Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16AD0140

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16AD0140","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES: CONSTRUCTION OF USO RIVER CONRTOL ALONG CHICO RIVER, BRGY. USO, SUYO, ILOCOS SUR","Flood Control and Drainage","Completed",9665934.09,0,100,"Ilocos Sur 2nd DEO","Region I","E.E. MADAYAG CONSTRUCTION (25029)","2017-03-14","2017-05-29",2017,"Regular Infra - GAA 2017 MFO-2",16.96874,120.54458,"102932000","102900000"]
SHA-256
459411f00fca1bba9fd38377597e4ce9578ba5667227850f34c24992bca9e31c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.