Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16AC0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16AC0051","CONSTRUCTION OF RIVER FLOOD CONTROL, GABION REVETMENT WALL/STONE MASONRY, LAOINGEN, STO. DOMINGO, IS","Flood Control and Drainage","Completed",6799602,0,100,"Ilocos Sur 1st DEO","Region I","FIT CONSTRUCTION (35857)","2016-03-29","2016-09-22",2016,"Regular Infra - GAA 2016 Locally Funded Projects",null,null,null,"102900000"]
SHA-256
b09b8deb8088d7e47768eace6d9005333a8dcbc9f5387263cf3530016e0413ac

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.