Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15CE0166

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15CE0166","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION/IMPROVEMENT OF CABULINAWAN RIVER CONTROL, BRGY. PUNCAN, CARRANGLAN, NUEVA ECIJA","Flood Control and Drainage","Completed",18620911.58,0,100,"Nueva Ecija 1st DEO","Region III","DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)","2016-01-31","2016-05-19",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"304900000"]
SHA-256
d8110a33eefcf7f13e6801a41917abf196b3743540af23b5675c59ce4296b6fb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.