Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 16CB0116

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","16CB0116","CONSTRUCTION OF THREE(3) STOREY NINE(9) CLASSROOM AT BATAAN SCHOOL OF FISHERIES ORION BATAAN","Buildings and Facilities","Completed",16799635.87,0,100,"Bataan 2nd DEO","Region III","VF CONSTRUCTION (10048)","2017-07-31","2018-04-26",2016,"Outside Infra - GAA 2016 DepED BEFF",null,null,null,"300800000"]
SHA-256
8d7434a46f8d399b1b21ec6007444fc9393e2b9a1034fc0252c144679dfc87be

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.