Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15HC0205

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15HC0205","CONSTRUCTION AND MAINTENACE OF FLOOD  MITIGATION STRUCTURE AND DRAINAGE SYSTEM @ BACANI, CLARIN, BOHOL","Flood Control and Drainage","Completed",4570000,0,100,"Bohol 2nd DEO","Region VII","MAI CONSTRUCTION & SUPPLY (30839)","2016-02-09","2016-04-23",2016,"Regular Infra - GAA 2016 MFO-2",9.96601,124.03628,"701214000","701200000"]
SHA-256
00fc0fc6993c5e9f7013310aa3bbcac612539faeb94cc41cd224a5a724b5b218

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.