Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15HM0102

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15HM0102","CONSTRUCTION OF FLOOD CONTROL STRUCTURE/DRAINAGE STRUCTURE ALONG SIQUIJOR CIRCUMFERENTIAL ROAD, SIQUIJOR","Flood Control and Drainage","Completed",18619999.95,0,100,"Siquijor DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2016-03-07","2017-02-17",2016,"Regular Infra - GAA 2016 MFO-2",9.29421,123.6243,"1806101000","1806100000"]
SHA-256
be0e57bda8bd8caa971859004aecfcbd9e5edc892bbf146a0820e54f608deb5a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.