRUCTION OF 4-STOREY 12 CLASSROOM SENIOR HIGH SCHOOL BUILDING, BAGUIO CITY NATIONAL HIGH SCHOOL-MAINBuildings and Facilities | Completed | Baguio City DEO | ₱22.2M |
| 15AI0431 | 10 yrs 8 mo ago | CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM-IMPVT OF BUED RIVER COURSE & DIKE W/ PRFlood Control/Hydraulics/River Control, Roads: Construction - Gravel | Completed | Pangasinan 3rd DEO | ₱42.0M |
| 15AI0437 | 10 yrs 8 mo ago | CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-AGNO RIVER BASIN & ALLIED RIVERS FLOODFlood Control and Drainage | Completed | Pangasinan 3rd DEO | ₱28.4M |
| 15PD0049 | 10 yrs 9 mo ago | CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES/DRAINAGE SYSTEM ALONG CITY CAMP LAGOON FLOOD CONTROL, CITY CAMP LAGOON, BAGUIO CITYFlood Control/Hydraulics/Drainage, Flood Control/Hydraulics/River Control, Maintenance Flood Control | Completed | Baguio City DEO | ₱47.0M |
| 15PD0034 | 10 yrs 9 mo ago | CONST/MAINT OF FL MITIGATION STRUCT AND DRAIN SYST 3. CONST/REH. OF FLOOD MITIGATION ALONG BUED RIVER, BC, LDFlood Control/Hydraulics/Drainage, Flood Control/Hydraulics/River Control, Maintenance Flood Control | Completed | Baguio City DEO | ₱47.1M |
| 15PE0026 | 10 yrs 9 mo ago | REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS W/ SLIPS, SLOPE COLLAPSE & LANDSLIDE ALONG BAGUIO-ITOGON ROAD, K0261+260-K0261+460, ITOGON, BENGUETRoads | Completed | Benguet 1st DEO | ₱44.8M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.