Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16AA0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16AA0040","DAMAGED FC FACILITIES/STRUCTURES UNDER THE LRBFC & SABO PROJS, PAGUDPUD FC, CABACANAN FC, # BADUANG,","Flood Control and Drainage","Completed",14331652.59,0,100,"Ilocos Norte 1st DEO","Region I","RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY (21616) / RCDG CONSTRUCTION CORPORATION (5063)","2016-03-13","2016-08-27",2016,"Regular Infra - GAA 2016 MFO-2",18.57236,120.81043,"102815000","102800000"]
SHA-256
be156d313dcbfc743736b09c98045df0d62fd85f84de4763933db49badf2d51f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.