Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15IB0255

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15IB0255","CONSTRUCTION OF RIVER CONTROL, BRGY. RIZAL, DOLORES, EASTERN SAMAR","Flood Control and Drainage","Completed",9549824.58,0,100,"Eastern Samar DEO","Region VIII","A.C. RIVERO DEVELOPMENT CORPORATION (5122)","2016-02-10","2016-06-08",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"802600000"]
SHA-256
f182302aa05d47688472266e291a6973e21a33ac1903d2ad2aca78aae08080f0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.