Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 15PD0061

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","15PD0061","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES/DRAINAGE SYSTEM ALONG CRYSTAL CAVE TO ASIN FLOOD CONTROL, CRYSTAL CAVE TO ASIN, BAGUIO CITY","Flood Control/Hydraulics/Drainage, Flood Control/Hydraulics/River Control, Maintenance Flood Control","Completed",46929792.19,0,100,"Baguio City DEO","Cordillera Administrative Region","R.S. SEPIAN CONSTRUCTION & TRUCKING (20519)","2016-02-25","2016-12-02",2016,"Regular Infra - Flood Control/Hydraulics/Drainage, Flood Control/Hydraulics/River Control, Maintenance Flood Control",16.39858,120.57693,"1401113000","1401100000"]
SHA-256
8b11fdae5d190043271980ceb8041c7b7cf47d0b5493f41708ff98d4845e6a53

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.