ANTONIO V. NIDEA CONST., INC.(FORMERLY ANTONIO V.
Contractor eff89d161735ac800333
Overview
PhilGEPS awards
₱0 · 0 awards
DPWH contracts
₱471.7M · 12 contracts
Rank by recorded value
#4,244 of 23,487
More info
First record
Jan 24, 2016 (10 yrs 9 mo ago)
Latest record
Apr 12, 2024 (2 yrs 7 mo ago)
DPWH contractor code
6382
Where they work
Latest 12 from a total of 12 DPWH contracts
| Contract ID | Start | Description | Status | Office | Amount |
|---|---|---|---|---|---|
| 24FB0081 | 2 yrs 7 mo ago | OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF REVETMENT WALL AND CHANNEL EXCAVATION ALONG BARANGAY BARIW, CAMALIG, ALBAYFlood Control and Drainage | On-Going | Albay 2nd DEO | ₱46.6M |
| 21FN0090 | 5 yrs 2 mo ago | OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONST. OF FLOOD CONTROL STRUCTURE, DOWNSTREAM ALONG BICOL RIVER, STO. DOMINGO BRIDGE NABUA, CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 5th DEO | ₱33.0M |
| 21FB0108 | 5 yrs 8 mo ago | LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF SIPI-BAÑAG ROAD, DARAGA, ALBAYRoads | On-Going | Albay 2nd DEO | ₱23.6M |
| 19FA0064 | 7 yrs 4 mo ago | CLUSTER 34- REPAIR/CONSTRUCTION/REHABILITATION OF RIVER CONTROL IN THE FIRST DISTRICT OF ALBAYBridges, Flood Control Structures | Completed | Albay 1st DEO | ₱48.0M |
| 16F00127 | 9 yrs 5 mo ago | CLUSTER VI-REHAB./REPAIR OF VARIOUS LOCAL ROADS/OTHER INFRASTRUCTURES AT PIO DURAN, ALBAY 3RD LD, PIO DURAN, ALBAYFlood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry) | On-Going | Region V | ₱56.3M |
| 16F00124 | 9 yrs 5 mo ago | CLUSTER II - REHAB./REPAIR OF VARIOUS LOCAL ROADS/OTHER INFRASTRUCTURE IN CAMALIG, DARAGA AND LEGAZPI CITY, ALBAY 2ND LDRoads | Completed | Region V | ₱15.8M |
| 17FB0075 | 9 yrs 5 mo ago | CONSTRUCTION OF ACCESS ROAD AT BRGY. GAPO, DARAGA, ALBAYRoads | Completed | Albay 2nd DEO | ₱19.4M |
| 17FA0019 | 9 yrs 8 mo ago | CLUSTER 9-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT FATIMA, SAN ROQUE AND STO. CRISTO, TABACO CITY, ALBAY 1ST LDFlood Control and Drainage | Completed | Albay 1st DEO | ₱96.5M |
| 15FL0095 | 10 yrs 7 mo ago | REPAIR/REHAB. OF FLOOD CONTROL STRUCTURE ALONG CADAC-AN RIVER (UPSTREAM, LEFT SIDE) IROSIN, SORSOGONFlood Control and Drainage | Completed | Sorsogon 2nd DEO | ₱27.9M |
| 16FA0014 | 10 yrs 8 mo ago | CONSTRUCTION OF SALVACION SEAWALL, TABACO CITY, ALBAYFlood Control and Drainage | Completed | Albay 1st DEO | ₱49.0M |
| 16FA0007 | 10 yrs 8 mo ago | CONSTRUCTION/ REHABILITATION OF AWANG RIVER CONTROL (DOWNSTREAM) FRANCISCO/ TULIW CREEK, MALINAO, ALBAYFlood Control and Drainage | Completed | Albay 1st DEO | ₱37.1M |
| 16FB0007 | 10 yrs 9 mo ago | CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM-CONST./REHAB. OF FLOOD CONTROL SYSTEM ALONG LAVA GULLY AT MABINIT RIVER,(LEFT SIDE), LEGAZPI CITYFlood Control and Drainage | Completed | Albay 2nd DEO | ₱18.4M |
Records are grouped under one contractor when the names match after removing case, punctuation and notes such as "(formerly …)". Different legal names stay separate. PhilGEPS and DPWH figures can overlap, since one DPWH contract can also appear in PhilGEPS.