Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15OI0123

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15OI0123","CONSTRUCTION OF FLOOD CONTROL STRUCTURE FROM BRUGER STREET TO SAN GUILLERMO STREET, BRGY. PUTATAN, M","Flood Control and Drainage","Completed",9095976.18,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","RUBY-JADE CONSTRUCTION (19202)","2016-02-03","2016-07-31",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,null]
SHA-256
ce31a8da3a130b8a5801f2ffe0923dfb2da658ce807e9c3da847f3dfc98e4ac7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.