Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15M00130

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15M00130","CONSTRUCTION OF ALA BRIDGE (APROACHES) ALONG MARBEL-ALLAH VALLEY-COTABATO ROAD, STA. 1772+815-STA.1773+392 9 (W/ EXCEPTION) ESPERANZA, SULTAN KUDARAT.","Bridges","Completed",22150110.06,0,100,"Region XII","Region XII","AJYSC MARKETING (26924)","2016-03-29","2016-12-18",2016,"Regular Infra - GAA 2016 MFO-1",6.67484,124.56894,"1206504000","1206500000"]
SHA-256
b147a46dab4307a9473a3fd771cb6e6567635d812aa53149040c6be2c975ed18

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.