Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16C00085

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16C00085","FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES","Flood Control and Drainage","Completed",420445870.04,0,100,"Flood Control Management Cluster","Central Office","HORAMABI BUILDERS (24129) / R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507)","2017-03-08","2019-12-11",2016,"Regular Infra - GAA 2016 MFO-2",15.26444,120.03472,"307101000","307100000"]
SHA-256
165bbd16dfd173e58df0da4e4b4fe1a6bdded3b647d993aa3323727aa2fc7a2c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.