Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15MD0281

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15MD0281","CONST. OF LUMAYONG FLOOD CONTROL PROJECT, KABACAN, COTABATO","GAA 2016 MFO-2","Completed",47387311.92,0,100,"Cotabato 1st DEO","Region XII","FFJJ CONSTRUCTION (16712) / MARCUS CONSTRUCTION & SUPPLY (12601)","2016-02-18","2016-11-30",2016,"Regular Infra - GAA 2016 MFO-2",7.14048,124.80199,"1204703000","1204700000"]
SHA-256
9a3e664ceed80508d0712ca3745100df9a12826d2297d605ad3dfad1470ac29b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.