Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15LH0219

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15LH0219","PACKAGE  48- ROAD CONCRETING AT 1) BRGY. TUGBOK PROPER, TUGBOK DISTRICT, D.C. 2) BRGY. BAGO OSHIRO,","Roads","Completed",9799996.14,0,100,"Davao City 2nd DEO","Region XI","DECKTOP BUILDERS CORPORATION (FORMERLY: DAVAO ENGI (30944)","2016-03-04","2016-05-21",2016,"Regular Infra - GAA 2016 Locally Funded Projects",null,null,"1130700000","1102400000"]
SHA-256
450eb9d36db141106919cde04acb0b5fd5907e96e025cf56b44349dd3a0199d5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.