Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15BD0147

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15BD0147","CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE (GABION W/ STEEL SHEET PILES), MINANGA, IGUIG, CAGAYAN","Flood Control and Drainage","Completed",38801729.79,0,100,"Cagayan 3rd DEO","Region II","E. GUADIZ CONSTRUCTION (27172) / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2016-03-08","2017-03-10",2016,"Regular Infra - GAA 2016 MFO-2",17.76401,121.72506,"201515000","201500000"]
SHA-256
12ef86bf17b2ba6d71c4b0a362ffaa942fecb5eac0d4e405415c9bd596795bfc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.