Project 15DP0119
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15DP0119","FLOOD CONTROL PROJECTS BASED ON FLOOD MASTER PLAN FOR METRO MANILA AND SURROUNDING AREAS CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM AND DOWNSTREAM) OF MAGAMPON BRIDGE, SAN PABLO CITY, LAGUNA 3RD LD","Flood Control and Drainage","Completed",27341820.2,0,100,"Laguna 3rd DEO","Region IV-A","STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) (26096)","2016-02-23","2016-09-19",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"403400000"]
SHA-256
12633e8045067bc794c8902e22dda077b5fef0a893a06884b7a8369cc97fb985Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.