Ocampo
Region V (Bicol Region) ›Camarines Sur › City / municipality · PSGC 0501725000
Contract awards located here
16
₱32.6M listed value · PhilGEPS
DPWH contracts located here
80
₱1.53B contract value
COA audit opinion
qualifiedCY2024
COA executive summary 80 DPWH contracts
| Contract ID | Start | Description | Status | Office | Contractor | Amount |
|---|---|---|---|---|---|---|
| 26FG0016 | 4 mos ago | REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BALANGAO BR. (B02379LZ) ALONG PILI-TIGAON-ALBAY BDRY RD.TIGAON, CAMARINES SURGAA 2026 OO-1 | On-Going | Camarines Sur 4th DEO | E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.) | ₱18.6M |
| 25FF0006 | 1 yr 3 mo ago | 001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-PILI TIGAON ALBAY BDRY ROAD-KO457+499-KO459+323,KO459+355.13-KO459+912 OCAMPO CAMARINES SURGAA 2025 OO-1 | On-Going | Camarines Sur 3rd DEO | PHILWORKS CONSTRUCTION AND SUPPLY | ₱94.8M |
| 25FF0028 | 1 yr 6 mo ago | ORGANIZATIONAL OUTCOME 1:ENSURE SAFE & RELIABLE NATL. RD. SYSTEM-WIDENING OF PERMANENT BRIDGES-HIMAAO BR,(B00409LZ) ALONG PILI TIGAON ALBAY BDRY. ROADGAA 2025 OO-1 | On-Going | Camarines Sur 3rd DEO | PHILWORKS CONSTRUCTION AND SUPPLY | ₱30.1M |
| 25FF0001 | 1 yr 7 mo ago | 002;CONST./MAINT. OF FLOOD MITIGATION STRUCTURES& DRAINAGE SYSTEM-CONST. OF FLOOD PROTECTION STRUCTURE ALONG HIBAGO RIVER FLOOD MITIGATION STRUCTURE,RIGHT SIDE UPSTREAM OF HIBAGO RIVER BGY. PINIT OCAMPO CAM SURGAA 2025 OO-2 | Completed | Camarines Sur 3rd DEO | PHILWORKS CONSTRUCTION AND SUPPLY | ₱31.4M |
| 24FF0092 | 2 yrs 2 mo ago | CONCRETING OF FARM TO MILL ROAD,BRGY STO NINO OCAMPO CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | ST. BERNARDINE CONSTRUCTION & ENTERPRISES (FOR. ST | ₱2.8M |
| 24FF0076 | 2 yrs 3 mo ago | CONCRETING OF ZONE 5, BRGY. PINIT FMR,BRGY PINIT OCAMPO CAMARINES SURGAA 2024 DA FMR | Completed | Camarines Sur 3rd DEO | BICOL GOLDROCK CONSTRUCTION CORPORATION | ₱16.9M |
| 24FF0079 | 2 yrs 4 mo ago | CONSTRUCTION OF SCHOOL BUILDING, OCAMPO CENTRAL SCHOOL, BRGY. POBLACION CENTRAL, OCAMPO CAMARINES SURBuildings and Facilities | Completed | Camarines Sur 3rd DEO | PHIL MANNA CONSTRUCTION AND SUPPLY | ₱4.9M |
| 24FG0079 | 2 yrs 4 mo ago | ROAD WIDENING ALONG PILI-TIGAON-ALBAY BOUNDARY ROAD, K0473+(-831.00) - K0473+718.80, TIGAON, CAMARINES SURGAA 2024 OO-1 | On-Going | Camarines Sur 4th DEO | E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.) | ₱81.5M |
| 24FF0061 | 2 yrs 6 mo ago | CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT),BRGY GUINABAN OCAMPO CAMARINES SURBuildings and Facilities | Completed | Camarines Sur 3rd DEO | PHIL MANNA CONSTRUCTION AND SUPPLY | ₱4.9M |
| 24FF0052 | 2 yrs 6 mo ago | BIP;ACCESS ROADS &/OR BRIDGES FROM THE NATL. ROAD LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES CONST. OF ACCESS ROAD, BRGY. PINIT OCAMPO CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | PHIL MANNA CONSTRUCTION AND SUPPLY | ₱7.7M |
| 24FF0039 | 2 yrs 7 mo ago | 001;ASSET PRESERVATION PROG.-PREVENTIVE MAINT.-SECONDARY ROADS-PILI TIGAON -ALBAY BOUNDARY ROAD-KO457+000-KO457+054,KO457+085-KO459+323,KO459+355.13-KO460+095.40 OCAMPO CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | NFH CONSTRUCTION & SUPPLY | ₱58.3M |
| 24FF0005 | 2 yrs 8 mo ago | 001;BRIDGE PROGRAM-RETROFITTING/STRENGHTENING OF PERMANENT BRIDGES SECONDARY ROADS AYUGAN BR. (BOO410LZ) ALONG PILI-TIGAON-ALBAY BDRY. ROAD OCAMPO CAMARINES SURBridges | Completed | Camarines Sur 3rd DEO | EC STRUCTURAL COMPOSITES, INC. | ₱15.4M |
| 23FF0088 | 3 yrs 1 mo ago | 001:ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY-IRIGA CITY-SAGRADA-SN RAMON-HANAWAN RD.-KO491+(-476)-KO 491+160,KO491+175.05-KO493+395, OCAMPO CAMARINES SURGAA 2023 OO-1 | Completed | Camarines Sur 3rd DEO | STEVEN CONSTRUCTION AND SUPPLY | ₱85.7M |
| 23FF0083 | 3 yrs 2 mo ago | CONSTRUCTION /REHAB. OF WATER SUPPLY SEPTAGE & SEWERAGE/RAIN WATER COLLECTORS WATER SUPPLY SYSTEM-CONST. OF SOLAR WATER SYSTEM BRGY. CABARIWAN ,OCAMPO CAMARINES SURGAA 2023 CSSP | Completed | Camarines Sur 3rd DEO | PHIL MANNA CONSTRUCTION AND SUPPLY | ₱9.7M |
| 23FF0072 | 3 yrs 4 mo ago | CONCRETING OF SITIO BAGNUSAN FMR BRGY HIBAGO OCAMPO CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | BIG J CONSTRUCTION AND SUPPLY | ₱4.9M |
| 23FF0067 | 3 yrs 4 mo ago | CONCRETING OF BRGY. LA PURISIMA NUEVO FMR BRGY. LA PURISIMA NUEVO OCAMPO CAMARINES SURRoads | Completed | Camarines Sur 3rd DEO | PHIL MANNA CONSTRUCTION AND SUPPLY | ₱11.8M |
| 23FF0064 | 3 yrs 4 mo ago | 001;NETWORK DEVELOPMENT PROGRAM-OFF CARRIAGEWAY IMPROVEMENT SECONDARY ROADS-IRIGA CITY-SAGRADA-SAN RAMON-HANAWAN ROAD KO491+(-476)-KO491+160,KO491+175.05-KO493+395 OCAMPO CAMARINES SURRoads | Terminated | Camarines Sur 3rd DEO | STEVEN CONSTRUCTION AND SUPPLY | ₱0 |
| 23FF0054 | 3 yrs 5 mo ago | 002;FLOOD MANAGEMENT PROG.-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM -CONST. OF HIBAGO FLOOD CONTROL OCAMPO CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 3rd DEO | FP5 CONSTRUCTION & DEVELOPMENT CORPORATION (FORMERLY: JS & V ENTERPRISES GENERAL CONTRACTOR, INC.) (10420) / PHILWORKS CONSTRUCTION & SUPPLY | ₱48.5M |
| 23FF0008 | 3 yrs 7 mo ago | 002:CONSTRUCTION /REHAB. OF FLOOD PROTECTION MEASURES ALONG HIBAGO RIVER FLOOD MITIGATION STRUCTURE LEFT SIDE DOWNSTREAM OF HIBAGO BRIDGE BRGY. PINIT OCAMPO CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 3rd DEO | CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | ₱57.2M |
| 23FF0024 | 3 yrs 8 mo ago | CONSTRUCTION OF MULTI PURPOSE BUILDING MUNICIPAL COMPLEX POBLACION WEST OCAMPO CAMARINES SURBuildings and Facilities | Completed | Camarines Sur 3rd DEO | AE BELLEZA BUILDERS | ₱6.9M |
| 23FF0004 | 3 yrs 8 mo ago | 002;CONSTRUCTION/REHAB, OF FLOOD PROTECTION MEASURES ALONG HIBAGO RIVER FLOOD MITIGATION STRUCTURE,RIGHT SIDE DOWNSTREAM OF HIBAGO BRIDGE BRGY. HIBAGO OCAMPO CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 3rd DEO | CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | ₱57.1M |
| 23FF0019 | 3 yrs 8 mo ago | 002;CONST./REHAB/OF FLOOD PROTECTION MEASURES ALONG HIBAGO RIVER FLOOD MITIGATION STRUCTURE,RIGHT SIDE,UPSTREAM OF HIBAGO BRIDGE BRGY. PINIT OCAMPO CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 3rd DEO | PHILWORKS CONSTRUCTION AND SUPPLY | ₱57.2M |
| 23FF0020 | 3 yrs 8 mo ago | 002;CONSTRUCTION OF FLOOD MITIGATION MEASURE ALONG HIBAGO RIVER LEFT SIDE,UPSTREAM OF HIBAGO BRIDGE,BRGY. HIBAGO OCAMPO CAMARINES SURFlood Control and Drainage | Completed | Camarines Sur 3rd DEO | PHILWORKS CONSTRUCTION AND SUPPLY | ₱86.0M |
| 21FG0112 | 3 yrs 11 mo ago | CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM - RAINWATER COLLECTOR IN PUBLIC FACILITIES, CAMARINES SUR 4TH DISTRICT ENGINEERING OFFICEWater Provision and Storage | Completed | Camarines Sur 4th DEO | HRB CONSTRUCTION | ₱4.3M |
| 22FF0066 | 4 yrs 5 mo ago | CONSTRUCTION OF MULTI PURPOSE BUILDING,PHASE 2 ,OCAMPO CAMARINES SURBuildings and Facilities | Completed | Camarines Sur 3rd DEO | E.S. BIHAG CONSTRUCTION & SUPPLY | ₱9.8M |
Records are placed by the location the source gives. Some national-level awards and DPWH contracts have no location and are not counted here.