Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16BB0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16BB0043","CONSTRUCTION OF CAGAYAN RIVER CONTROL, TUPANG SECTION, ALCALA, CAGAYAN","GAA 2016 MFO-2","Completed",46108684.42,0,100,"Cagayan 1st DEO","Region II","E.V. INTERIOR CONSTRUCTION (39699) / ED1SON DEVELOPMENT & CONSTRUCTION INC. (2400)","2016-08-02","2019-07-01",2016,"Regular Infra - GAA 2016 MFO-2",17.9039,121.64071,"201502000","201500000"]
SHA-256
1080766a05466e1a9b1c6a943da1a49bb54e0ec996222ea501e9164de57f8a1c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.