Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15L00049

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15L00049","CONSTRUCTION OF GUYON BRIDGE 2 AND APPROACHES ALONG DAANG MAHARLIKA (MN), COMPOSTELA VALLEY","Bridges-Construction-Concrete, Flood Control/Hydraulics/Drainage","Completed",38935851.35,0,100,"Region XI","Region XI","AAA ROCK CONSTRUCTION CORPORATION (FORMERLY: DAVAO ROCK MIXER ENTERPRISES) (19250) / ALLADO CONSTRUCTION COMPANY INC. (228)","2016-02-16","2016-11-11",2016,"Regular Infra - Bridges-Construction-Concrete, Flood Control/Hydraulics/Drainage",7.73228,125.99267,"1108208000","1108200000"]
SHA-256
f278471895073b79e3f0c17c1e1377dfb465fb00a46d63137218da5d1901d2fe

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.