Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15OD0138

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15OD0138","CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANKS OF VARIOUS CREEKS IN BRGY. 181, CALOOCAN CITY","Flood Control and Drainage","Completed",13302558.84,0,100,"Metro Manila 3rd DEO","National Capital Region","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2016-02-29","2016-07-13",2016,"Regular Infra - GAA 2016 MFO-2",14.77086,121.08779,"1380100000","1307500000"]
SHA-256
e7ad96174aedd808039e47b40c89b84f309115ca7ebe5fc1c7558b2bbbbc9b50

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.