Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15C00089

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15C00089","ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARD (HDM-4 PROJECT ANALYSIS), SECONDARY ROADS, DINADIAWAN-MADELLA ROAD, PROVINCE OF AURORA","Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP","Completed",138933189.17,0,100,"Region III","Region III","CHRISTIAN IAN CONSTRUCTION CORPORATION (8191)","2016-03-22","2016-12-11",2016,"Regular Infra - Flood Control/Hydraulics/Drainage, Roads: Construction - PCCP",16.10882,121.78093,"307706000","307700000"]
SHA-256
da79c8e7a89f9f6e2fe2fb052fa186a3e7fcef87a6bbdd484d7c933549d3df26

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.