Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15OD0205

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15OD0205","CONSTRUCTION OF FLOOD CONTROL WALL/ RIPRAPPING ALONG THE BANKS OF VAIOUS CREEKS IN BRGY.170, CALOOCAN CITY, 1ST LD","Flood Control and Drainage","Completed",17748229.6,0,100,"Metro Manila 3rd DEO","National Capital Region","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2016-03-07","2016-06-30",2016,"Regular Infra - GAA 2016 MFO-2",14.74403,121.02493,"1380100000","1307500000"]
SHA-256
e907080e006f2f9812f5ebe0a55bb51d903118d0cfa96c7f7bc505c80916c26a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.