Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16AB0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16AB0008","CONST/MAINT FLOOD MITIGATION STRUCTURES & DRAINAGE SYS,SABO/FLOOD CTRL PROJS ALONG LAOAG RIVER BASIN & PRINCIPAL RIVERS/TRIBUTARIES-CONST FLOOD CTRL STRUCTURES ALONG QUIAOIT RIVER,BRGY. SAN AGUSTIN,CALLAGUIP,LAOA,SAN ROQUE,PAOAY & PALPALICONG,BATAC,I.N.","Flood Control and Drainage","Completed",41158317.93,0,100,"Ilocos Norte 2nd DEO","Region I","RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY (21616) / RCDG CONSTRUCTION CORPORATION (5063)","2016-01-25","2016-12-04",2016,"Regular Infra - GAA 2016 MFO-2",null,null,null,"102800000"]
SHA-256
40865e56b8381792e235a7805999be7f7a2a5590c4e603e808f7f31b0c415bd4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.