Project 16AB0085
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-16AB0085",
"title": "CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, LAOAG RIVER BASIN FC AND SABO PROJECT (LRBFCSP)-REHAB. OF DIKE SYSTEM ALONG PAPA RIVER (ERODED DIKE), LEFT AND RIGHT BANK, BANNA-NUEVA ERA, ILOCOS NORTE",
"sector": [
"Flood Control and Drainage"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Ilocos Norte 2nd DEO"
},
"period": {
"startDate": "2016-03-29",
"endDate": "2016-09-09"
},
"budget": {
"amount": {
"amount": 10651358.69,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
120.72234,
17.96309
]
}
}
],
"parties": [
{
"name": "ZEDIK BUILDERS",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "16AB0085",
"summary": {
"title": "CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, LAOAG RIVER BASIN FC AND SABO PROJECT (LRBFCSP)-REHAB. OF DIKE SYSTEM ALONG PAPA RIVER (ERODED DIKE), LEFT AND RIGHT BANK, BANNA-NUEVA ERA, ILOCOS NORTE",
"status": "closed",
"contractValue": {
"amount": 10651358.69,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - GAA 2016 MFO-2",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "a8af649d00cb7847c2ae9a6b61c5e6f409f2bee7d4f3a1900ee9845d3f215000"
}
}