Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15AI0429

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15AI0429","CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM-IMPVT OF BUED RIVER COURSE & BANK PROTE","Flood Control/Hydraulics/River Control, Roads: Construction - Gravel","Completed",43544275.94,0,100,"Pangasinan 3rd DEO","Region I","A.P.B. CONSTRUCTION (17055)","2016-02-29","2016-11-12",2016,"Regular Infra - Flood Control/Hydraulics/River Control, Roads: Construction - Gravel",null,null,null,"105500000"]
SHA-256
c90aca62eea25d4778bd38e410fdc8e8a2b9144234c9418afd0c5f7f3a7f3d43

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.